Solicitations

RFQ 713-16Q Stand-up Paddle Boards

Issue Date: 05/27/16 • Due Date: 06/03/16

713-16Q Stand-up Paddle Boards (97.0 KiB)

Awarded:


RFQ 712-16Q SMART UPS Units

Issue Date: 05/20/16 • Due Date: 05/27/16

712-16Q SMART UPS Units (127.7 KiB)

Addendum 001 712-16 (73.8 KiB)

Awarded:


RFQ 711-16Q Parking Lot LED Fixtures Breckenridge

Issue Date: 05/11/16 • Due Date: 05/25/16

711-16Q Bid Sheet (13.3 KiB)

711-16Q Parking Lot LED Fixtures (120.6 KiB)

Addendum 001 (87.3 KiB)

CMC Parking Lot 2 (77.9 KiB)

Lighting Specification Sheet (2.4 MiB)

Awarded:


RFP 710-16P Vet. Tech. Water Line Replacement

Issue Date: 05/02/16 • Due Date: 05/27/16  05/31/16

710-16P Vet Tech Water Line (173.8 KiB)

Addendum 001 (75.5 KiB)

Overall Water System SVC (9.3 MiB)

Sign In Sheet 710-16P (638.4 KiB)

Vet Tech Waterline Repair 4-29 - 2016 (37.5 KiB)

Awarded:


RFP 709-16P Parking Lot Maintenance Edwards

Issue Date: 04/21/16 • Due Date: 06/06/16

709-16P Parking Lot Maintenance Edwards Campus 1 (172.0 KiB)

Addendum 001 (436.8 KiB)

Sign In Sheet 709-16P (78.0 KiB)

Awarded:


RFP 708-16P Computer Job Skills Workshop (CJSW)

Issue Date: 04/21/16 • Due Date: 05/12/16

708-16P Computer Job Skills Workshops (180.5 KiB)

Awarded:


RFP 707-16P Rocky Mountain Fen Research Project

Issue Date: 04/13/16 • Due Date: 05/27/16

707-16P Exhibit C (2.5 MiB)

707-16P Rocky Mountain Fen Research (147.9 KiB)

Addendum 001 (31.8 KiB)

Fen Reaper (10.3 MiB)

Inserts - ACAD Drawings 1-4 (10.0 MiB)

Inserts - ACAD Drawings 5-7 (5.6 MiB)

Revised Stockpile Area (899.2 KiB)

RMFRP Bid Sheet (14.2 KiB)

RMFRP Timeline (75.7 KiB)

Awarded:


RFP 706-16P Crown Point Addition/Remodel

Issue Date: 04/01/16 • Due Date: 04/29/16

14240 Elev Spec (18.0 KiB)

15173 MEP ELEVATOR REMODEL LEADVILLE CMC (1.0 MiB)

A11 (718.7 KiB)

A21 (1.2 MiB)

A22 (1.2 MiB)

A31 (616.8 KiB)

A41 (605.9 KiB)

A51 (2.0 MiB)

Addendum 001 Combined Files (246.8 KiB)

Arch Specs Part 1 (1.0 MiB)

Arch Specs Part 2 (3.0 MiB)

CMC STRUCTURAL LEADVILLE PLANS (1.6 MiB)

Crown Point RFP Budget (40.0 KiB)

CVR (1.4 MiB)

MEP Specs (3.4 MiB)

RFP-706-16P Crown Point Addition-Remodel (166.7 KiB)

Sign-In Sheet 706-16P (69.9 KiB)

Short List Candidates:

  • Dare-Case Contracting Services, LLC
  • KW Construction & Restoration

Awarded:


RFQ 705-16Q Mountain View Res. Hall Corridor Lighting

Issue Date: 03/30/16 • Due Date: 04/18/16

705-16Q Mountain View Res Hall Corridor Lighting (120.6 KiB)

Target Award Date: 05/06/16

Awarded: Voss Lighting


RFP 704-16P Foundation Audit & Tax Services

Issue Date: 03/29/16 • Due Date: 04/18/16

704-16P Addendum 001 (78.7 KiB)

704-16P Foundation Audit & Tax Services (169.6 KiB)

990 Form (560.5 KiB)

CMCf AUDIT - 2015 Final (951.8 KiB)

Short List Candidates:

  • Kundinger, Corder & Engle, PC
  • McMahan And Associates, LLC

Awarded:


RFP 703-16P Aspen Locker Room Remodel

Issue Date: 03/22/16 • Due Date: 04/19/16

703-16P A21 Revised (2.0 MiB)

703-16P Aspen Locker Room Remodel (168.1 KiB)

703-16P Photo Of Finish For Aspen Locker Remodel (1.7 MiB)

Shower Plan 703-16P (267.4 KiB)

Sign-In Sheet 703-16P (92.7 KiB)

Mandatory Walkthrough: 03/31/16 to 03/30/16

Awarded: MM-Eight (conditional)


RFP 702-16P Operable Window Conversion CS

Issue Date: 03/17/16 • Due Date: 04/26/16

702-16P Operable Window Conversion (166.3 KiB)

Sign-In Sheet 702-16P (62.4 KiB)

Awarded: Elmer Glass (conditional)


RFQ 701-16Q 12 Passenger Van RFC

Issue Date: 03/15/16 • Due Date: 03/31/16

701-16Q 12 Passenger Van (120.4 KiB)

Awarded:


RFP 700-16P SVC Interior/Exterior Painting

Issue Date: 03/21/16 • Due Date: 04/15/16

700-16P Addendum 001 (71.3 KiB)

700-16P SVC Interior-Exterior Painting (165.3 KiB)

Bid Sheet 700-16P (15.1 KiB)

Sign-In Sheet SVC Interior Exterior Painting (30.3 KiB)

Short List Candidates:

  • Southwestern Painting
  • Steve Molinari Painting LTD

Awarded:


RFQ 699-16Q Laser Engraver New Media RFC

Issue Date: 03/07/16 • Due Date: 03/16/16

699-16Q Bid Sheet (12.4 KiB)

699-16Q Laser Engraver RFC New Media (119.1 KiB)

Awarded:


RFP 698-16P Rifle Campus Driveway Access Improvements

Issue Date: 03/03/16 • Due Date: 04/08/16

15206 Rifle CMC Design (364.6 KiB)

698-16P Rifle Campus Driveway Access Improvement (165.7 KiB)

Bid Schedule Document 15206 RL Driveway Access Imp (727.5 KiB)

Contractor Sign In RFP 698-16P (822.2 KiB)

Awarded:  Tamerrel Excavation Inc.


RFP 697-16P Financial Advisor

Issue Date: 03/02/16 • Due Date: 03/24/16

697-16P Financial Advisor (125.2 KiB)

697-16P Financial Advisor Addendum 001 (58.7 KiB)

FACILITIES MASTER PLANNING PROCESS 2016 (002) (72.8 KiB)

March 4 2016 Board Update Rev 1 (97.8 KiB)

Short List Candidates

  • Blue Rose Capital Advisors
  • DA Davidson
  • North Slope Capital Advisory
  • The PFM Group

Target Award Date: 04/30/16

Awarded:


RFQ 696-16Q Folding Classroom Tables Leadville

Issue Date: 02/18/16 • Due Date: 02/23/16

696-16Q Classroom Tables Leadville Campus (120.4 KiB)

Awarded: Mity-Lite


RFQ 695-16Q Motor Pool Vehicle for College President

Issue Date: 02/16/16 • Due Date: 02/19/16

695-16Q Motor Pool Vehicle For President (120.4 KiB)

Target Award Date: 05/19/16

Awarded:


RFQ 694-16Q Trimble Survey Unit & Accessories

Issue Date: 02/08/16 • Due Date: 02/16/16

694-16Q Trimble Bid Sheet (13.1 KiB)

RFQ-694-16Q Trimble (119.0 KiB)

Awarded: Frontier Precision


RFP 693-16P Compliance Review of Grants

Issue Date: 02/05/16 • Due Date: 02/26/16

693-16P Addendum 001 (97.9 KiB)

RFP 693-15 Compliance Review Of Grants (172.7 KiB)

Questions due answered: 02/22/16

Short List Candidates

  • Baer Financial Group
  • Clifton Larson Allen
  • Colorado Independent Consultants
  • Rubin Brown

RFP Due: 2/26/162/29/16

Awarded: Baer Financial Group


RFP 692-16P WiQ
(Leadville, Spring Valley & Steamboat Springs Campuses)

Issue Date: 01/28/16 • Due Date: 03/17/16

692-16P WiQ (174.9 KiB)

LeadvilleWiQ (49.7 KiB)

WiQ Access Control Hardware Spec (REV 1) (77.5 KiB)

No questions submitted by vendors attending Mandatory Walkthrough

Awarded: Colorado Doorways


RFP 691-16P Residence Hall Remodels
(Leadville and Spring Valley Campuses)

Issue Date: 01/25/16 • Due Date: 03/10/16

691-16P LeadvilleResidentHallSignInSheet (419.4 KiB)

691-16P Res Hall Remodel Addendum 001 (89.2 KiB)

691-16P Residence Hall RemodelsV2 (160.8 KiB)

691-16P SVCSignInSheet (625.8 KiB)

A21 (788.2 KiB)

A22 (2.0 MiB)

Blank Bid Tab For Fire Suppression System-02.04.2016 (36.7 KiB)

CMC SPECIAL CONDITIONS-02.04.2016 (120.3 KiB)

CMC SV Academic Center FP-sprinklers R Us (651.5 KiB)

Revised Kitchen Layout 1-29-16 (107.5 KiB)

Awarded: Hess Contracting Inc. and ResCom Construction LLC.


RFQ 690-16Q Copier Spring Valley Campus

Issue Date: 01/28/16 • Due Date: 02/09/16

Comparison Sheet RFQ-690-16Q (21.1 KiB)

RFQ-690-16Q Spring Valley Campus Copier1 (122.3 KiB)

Awarded: Capital Business Solutions


RFQ 689-16Q Digital Media Equipment RFC

Issue Date: 01/27/16 • Due Date: 02/04/16

689-16Q RFC Digital Media Equipment (120.5 KiB)

RFC Digital Media (17.4 KiB)

Awarded: Adorama


RFQ 688-15Q Cafeteria Furniture Spring Valley Campus

Issue Date: 01/08/16 • Due Date: 01/25/16

688-15Q Spring Valley Cafeteria Furniture (120.8 KiB)

688-16P Bid Sheet Cafeteria Furniture (13.2 KiB)

Awarded: Canter & Associates


RFP 687-15P Heating Valve & Actuator Replacement Hill Hall

Issue Date: 01/06/16 • Due Date: 2/11/16

687-15P Heating Valve & Actuator Replacement (168.4 KiB)

687-15P Heating Valve & Actuator Sign In Sheet (371.1 KiB)

Addendum 001 687-16P (78.7 KiB)

M1.1 (1.8 MiB)

M1.2 (1.6 MiB)

M1.3 (1.7 MiB)

M1.4 (1.5 MiB)

M2.1 (1.5 MiB)

Awarded: Tolin Mechanical


RFP 686-15P Module Replacement Hill Hall

Issue Date: 12/22/15 • Due Date: 2/9/16

686-15P Module Replacement Sign In Sheet (573.4 KiB)

RFP-686-15P Module Replacement Hill Hall 1 (190.2 KiB)

Awarded: ATS Rocky Mountain


RFQ 685-15Q LED Lighting Hill Hall

Issue Date: 12/10/15 • Due Date: 12/16/15

685-15Q Bid Sheet (13.3 KiB)

685-15Q Hill Hall LED Lighting (148.7 KiB)

Awarded: Not Awarded


RFI 684-15I Refinance of Certificates of Participation

Issue Date: 11/20/15 • Due Date: 11/30/15

684-15I Refinance Of Certificates Of Participation (102.3 KiB)

Awarded: CMC appreciates 8 firms submitting responses to this RFI. We expect to issue a formal RFP in mid to late January. All firms that submitted a response to the RFI will be notified of the RFP upon its issuance. Thank you.


RFP 683-15P Procurement Card Services (P-card)

Issue Date: 12/22/15 • Due Date: 1/29/16

683-15P P-card Provider Bidsheet1 (19.0 KiB)

683-15P Procurement Card Services 1 (288.6 KiB)

Addendum 001 RFP (68.9 KiB)

Short List of Vendors Announced- 02/16/16, 03/24/16

Short List Candidates

  • Citibank
  • PNC
  • UMB
  • USbank

Target Award Date: 05/20/16

Awarded:


RFP 682-15P Cisco WebEx Enterprise for Education

Issue Date: 11/17/15 • Due Date: 12/16/15

682-15P Cisco WebEx Addendum 002 (80.9 KiB)

682-15P Cisco WebEx Enterprise For Education (150.1 KiB)

Addendum 001 682-15P (72.1 KiB)

Short List: 02/05/2016

Candidate Interviews: 02/23/2016

Target Award: 03/15/2016

Awarded: Flair Data Systems, Inc.


RFQ 681-15Q Kiosk Stands

Issue Date: 11/12/15 • Due Date: 11/20/15

681-15Q Kiosk Stands (130.5 KiB)

Awarded: CDW-G


RFP 680-15P Insurance Broker

Issue Date: 11/06/15 • Due Date: 12/02/15

680-15P Insurance Broker Addendum 001 (90.9 KiB)

680-15P Insurance Broker Addendum 002 (71.2 KiB)

CMC Insurance Summary (13.3 KiB)

RFP-680-05P Insurance Broker (165.7 KiB)

Short List Candidates

  • Arthur J. Gallagher & Co.
  • Alliant Insurance Services, Inc.
  • IMA
  • Flood & Peterson

Awarded: IMA


RFP 679-15P ASL Interpretation Summit Campus

Issue Date: 11/03/15 • Due Date: 11/19/15

679-15P ASL Interpretation Summit Campus (147.7 KiB)

Awarded: No Award


RFP 678-15P Campus Security Consultant

Issue Date: 10/20/15 • Due Date: 11/18/15

678-15P Campus Security Consultant (173.2 KiB)

Addendum 001 Campus Security Consultant (64.5 KiB)

Addendum 002 RFP-678-15P Campus Security Consultant (106.5 KiB)

Addendum 003 678-15P Campus Security Consultant - (83.6 KiB)

ERP Spring Valley 11.2015 (628.6 KiB)

Updated Short List Candidates

  • Atlas Group
  • Elert & Associates
  • Margolis Healy

Target Award Date: 02/19/16

Awarded: Elert & Associates


RFQ 677-15Q 15 Capacity Passenger Buses

Issue Date: 10/16/15 • Due Date: 10/21/15

Target Award date extended: 11/13/15

RFQ-677-15Q 15 Capacity Passenger Buses (125.8 KiB)

Awarded: Creative Bus Sales


RFQ 676-15Q Cisco LAN Wireless Controllers & Switches

Issue Date: 09/30/15 • Due Date: 10/05/15

676-15Q Bid Sheet1 (16.0 KiB)

RFQ-676-15 Cisco LAN Controllers & Switches (119.6 KiB)

Awarded: Flair Data Systems


RFQ 675-15 Boiler Replacement Carbondale Campus

Issue Date: 09/18/15 • Due Date: 10/12/15

675-15P Addendum 001 (90.1 KiB)

RFP-675-15P Boiler Replacement Carbondale Campus (148.6 KiB)

SignInSheetRFP-675-15P (248.0 KiB)

Awarded: American Mechanical Services


RFQ 674-15 Laboratory Supplies

Issue Date: 09/02/15 • Due Date: 09/09/15

RFQ-674-15Q Laboratory Supplies (118.7 KiB)

RFQ-674-15Q Laboratory Supplies Bid Sheet (13.2 KiB)

Awarded: Johnson Scientific & VWR


RFQ 673-15 New Media Equipment

Location Kits, FilmMakers Kit, Sola Location Lighting, Wireless Microphone Kit, Camera,
Paralinx Triton Kit, Location Diffusion Kit, Video Monitoring Kit

Issue Date: 09/01/15 • Due Date: 09/08/15

RFQ-673-15Q New Media (118.7 KiB)

RFQ-673-15Q New Media Bid Sheet 1 (15.4 KiB)

Awarded: B&H Foto & Electronics Corp.


RFP 672-15 CEPA Texts

Issue Date: 08/28/15 • Due Date: 09/03/15

672-15Q CEPA Texts (120.5 KiB)

Awarded: Follett and Townsend


RFP 671-15 Textbook Provider

Issue Date: 08/28/15 • Due Date: 09/25/15

671-15P Addendum Timeline Extended (33.9 KiB)

671-15P Textbook Provider (669.1 KiB)

671-15P Textbook Provider Addendum 001- Questions Answered (140.9 KiB)

671-15P Textbook Provider Revised Schedule 9-25-15 (65.1 KiB)

Short List Candidates:

  • Akademos
  • eCampus
  • MBS Direct
  • Rafter

Target Award Date: 02/15/16

Awarded:


RFP 670-15 Campus Security Services

Issue Date: 08/21/15 • Due Date: 10/02/15

670-15P Campus Security Services (194.1 KiB)

670-15P Security Bidsheet (21.4 KiB)

670-15P Short List Vendors Listed (58.5 KiB)

Addendum 001 RFP-670-15P Campus Security (90.5 KiB)

RFP 670-15 List Of Facilities Managers For Campus Tours 1 (9.9 KiB)

Awarded: Not Awarded


RFQ 669-15 Scientific Equipment/Supplies

Issue Date: 08/20/15 • Due Date: 08/27/15

RFQ-669-15Q Bid Sheet 1 (12.9 KiB)

RFQ-669-15Q Scientific Equipment-Supplies (38.9 KiB)

Awarded: Products Unlimited


RFQ 668-15 Laerdal SimMan/Accessories/Warranty/Training

Issue Date: 08/18/15 • Due Date: 08/25/15

RFQ-668-15Q Laerdal (119.9 KiB)

RFQ-668-15Q Laerdal Bid Sheet (13.8 KiB)

Awarded: Laerdal


RFP 667-15 Spring Valley Veterinary Technology Building Reroof

Issue Date: 08/14/15 • Due Date: 09/09/15

1507F-08-07-15 VR1 (1) (1.6 MiB)

1507F-08-07-15 VR2 (1) (1.5 MiB)

Addendum- Vet Tech 1 (21.8 KiB)

RFP-667-15 Walkthrough (476.8 KiB)

RFP-667-15P Vet Tech Building Reroof (145.3 KiB)

Vet Tech Specifications (856.8 KiB)

No Candidate Interviews will be scheduled.

Awarded: Mullenax Construction & Roofing


RFP 666-15 Dillon Campus Reroof

Issue Date: 08/10/15 • Due Date: 09/01/15

1506C-07-31-15 DR1 (1) (1.7 MiB)

1506C-07-31-15 DR2 (1) (805.3 KiB)

Dillon Reroof Specifications (1.8 MiB)

Dillon Walthrough Sign In Sheet (367.0 KiB)

DillonRoofPlan (262.0 KiB)

RFP 666-15-Addendum 1 (963.0 KiB)

RFP-666-15P (144.9 KiB)

VE Option 1 & Option 2 (49.1 KiB)

Target Award Date changed to 09/25/15

Awarded: B&M


RFP 665-15 Campus Security Services

Issue Date: 08/14/15 • Due Date: TBD

Awarded: Not awarded.  Replaced by RFP 670-15


RFI 664-15 Natural Gas Transport

Issue Date: 07-30-15 • Due Date: 08-13-15

664-15I Gas Transport (94.5 KiB)

Awarded: No award


RFQ 663-15 LED Parking Lot Fixtures

Issue Date: 07-30-15 • Due Date: 08-11-15

Addendum 001 RFQ-663-15Q (78.8 KiB)

RFQ-663-15Q Bid Sheet 2 (14.0 KiB)

RFQ-663-15Q LED Parking Lot Fixtures 1 (119.6 KiB)

Awarded: All-Phase Electric


RFP 662-15 Asphalt

Issue Date: 07-24-15 • Due Date: 08-20-15

Annex Arial ViewONLY (102.5 KiB)

Dillon Walkthrough (247.8 KiB)

Leadville Walkthrough (129.2 KiB)

Map Alpine Parking-Pedestrian Access (48.6 KiB)

RFP-662-15 Steamboat Walkthrough List (122.0 KiB)

RFP-662-15P Asphalt 1 (148.2 KiB)

Awarded: Connell Resources, Inc.


RFQ 661-15 Cisco Access Points

Issue Date: 07-02-15 • Due Date: 07-15-15

Cisco Access Point Specifications (242.3 KiB)

RFQ-661-15 Cisco Access Points (119.5 KiB)

Awarded: Flair Data Systems


RFP 660-15 Cisco SMARTnet renewal

Issue Date: 06-22-15 • Due Date: 06-26-15

RFP-660-15 Cisco SMARTnet Renewal Yearly (181.8 KiB)

SMARTnet Renewal Details (68.0 KiB)

Awarded: Flair Data Systems


RFP 659-15 Energy Management & Environmental Impact Plan

Issue Date: 06-12-15 • Due Date: 07-06-15 07-09-15

659-15P Bid Sheet (14.7 KiB)

659-15P Energy Management & Environmental Impact Study (162.3 KiB)

Addendum 001 - Timeline Dates Changed (73.8 KiB)

Addendum 002 - Questions Answered (122.0 KiB)

Addendum 003 - Amended Dates (64.7 KiB)

ClimateActionPlan CMC 2012 (566.2 KiB)

CMC TEA Report (3.6 MiB)

CombinedAttachments (11.0 MiB)

Earth Day Poster2015 FINAL-NoBleed (1.3 MiB)

Energy Mgmt Project Tracking (126.4 KiB)

Facilities Energy Conservation Policy (33.2 KiB)

Physical Plant Attributes for Addendum 002 (21.0 KiB)

http://garfield.buildingenergynavigator.com/

Awarded: Natural Capitalism


RFQ 658-15 • Deduplicated Disk Backup

Issue Date: 06-04-15 • Due Date: 06-26-15, 2pm

Please note the revised Award Date  09/25/15; 10/30/15

658-15Q Data Deduplication (126.8 KiB)

Addendum 001 RFP-658-15 Answered (112.4 KiB)

Primary WAN Layout (641.3 KiB)

Site Data Inventory (103.0 KiB)

Awarded: Venture Technologies


RFI 657-15 • Energy & Environmental Impact Consultant

Issue Date: 05-29-15 • Due Date: 06-02-15

657-15I Energy And Environmental Impact Consultant (168.6 KiB)

Awarded: No Award


RFP 656-15 • Split AC Systems Bristol Hall

Issue Date: 06-02-15 • Due Date: 06-25-15   07/02/15

RFP-656-15P Split AC Systems Bristol Hall (171.2 KiB)

Sign In Sheet 656-15 (75.4 KiB)

Target Award Date: 07/08/15

Awarded: No Awarded


RFP 655-15 • Emergency Secondary Access Road

Issue Date: 05-18-15 • Due Date: 06-09-15

Addendum 001 RFP-655-15P (3.0 MiB)

RFP-655-15 Walk Through (915.7 KiB)

RFP-655-15P Emergency Secondary Rd (174.6 KiB)

SECONDARY ROAD BID SCHEDULE 2015-05-07 (72.0 KiB)

SECONDARY ROAD FINAL BID DWGS 2015-05-07 (2.8 MiB)

Awarded: Habitat Construction


RFQ 654-15 • Cisco 10G Aggregation Switches

Issue Date: 05-13-15 • Due Date: 06-03-15

RFQ-654-15Q Cisco 10G Aggregation Switches Bid Sheet (13.4 KiB)

RFQ-654-15Q Cisco 10G Aggregation Switches (155.7 KiB)

Awarded: Flair Data Systems, Inc.


RFI 653-15 • LED Replacement Heads for Parking Lot Light Poles

Issue Date: 05-04-15 • Due Date: 05-21-15

Addendum 001 RFQ-653-15 Replacement Heads (76.0 KiB)

Cost Sheet RFQ-653-15 (19.4 KiB)

Parking Lot Light (1.2 MiB)

RFQ-653-15Q (120.4 KiB)

Awarded: Conserve-A-Watt Lighting, Inc.


RFI 652-15 • Housing Feasibility Study

Issue Date: 04-30-15 • Due Date: 05-26-15

652-15P Housing Feasibility Study (206.4 KiB)

No Addendum was issued.

Short List Candidates:

  • RRC Associates
  • Scion
  • MGT of America

Awarded: Scion


RFI 651-15 • Media Monitoring Service

Issue Date: 04-23-15 • Due Date: 05-05-15

651-15I Media Monitoring Service (83.1 KiB)

Addendum 001 RFI-651-15 (66.2 KiB)

Awarded: Meltwater


RFP 650-15 • Concrete Resurfacing at Bristol Hall

Issue Date: 04-24-15 • Due Date: 05-20-15

Addendum 001 RFP-650-15P Concrete Resurfacing (68.3 KiB)

RFP-650-15P Concrete Resurfacing Bristol Hall (183.0 KiB)

Awarded: Surface Decor Systems, LLC.


RFQ 649-15 • Digital Cinema Camera & Accessories

Issue Date: 04-20-15 • Due Date: 04-27-15

RFQ-649-15Q Digital Cinema Camera Bid Summary Sheet (12.9 KiB)

RFQ-649-15Q Digital Cinema Camera (119.6 KiB)

Awarded: B&H Photo


RFQ 648-15 • Canon Projector with Lens Kit & Accessories

Issue Date: 04-20-15 • Due Date: 04-27-15

RFQ-648-15Q Canon Projector With Lens Kit (119.6 KiB)

RFQ-648-Q Canon Projector With Lens Kit Bid Summary Sheet (12.8 KiB)

Awarded: B&H Photo


RFQ 647-15 • Nikon Filmmaker’s Kit & Accessories

Issue Date: 04-20-15 • Due Date: 04-27-15

RFQ-647-15Q Nikon Filmmaker's Kit (119.6 KiB)

RFQ-647-Q Nikon Filmmaker's Kit Bid Summary Sheet (13.7 KiB)

Awarded: B&H Photo


RFQ 646-15 • Canon Camera Video Production Kit & Accessories

Issue Date: 04-20-15 • Due Date: 04-27-15

RFQ-646-15Q Canon Camera Video Production Kit (119.2 KiB)

RFQ-646-Q Bid Summary Sheet (13.8 KiB)

Awarded: B&H Photo


RFQ 645-15 • Water Softener Residence Hall SVC

Issue Date: 03-24-15 • Due Date: 04-13-15

645-15Q Water Softener & Install (120.6 KiB)

Addendum 001 RFP-645-15Q (68.3 KiB)

Sign In Sheet Water Softener RFQ-645-15 (398.9 KiB)

Awarded: Culligan


RFP 644-15 • Painting Exterior Bristol Hall/Interior Hill Hall

Issue Date: 03-24-15 • Due Date: 04-13-15

RFP-644-15P- Painting Exterior Bristol Hall/Interior Hill Hall (178.2 KiB)

Room Drawing (356.0 KiB)

Awarded: Southwestern Painting


RFP 643-15 • Deep Clean Hill Hall/Dining Hall

Issue Date: 03-24-15 • Due Date: 04-17-15

RFP-643-15P Deep Clean Hill Hall and Dining Hall (170.9 KiB)

Awarded: Service Master- Dining Hall; The Key People- Hill Hall Dorms


RFP 642-15 • Carpet and VCT

Issue Date: 03-23-15 • Due Date: 04-14-15

642-15 Carpet & VCT (170.8 KiB)

Awarded: No Bids Received (went out for quotes =Carpet One)


RFQ 641-15 • 24′ Ceiling Fan

Issue Date: 03-19-15 • Due Date: 03-30-15

641-15Q 24' Ceiling Fan (116.4 KiB)

Addendum 001 (71.6 KiB)

Addendum 002 With Drawings (1.3 MiB)

Awarded: Big A** Solutions


RFP 640-15 • Training for Microsoft System Center Configuration Manager 2012

Issue Date: 03-19-15 • Due Date: 04-03-15

640-15P Training Microsoft (180.0 KiB)

Addendum 001 (74.4 KiB)

Addendum 002 RFP-640-15 (65.4 KiB)

Awarded: Tech Sherpas


RFP 639-15 • Boiler Cleaning and Maintenance

Issue Date: 03-16-15 • Due Date: 04-06-15

639-15P Boiler Cleaning And Maintenance (173.1 KiB)

Awarded: Iron Horse Water


RFP 638-15 • Spring Valley Storage Shed

Please note: The purchasing department is working with the Spring Valley Campus to determine a best course of action as all proposals came in over budget. This will delay the process for 2-4 weeks. We appreciate your patience.

Issue Date: 02-25-15 • Due Date: 04-13-15

Updated RFP Time Frame: DATE TIME
issue date 02/25/15 4:00 PM
Mandatory Pre- Proposal Walkthrough 03/23/15 2:00 PM
Questions and Clarifications Due 03/27/15 2:00 PM
Questions Answered 04/02/15 4:00 PM
Request for Proposals (RFP) Due 04/13/15 2:00 PM
Short List of Vendors Announced 04/15/15 4:00 PM
Candidate Interview (if necessary – save the date) 04/20/15 TBD
Target Award Date (Subject to Change) Until Further Notice

 

638-15 Sign In Sheet (226.3 KiB)

638-15 Storage Shed (4.4 MiB)

Addendum 001 638-15P Storage Shed - Spring Valley Campus (103.9 KiB)

Addendum 002 SVC Storage Shed (64.2 KiB)

Bid Sheet SV Storage Shed 638-15P (776.7 KiB)

RFP-638-15 Subsoil Study Signed (819.5 KiB)

Awarded: No award


RFQ 637-15 • Aspen Exterior Painting

Issue Date: 02-04-15 • Due Date: 04-8-15

637-15Q Aspen Painting (450.9 KiB)

RFP 637-15Q Sign In Sheet Aspen Campus (35.6 KiB)

Awarded: Randy Ball Painting


RFQ 636-15 • Rifle Parking Pad

Issue Date: 01-23-15 • Due Date: 02-18-15

636-15 Addendum 001 (207.2 KiB)

636-15Q Rifle Parking Pad (142.7 KiB)

636-15Q Sign In Sheet (67.4 KiB)

Photo 1 (226.5 KiB)

Photo 2 (240.1 KiB)

Photo 3 (87.0 KiB)

Photo 4 (86.3 KiB)

Awarded: Phoenix Industries


RFP 635-14 • Cisco ISR and ASR Router Upgrade

Issue Date: 12-11-14 • Due Date: 01-05-15

635-14 Cisco Router Upgrade (494.0 KiB)

635-14 Exhibit A (38.8 KiB)

Awarded: Flair Data Systems


RFP 634-14 • Colleague Consultant

Issue Date: 12-11-14 • Due Date: 01-09-15

634-14 Colleague Consultant (510.6 KiB)

Awarded: Ferrelli


RFP 633-14 • Trash and Recycle Service

Issue Date: 12-05-14 • Due Date: 01-15-15

Shortlist Finalists

InterMountain Environmental Services
Mountain Roll-Offs Inc
Waste Management of Colorado Inc

633-14 Addendum 001 (90.7 KiB)

633-14P Trash and Recycle Service (671.1 KiB)

Awarded: MRI and Waste Management


RFP 632-14 • College-wide HVAC Maintenance and Service

Issue Date: 11-21-14 • Due Date: 01-16-15

Questions will be answered by 4:00 PM on January 9.

Submission deadline has been moved to 2:00 PM, January 16.

632-14 Attachment A (128.1 KiB)

632-14 Attachment B (17.9 KiB)

632-14 Collegewide HVAC (197.4 KiB)

632-14P HVAC Addendum 001 (105.4 KiB)

632-14P HVAC Addendum 002 (106.9 KiB)

632-14P HVAC Addendum A Equipment Schedule (259.2 KiB)

Awarded: Tolin Mechanical


RFI 631-14 • National Promotion for Isaacson’s School of New Media

Issue Date: 11-13-14 • Due Date: 11-21-14

631-14 National Promotion of New Media Program (510.0 KiB)

Awarded: Rally Cap Consulting


RFP 630-14 • Quigley Library Carpet and Tile Replacement

Issue Date: 11-05-14 • Due Date: 11-19-14

630-14 Quigley Carpet and Tile Replacement (172.8 KiB)

Awarded: Carpet One


RFQ 629-14 • Buena Vista Campus Interior Paint

Issue Date: 10-29-14 • Due Date: 11-11-14

629-14 Buena Vista Campus Interior Paint (456.8 KiB)

Awarded: Southwestern Painting


RFP 628-14 • Trimble R10 GNSS

Issue Date: 10-24-14 • Due Date: 11-11-14

628-14 Trimble R10 GNSS (508.6 KiB)

Awarded: Frontier Precision


RFP 627-14 • TRDI RiverPro ADCP

Issue Date: 10-24-14 • Due Date: 11-11-14

627-14 TRDI RiverPro1200 ADCP (134.5 KiB)

Awarded: Electronic Data Solutions


RFI 626-14 Microsoft Forefront Identity Consultant

Issue Date: 10-14-14 • Due Date: 10-17-14

RFI 626-14 Microsoft Forefront Identity Consultant (143.6 KiB)

Awarded: Not Awarded


RFP 625-14 Cisco Network Switching Upgrade

Issue Date: 09-18-14 • Due Date: 10-17-14

625-14 Addendum 001 (74.7 KiB)

625-14 Bid Comparison (50.9 KiB)

625-14 Bid Schedule (31.3 KiB)

625-14 Cisco Network Switching Upgrade (127.3 KiB)

Awarded: Flair Data Systems


RFP 624-14 Leadville Sidewalk

Issue Date: 08-21-14 • Due Date: 09-16-14

624-14 Bid Schedule (36.0 KiB)

624-14 Drawings (13.1 MiB)

624-14 Leadville Sidewalk (174.5 KiB)

624-14 Leadville Sidewalk Sign In Sheet (58.8 KiB)

Awarded: ACA Products, Inc.


RFQ 623-14 Email Protection Service

Issue Date: 08-21-14 • Due Date: 09-04-14

Award date has been extended to 09-15-14

623-14 Addendum 001 (76.5 KiB)

623-14 Bid Tabulation (89.4 KiB)

623-14 Email Protection Service (139.3 KiB)

Awarded: Accuvant Inc.


RFQ 622-14 Walk-in Freezer, Walk-in Refrigerator

Issue Date: 08-14-14 • Due Date: 09-02-14

622-14 Walkin Freezer and Refrigerator (141.6 KiB)

Awarded: Kd Supply, LLC.


RFI 621-14 Employee Performance Evaluation System

Issue Date: 08-08-14 • Due Date: 08-15-14

621-14 Employee Performance Evaluation System (96.3 KiB)

No award


RFQ 620-14 Smart Classroom

Issue Date: 08-07-14 • Due Date: 08-19-14

620-14 Addendum 001 (31.0 KiB)

620-14 Smart Classroom (146.3 KiB)

Awarded: CCS Presentation Systems


RFQ 619-14 Dillon Parking Lot Lighting

Issue Date: 08-07-14 • Due Date: 09-02-14

619-14 Addendum 001 (78.2 KiB)

619-14 Antique Street Lamps (1.0 MiB)

619-14 Dillon Exterior Lighting Specs (72.0 KiB)

619-14 Dillon Parking Lot Lighting (174.2 KiB)

619-14 Sign In Sheet (64.7 KiB)

619-14 Site Map (169.2 KiB)

Awarded: Triangle Electric, Inc.


RFQ 618-14 Ford F250 Work Truck

Issue Date: 07-29-14 • Due Date: 08-06-14

618-14 Addendum 001 (66.7 KiB)

618-14 Bid Tabulation (30.9 KiB)

618-14 Ford Truck (110.7 KiB)

Awarded: Glenwood Springs Ford


RFQ 617-14 • Hay Delivery

Issue Date: 07-25-14 • Due Date: 08-1-14

RFQ 617-14 Hay Delivery

Awarded: Kevin Roberts


RFP 616-14 Rebranding Initiative

Issue Date: 08-01-14 • Due Date: 08-22-14

Award date has been extended to 10-01-14

616-14 Addendum 001 (114.3 KiB)

616-14 Branding Results (2.1 MiB)

616-14 Rebranding Initiative (150.0 KiB)

CMC Strategic Plan (12.8 MiB)

Awarded: K&H, LLC


RFP 615-14 Tablet Computers for Student Use

Issue Date: 07-25-14 • Due Date: 08-15-14

615-14 Bid Tabulation (33.5 KiB)

615-14 Tablet Computers For Student Use (41.1 KiB)

Awarded: DakTech Computers


RFP 614-14 • Strategic Planning Process Facilitator

Issue Date: 07-15-14 • Due Date: 07-25-14

614-14 Strategic Planning Process Facilitator (177.5 KiB)

RFP 614-14 Addendum (102.5 KiB)

Strategic Plan (12.8 MiB)

Awarded: The Keystone Center


RFP 613-14 • Parking Lot Maintenance

Issue Date: 07-09-14 • Due Date: 07-29-14

613-14 Parking Lot Maintenance (180.5 KiB)

613-14 Parking Lot Maintenance Bid Sheet (15.3 KiB)

Awarded: Columbine Hills Concrete, Connell Resources, Kauffman Seal Coating, Summit Sweeping and Asphalt Maintenance


RFI 612-14 • Rural Cell Service

Issue Date: 07-25-14 • Due Date: 08-26-14

Addendum 001 will be issued by 4:00 PM on August 15

Please note the new due date

Not Awarded

612-14 Addendum 001 (78.0 KiB)

612-14 Rural Cell Service (33.2 KiB)


RFQ 611-14 • Dodge/Chevrolet SUV

Issue Date: 06-27-14 • Due Date: 07-11-14

611-14 Addendum 001 (69.3 KiB)

611-14 Dodge/Chevrolet SUV (111.6 KiB)

Awarded: Johnson Auto Plaza


RFQ 610-14 • Passenger Van

Issue Date: 06-27-14 • Due Date: 07-11-14

610-14 Addendum 001 (67.6 KiB)

610-14 Passenger Van (445.7 KiB)

Awarded: Not Awarded


RFQ 609-14 • Diplomas

Issue Date: 06-25-14 • Due Date: 07-15-14

609-14 Addendum 001 (69.4 KiB)

609-14 Diplomas (447.2 KiB)

Awarded: Scrip-Safe


RFQ 608-14 • Media Room Furniture

Issue Date: 06-13-14 • Due Date: 06-20-14

608-14 Addendum 001 (196.8 KiB)

608-14 Media Furniture (446.5 KiB)

608-14 Room Layout (737.7 KiB)

Bid Tab (17.2 KiB)

Awarded: Prospace Interiors


RFP 607-14 • Bristol Water Line

Issue Date: 06-12-14 • Due Date: 07-01-14

607-14 Addendum 002 (3.3 MiB)

607-14 Bid Plans (2.6 MiB)

607-14 Bid Schedule (32.1 KiB)

607-14 Bristol Water Line (172.0 KiB)

607-14 Retaining Wall Plans (400.6 KiB)

Awarded: Native Excavating


RFP 606-14 • Septic Tank Replacement

Issue Date: 06-04-14 • Due Date: 06-27-14

606-14 Addendum 001 (193.8 KiB)

606-14 Bid Tab (17.5 KiB)

606-14 Septic Tank Replacement (684.9 KiB)

Exhibit A (1.1 MiB)

Exhibit B (122.5 KiB)

Awarded: Phoenix Industries LLC


RFQ 605-14 • Computer Tables

Issue Date: 05-28-14 • Due Date: 06-03-14

605-14 Addendum 001 (199.7 KiB)

605-14 Computer Tables (445.3 KiB)

Awarded: Not Awarded


RFQ 604-14 • Custom Padding for Bouldering Wall

Issue Date: 05-28-14 • Due Date: 06-06-14

604-14 Addendum 001 (239.8 KiB)

604-14 Custom Padding For Bouldering Wall (449.9 KiB)

Awarded: Asana Climbing


RFP 603-14 • Residence Hall Satellite Television

Issue Date: 05-22-14 • Due Date: 06-20-14

Award date has been delayed. Please check back after July 8.

603-14 Addendum 001 (73.9 KiB)

603-14 Residence Hall TV (518.7 KiB)

Awarded: C3, Inc.


RFQ 602-14 • Database Records Scrub

Issue Date: 05-15-14 • Due Date: 05-22-14

602-14 Addendum 001 (318.7 KiB)

602-14 Addendum 002 (198.7 KiB)

602-14 Database Records Scrub (445.6 KiB)

Awarded: LexisNexis


RFQ 600-14 • Rifle Sustainable Landscape

Issue Date: 04-25-14 • Due Date: 05-23-14

600-14 Attachment A (172.7 KiB)

600-14 Rifle Landscape (448.0 KiB)

Awarded: ColorScape of Colorado


RFQ 599-14 • Resusci Anne Simulator with SimPad

Issue Date: 04-21-14 • Due Date: 05-01-14

599-14 Resusci Anne Simulator (446.5 KiB)

Awarded: Laerdal Medical Corporation


RFQ 598-14 • Printer Maintenance and Repair

Issue Date: 04-15-14 • Due Date: 04-25-14

598-14 Addendum 001 (199.1 KiB)

598-14 Printer Repair (445.4 KiB)

598-14 Printer Service Contract Addendum 001 (627.5 KiB)

Awarded: Print Man Express, Inc.


RFQ 597-14 • Cisco Wireless LAN Controllers

Issue Date: 04-08-14 • Due Date: 04-17-14

597-14 Addendum 001 (196.9 KiB)

597-14 Cisco Wireless LAN Controllers (483.9 KiB)

Bid Tabulation (33.3 KiB)

Awarded: Flair Data Systems, Inc.


RFQ 596-14 • Megacode Kelly Advanced

Issue Date: 04-04-14 • Due Date: 04-10-14

596-14 Megacode Kelly Advanced (148.6 KiB)

Awarded: Laerdal Medical Equipment


RFQ 595-14 • Thermo Electron Instructional Equipment

Issue Date: 03-28-14 • Due Date: 04-04-14

RFQ 595-14 Thermo Electron Instructional Equipment (446.2 KiB)

Awarded: Thermo Electron North America, LLC


RFQ 594-14 • UPC Networking Hardware

Issue Date: 03-28-14 • Due Date: 04-03-14

594-14 Bid Tabulation (33.3 KiB)

594-14 UPC Networking Hardware (459.4 KiB)

Awarded: IT Outlet


RFP 593-14 • Personal Computers

Issue Date: 03-28-14 • Due Date: 05-01-14

The award date has been extended to June 9, 2014.

593-14 Addendum 001 (198.2 KiB)

593-14 Bid Tabulation (32.6 KiB)

RFP 593-14 Personal Computers (384.6 KiB)

Awarded: Milestone Computer Technology Inc.


RFQ 592-14 • Fitness Equipment

Issue Date: 03-25-14 • Due Date: 04-04-14

592-14 Fitness Equipment (453.0 KiB)

Awarded: HealthStyles Exercise Equipment


RFQ 591-14 • ID Card Printers

Issue Date: 03-25-14 • Due Date: 04-04-14

591-14 Addendum 001 (201.1 KiB)

591-14 ID Printers (466.6 KiB)

Awarded: ID Edge


RFQ 590-14 • Library Lounge and Cafe Furniture

Issue Date: 03-13-14 • Due Date: 03-26-14

590-14 Addendum001 (188.2 KiB)

590-14 Bid Sheet (14.8 KiB)

590-14 Lounge & Cafe Furniture (147.3 KiB)

Awarded: Canter & Associates


RFQ 589-14 • Auditorium Floor

Issue Date: 03-13-14 • Due Date: 04-08-14

589-14 Auditorium Floor (162.4 KiB)

Awarded: Not Awarded


RFQ 588-14 • Fitness Equipment

Issue Date: 03-13-14 • Due Date: 03-21-14

588-14 Fitness Equipment (456.2 KiB)

Awarded: Push Pedal Pull, Inc


RFQ 587-14 • Hill Hall Painting

Issue Date: 03-13-14 • Due Date: 04-02-14

587-14 Addendum 001 (197.7 KiB)

587-14 Hill Hall Painting (638.5 KiB)

587-14 Hill Hall Sign In Sheet (53.8 KiB)

Bid Tabulation (88.3 KiB)

Awarded: Southwestern Painting


RFQ 586-14 • Hill Hall Deep Clean

Issue Date: 03-13-14 • Due Date: 04-02-14

586-14 Bid Tabulation (87.2 KiB)

586-14 HH Deep Clean (630.0 KiB)

Awarded: The Key People


RFQ 585-14 • Calaway Remodel

Issue Date: 03-13-14 • Due Date: 04-08-14

585-14 Calaway Remodel RFP Document (629.4 KiB)

585-14 Sign In Sheet (138.6 KiB)

A21 Project 1 (504.1 KiB)

A21 Project 2 (1.0 MiB)

A21 Project 3 (1.5 MiB)

A22 Project 1 (521.7 KiB)

A22 Project 2 (462.8 KiB)

A22 Project 3 (2.0 MiB)

A23 Project 1 (777.3 KiB)

A24 Project 1 (1.5 MiB)

A25 Project 1 (377.0 KiB)

PHASE ONE M & E DWGS (2.9 MiB)

PHASE THREE M & E (1.0 MiB)

PHASE TWO M & E (416.1 KiB)

Awarded: Rescom Construction LLC, R&R Construction, Crawford Brothers Enterprises, Four Wynns Mechanical


RFQ 583-14 • Greenhouse Design

Issue Date: 03-07-14 • Due Date: 03-28-14

583-14 Addendum 001 (209.8 KiB)

583-14 Addendum 002 (207.7 KiB)

583-14 Exhibit A (1.1 MiB)

583-14 Greenhouse Design (448.9 KiB)

583-14 RFQ Bid Sheet (13.5 KiB)

583-14 Walk Through Sign In Sheet (66.3 KiB)

Exhibit B (85.7 KiB)

Awarded: H+L Architecture


RFP 581-14 • Residence Hall Beds

Issue Date: 02-28-14 • Due Date: 03-21-14

581-14 Addendum 001 (203.0 KiB)

RFP 581-14 Residence Hall Beds (504.6 KiB)

Awarded: Southwest Contract


RFP 580-14 • Snow Making Fan Gun

Issue Date: 02-06-14 • Due Date: 02-25-14

580-14 Snow Making Fan Gun (560.3 KiB)

Awarded: Snow Machines Incorporated


RFQ 579-13 • Residence Hall Software

Issue Date: 12-20-13 • Due Date: 01-10-14

579-13 Addendum 001 (198.6 KiB)

579-13 Residence Hall Software (482.9 KiB)

Awarded: Not Awarded


RFQ 578-13 • Search Engine Optimization

Issue Date: 12-20-13 • Due Date: 01-10-14 • New Award Date 01-27-14

578-13 Addendum 001 (246.2 KiB)

578-13 Search Engine Optimization (164.8 KiB)

Academic Programs - Colorado Mountain College (227.3 KiB)

Awarded: NewCity


RFP 577-13 • Human Resources Consultant

Issue Date: 12-18-13 • Due Date: 01-17-14

577-13 Addendum 001 (336.0 KiB)

577-13 Addendum 002 (184.4 KiB)

577-13 HR Consultant (273.5 KiB)

Awarded: Stevens Strategy


RFQ 576-13 • PCA Pump 3 Infusion System

Issue Date: 12-06-13 • Due Date: 12-13-13

576-13 PCA Pump Infusion System (167.4 KiB)

Awarded: Not Awarded


RFQ 575-13 • Cisco Wireless Access Point

Issue Date: 11-22-13 • Due Date: 12-04-13

575-13 Addendum 001 (203.9 KiB)

575-13 Cisco Wireless Access Point (545.9 KiB)

Bid Tabulation (89.8 KiB)

Awarded: Zones, Inc


RFQ 574-13 • SharePoint Consultant

Issue Date: 11-13-13 • Due Date: 12-02-13

574-13 Addendum 001 (230.2 KiB)

574-13 SharePoint Consultant (561.9 KiB)

Bid Tabulation (87.2 KiB)

Awarded: IMC, Inc.


RFQ 573-13 • Rifle Carpet

Issue Date: 11-13-13 • Due Date: 11-27-13

573-13 Rifle Carpet (551.7 KiB)

Rifle Carpet Map RFQ (436.8 KiB)

Awarded: Carpet One


RFP 572-13 • Isaacson School for New Media Microsite
Issue Date: 10-29-13 • Due Date: 11-19-13

Please note new due date of November 19, 2013

Finalist Interviews will be held the first week of December

572-13 Addendum 002 (260.7 KiB)

572-13 Isaacson Microsite-DS1 (515.2 KiB)

572-13Addendum 001 (188.9 KiB)

Bid Tabulation (33.9 KiB)

Awarded: Black Dog Digital, LLC


RFQ 571-13 • Veterinary Digital Radiography System

Issue Date: 10-10-13 • Due Date: 10-17-13

571-13 Bid Tabulation (32.6 KiB)

571-13Q Veterinary Digital Radiography System (40.9 KiB)

Awarded: Medical Imaging Technologies


RFP 569-13 • Leadville Science Room
Issue Date: 09-18-13 • Due Date: 10-09-13

569-13 Science Room (708.5 KiB)

Attachment A Permit (1.5 MiB)

Attachment B Electrical Permit (2.0 MiB)

Attachment C PCD Engineers Sheet (109.1 KiB)

Bid Tabulation (87.7 KiB)

Science Room Sign In Sheet (720.9 KiB)

Awarded: R & H Mechanical, LLC


RFP 570-13 • Anderson Garage Loft
Issue Date: 09-13-13 • Due Date: 10-15-13

570-13 Anderson Garage Loft (747.0 KiB)

570-13 Anderson Garage Loft Addendum (564.1 KiB)

570-13 Sign In (276.6 KiB)

CMC Anderson Garage 090913 Permit (3.2 MiB)

Awarded: Great West Construction


RFQ 568-13 • Solo Water Craft
Issue Date: 09-04-13 • Due Date: 09-10-13

568-13Q Solo Water Craft (1.3 MiB)

Awarded: Not Awarded


RFP 567-13 • Brite Tanks
Issue Date: 08-20-13 • Due Date: 09-06-13

567-13 Addendum 001 (163.2 KiB)

567-13 Brite Tank (758.7 KiB)

Attachment A (245.5 KiB)

Awarded: Not Awarded


RFP 566-13 • Bristol Repipe
Issue Date: 08-15-13 • Due Date: 09-10-13

566-12 Addendum 001 (225.4 KiB)

566-13 Bristol Repipe (875.6 KiB)

Attachment A (550.9 KiB)

Attachment B (332.0 KiB)

Awarded: Not Awarded


RFQ 565-13 • Replacement Blinds Bristol Hall
Issue Date: 08-09-13 • Due Date: 09-03-13

565-13q-sb-blinds (1.6 MiB)

Awarded: Steamboat Shade & Shutter


RFQ 564-13 • Cobra Administrator
Issue Date: 08-01-13 • Due Date: 08-20-13

564-13Q Addendum 001 (190.6 KiB)

564-13Q COBRA Admin (1.3 MiB)

Awarded: Not Awarded


RFQ 563-13 • MP45 Health Science System
Issue Date: 07-24-13 • Due Date: 07-30-13

563-13Q BSL MP45 Health Science System (1.3 MiB)

Awarded: Not Awarded


RFQ562-13 • Kitchenware
Issue Date: 07-24-13 • Due Date: 07-30-13

562-13 SB Kitchenware (1.7 MiB)

SB Kitchen Supplies (147.6 KiB)

Awarded: Edward Don & Company


RFQ561-13 • 2013 Dodge Journey
Issue Date: 07-12-13 • Due Date: 07-17-13

561-13q-2013-dodge-journey (1.3 MiB)

Awarded: Johnson Auto Plaza


RFQ560-13 • Steamboat Window Cleaning
Issue Date: 07-03-13 • Due Date: 07-19-13

560-13q-sb-window-cleaning (1.4 MiB)

Awarded: JB’s Window Cleaning


RFQ559-13 • Trey Chair by Sauder
Issue Date: 07-02-13 • Due Date: 07-05-13

559-13q-trey-chair-by-sauder (147.5 KiB)

Awarded: Sauder Mfg.


RFP 558-13 • Entry Canopies
Issue Date: 06-14-13 • Due Date: 07-19-13

558-13 802 Entry Canopies (188.4 KiB)

558-13 802 Entry Canopies New Dates (132.3 KiB)

558-13 Addendum 001 (503.3 KiB)

558-13 Addendum 002 (857.9 KiB)

558-13 Exhibit A Drawings (5.1 MiB)

558-13 Exhibit B Specifications Posted Version (1.2 MiB)

BID FORM CANOPIES (113.6 KiB)

Sign In Sheet From Walkthrough June 25 2013 (175.2 KiB)

Awarded: Hess Contracting Inc


RFP 557-13 • Grand Avenue Signage
Issue Date: 06-03-13 • Due Date: 06-29-13

557-13 802 Grand Signage (189.3 KiB)

557-13 Addendum 001 (189.8 KiB)

557-13 Addendum 002 (916.7 KiB)

557-13 Addendum 003 (34.1 KiB)

557-13 Sign In Sheets (324.4 KiB)

Awarded: Signdealz


RFP 556-13 • Glenwood Chiller
Issue Date: 05-23-13 • Due Date: 06-18-13

556-13 GWC Chiller (52.8 KiB)

556-13 GWC Chiller Exhibit 1 (174.5 KiB)

Please note change to Exhibit 1
Nameplate Voltage should be 208-3-60 V-Ph-Hz

Awarded: Falcon Plumbing and Heating


RFP 555-13 • Fire Safety
Issue Date: 05-17-13 • Due Date: 06-27-13

555-13 Addendum 001 (179.4 KiB)

555-13FireSafety (365.6 KiB)

Awarded: Not Awarded


RFQ554-13 • Hill Hall Painting
Issue Date: 04-17-13 • Due Date: 04-30-13

554-13-addendum-001 (179.3 KiB)

554-13-hill-hall-painting (329.6 KiB)

Awarded: G&R Construction


RFQ553-13 Hill Hall Deep Cleaning
Issue Date: 04-17-13 • Due Date: 04-30-13

553-13-hh-deep-clean (320.2 KiB)

Awarded: Service Master


RFP 552-13 • Dillon Cleaning Contract
Issue Date: 03-21-13 • Due Date: 04-30-13

552-13-addendum-001 (248.2 KiB)

552-13-dillon-cleaning-walkthrough-sign-in-04-15-13 (165.0 KiB)

552-13dilloncleaning (187.9 KiB)

552-13exhibita (90.4 KiB)

Awarded: Rocky Top Cleaning


RFP 551-13 • Breckenridge Cleaning Contract
Issue Date: 03-21-13 • Due Date: 04-30-13

551-13-addendum-001 (251.0 KiB)

551-13-breckenridge-cleaning-contract-walkthrough-sign-in-04-15-13 (176.1 KiB)

551-13BreckenridgeCleaning (188.0 KiB)

551-13breckenridgecleaning (188.0 KiB)

551-13ExhibitAScope Of Work (92.7 KiB)

551-13exhibitascope-of-work (92.7 KiB)

Awarded: The Key People


RFP 550-13 • Breckenridge Landscape
Issue Date: 03-07-13 • Due Date: 04-02-13

550-13breckenridgelandscape (187.2 KiB)

550-13exhibita (64.6 KiB)

Landscaping Plan Revised 4 11 13 (338.4 KiB)

Awarded: Neils Lunceford, INC


RFP 547-13 • Steamboat Sidewalk
Issue Date: 03-10-13 • Due Date: 04-09-13

547-13addendum001 (55.1 KiB)

547-13addendum002 (165.9 KiB)

547-13bidschedule (22.8 KiB)

547-13exhibitb (598.1 KiB)

547-13exhibitcfinalplans (1.5 MiB)

547-13exhibitdfinalspecs (640.0 KiB)

547-13steamboatsidewalk (130.9 KiB)

547-13walkthroughsigninsheet (206.6 KiB)

Awarded: Native Excavating


RFP 549-13 • Edwards Lawncare
Issue Date: 03-08-13 • Due Date: 04-09-13

549-13-bid-tabulation (172.4 KiB)

549-13addendum001 (288.3 KiB)

549-13edwardslawncarev3 (188.4 KiB)

549-13siteplans (260.6 KiB)

Awarded: Gerber Tree and Lawn


RFP 548-13 • Quigley Remodel
Issue Date: 03-07-13 • Due Date: 04-02-13

547-13exhibita (1.6 MiB)

548-13-bid-tabulation (53.8 KiB)

548-13addendum001 (234.8 KiB)

548-13addendum002 (171.5 KiB)

548-13exhibita (2.3 MiB)

548-13quigleyremodelv2 (184.8 KiB)

548-13walkthroughsigninsheet (209.2 KiB)

Exhibitb (174.8 KiB)

Awarded: ResCom Construction LLC


RFP 546-13 • Executive Search Firm
Issue Date: 03-05-13 • Due Date: 04-12-13

546-13executivesearchfirmv2 (67.8 KiB)

Awarded:


RFP 545-13 • Floor Refinish
Issue Date: 02-28-13 • Due Date: 04-02-13

545-13soprishallfloorrefinishv2 (50.2 KiB)

Awarded: Project not awarded


RFP 544-13 • Rooftop Heating and Cooling
Issue Date: 02-28-13 • Due Date: 04-09-13

544-13-bid-tabulation (173.8 KiB)

544-13addendum-001 (188.6 KiB)

544-13rooftopv2 (49.2 KiB)

544-13walkthroughsigninsheet (258.0 KiB)

Awarded: Four Wynns Mechanical


RFP 543-13 • Class Schedule
Issue Date: 01-25-13 • Due Date: 02-13-13

543-13-class-schedules (117.3 KiB)

543-132addendum-001 (68.2 KiB)

Exhibit1 (213.6 KiB)

Slim Jim Booklets – Publication Printers
Tabloid Bulletin #1 – Publication Printers
Tabloid Bulletin #2 – Colorado Mountain News Media


RFQ542-12 • Residence Hall Mattresses
Issue Date: 12-20-12 • Due Date: 01-15-13

542-12addendum001 (58.4 KiB)

Rfq Mattress (57.2 KiB)

Awarded: August Mattress


RFQ541-12 • Weight Set
Issue Date: 12-20-12 • Due Date: 01-15-13

541-12 Weight Set (56.0 KiB)

541-12addendum001 (53.8 KiB)

Awarded: Advanced Exercise Equipment


RFQ538-12 • Strategic Planning Facilitator
Issue Date: 12-20-12 • Due Date: 01-17-13

538-12 Leadership Team Facilitator (85.2 KiB)

538-12 Strategic Planning Facilitator Bidsheet (27.6 KiB)

538-12addendum001v2 (91.9 KiB)

Awarded: MIG, Inc.


RFP 540-12 • IT Audit Firm
Issue Date: 12-13-12 • Due Date: 01-09-13

540-12 Addendum 001 (61.8 KiB)

540-12 It Audit Bidsheet (29.1 KiB)

540-12 It Audit V3 (66.3 KiB)

Awarded: BerryDunn


RFP 537-12 • Contract Attorney
Issue Date: 11-15-12 • Due Date: 11-29-12

537-12-contract-attorney-v2 (50.0 KiB)

Awarded: Whitsitt & Gross, P.C.


RFQ 539-12 • Mobile Classroom Trailer
Issue Date: 11-02-12 • Due Date: 12-10-12

539-12 Mobile Classroom Trailer (23.8 KiB)

539-12 Mobile Classroom Trailer Bid Sheet (25.1 KiB)

Awarded: Silverstone Industries


RFP 536-12 • Boiler Clean
Issue Date: 10-30-12 • Due Date: 12-04-12

536-12 Boiler Clean (46.8 KiB)

Deadline has been extended one week.
Questions are due 11/16/12
Questions will be answered 11/20/12
RFP Deadline is 2:00PM 12/4/12

Awarded: Project not awarded


RFQ535-12 • Fan Coil Clean
Issue Date: 10-25-12 • Due Date: 11-15-12

535-12Q Fan Coil Clean (140.4 KiB)

Awarded: Project not awarded


RFP 534-12 • Elevator
Issue Date: 10-23-12 • Due Date: 01-15-13

534-12 Addendum 001 (51.5 KiB)

534-12 Elevator (48.4 KiB)

534-12 Exhibit 1 Site Locations (95.2 KiB)

534-12-addendum-001 (51.5 KiB)

Exhibit1 (213.6 KiB)

Awarded: Schindler Elevator Corporation


RFP 533-12 • Advertising Agency
Issue Date: 10-10-12 • Due Date: 11-07-12

533-12 Advertising Agency - Final (73.3 KiB)

533-12 Advertising Agency Addendum 001 V2 (70.9 KiB)

Awarded: Not Awarded


RFP 532-12 • Commercial Realtor
Issue Date: 09-24-12 • Due Date: 10-10-12

532-12 Commercial Realtor (47.6 KiB)

Awarded: Vicki Lee Green Realtors


RFP 531-12 • Dillon Roof
Issue Date: 07-31-12 • Due Date: 08-22-12

531-12 Bid Tabulation (53.5 KiB)

531-12 Dillon Annex Roof (128.8 KiB)

531-12 Dillon Roof Sign In (770.6 KiB)

Awarded: B & M Roofing of Colorado


RFP 530-12 • New Discovery Floor
Issue Date: 07-27-12 • Due Date: 08-07-12

530-12 Addendum 001 (163.9 KiB)

530-12 New Discovery Floor (410.9 KiB)

Awarded: Maverick Flooring


RFP 527-12 • Willett Parking Lot
Issue Date: 07-10-12 • Due Date: 08-09-12

11-2005 W-01 BDW 120713 FULL SIZE FINAL 071312 (270.0 KiB)

11-2005 W-01 BDW 120713 HALF SIZE FINAL 071312 (151.5 KiB)

11X17 C-000 COVER FINAL 071312 (147.4 KiB)

11X17 C-001 GEN NOTES FINAL 071312 (227.1 KiB)

11x17 C-501 DETAILS FINAL 071312 (239.8 KiB)

11X17 C-502 DETAILS FINAL 071312 (119.7 KiB)

11X17 C101 GRAD & DRAIN PLAN FINAL 071312 (208.0 KiB)

527 -12 Willett Parking Lot V2 (103.5 KiB)

527-12 Addendum 001 (360.8 KiB)

527-12 Addendum 002 (165.3 KiB)

527-12 Bid Tabulation (53.9 KiB)

528-12 Willett And Bogue Plans And Specs (2.2 MiB)

572-12 Willett Hall Walkthrough Sign-in (142.8 KiB)

C-000 COVER FINAL 071312 (249.3 KiB)

C-000 COVER FINAL 071312 (839.7 KiB)

C-001 GEN NOTES FINAL 071312 (374.3 KiB)

C-101 GRAD & DRAIN PLAN FINAL 071312 (253.6 KiB)

C-501 DETAILS FINAL 071312 (279.3 KiB)

C-502 DETAILS FINAL 071312 (157.1 KiB)

CMC Willett Parking Lot Specifications FINAL 071312 (4.8 MiB)

Awarded:


RFP 528-12 • Edwards Cleaning
Issue Date: 07-06-12 • Due Date: 05-30-12

528 -12 Edwards Cleaning Contract (261.9 KiB)

528-12 Addendum 001 (84.7 KiB)

528-12 Bid Tabulation (54.1 KiB)

528-12 Scope Of Work (274.6 KiB)

528-12 Willett And Bogue Plans And Specs (2.2 MiB)

Awarded: The Key People


For Sale • 1880-1910 Historical Wood Working Machines
Issue Date: 05-11-12 • Due Date: 07-26-12

Sold 06-08-12


RFP 526-12 • Timberline Parking Lot
Issue Date: 05-30-12 • Due Date: 06-26-12

526-12 Parking Plan (1.5 MiB)

526-12 Sign In Sheet (186.3 KiB)

526-12 Timberline Parking Lot (259.2 KiB)

Awarded: Columbine Hills Concrete


RFP 525-12 • Asbestos Abatement
Issue Date: 05-30-12 • Due Date: 06-25-12

525 -12 Asbestos Abatement (261.0 KiB)

525 -12 Sign In Sheet (337.9 KiB)

525-12 Addendum 001 (212.0 KiB)

525-12 Bogue Work Plan (1.8 MiB)

525-12 Willet Work Plan (2.4 MiB)

Awarded: Seneca


RFP 524-12 • Calaway Roof
Issue Date: 05-17-12 • Due Date: 06-15-12

524-12 Addendum 001 (224.2 KiB)

524-12 Calaway Roof Plan1 (2.0 MiB)

524-12 Calaway Roof Plan2 (1.0 MiB)

524-12 Calaway Roofing RFP (112.0 KiB)

524-12 Calaway Specifications (2.4 MiB)

524-12 Contractor Sign In-Calaway Roof (35.3 KiB)

Awarded: B & M Roofing of Colorado


RFP 522-12 • Boiler Repipe
Issue Date: 05-09-12 • Due Date: 07-03-12

522-12 Addendum 001 (162.7 KiB)

522-12 Attachment A (325.6 KiB)

522-12 Bristol Boiler Re-Pipe (100.7 KiB)

522-12 Sign In Sheet (831.6 KiB)

Awarded: Not awarded


RFP 521-12 • Rifle Parking Lot
Issue Date: 04-27-12 • Due Date: 05-31-12

521-12 Addendum 001 (185.6 KiB)

521-12 Parking Lot (267.0 KiB)

Awarded: Summit Sweeping & Asphalt Maintenance


RFP 519-12 • HVAC
Issue Date: 04-01-12 • Due Date: 06-04-12

519-12 Addendum 001 (1.4 MiB)

519-12 Addendum 002 (167.5 KiB)

519-12 Addendum 003 (210.9 KiB)

519-12 HVAC (116.3 KiB)

519-12Attachment A (307.3 KiB)

519-12Attachment B (177.1 KiB)

519-12Attachment C (95.6 KiB)

Awarded: AMS


RFP 517-12 • Line of Credit
Issue Date: 03-02-12 • Due Date: 03-16-12

517-12 Addendum 001 (269.4 KiB)

517-12 Line Of Credit Facility (245.1 KiB)

December 2011 BOT Report (856.5 KiB)

Awarded: Not awarded


RFP 514-12 • Steamboat FFE
Issue Date: 02-23-12 • Due Date: 03-30-12

514-12 FFE Steamboat (123.5 KiB)

514-12 Addendum 001 (163.8 KiB)

514-12 Steamboat FFE Bidsheet (109.0 KiB)

CMC STEAMBOAT FIRST FLOOR (1.4 MiB)

CMC STEAMBOAT SECOND FLOOR (2.2 MiB)

CMC STEAMBOAT THIRD FLOOR (1.1 MiB)

FF&E 514 Addendum 002 (23.9 KiB)

Awarded: Business Interiors by Staples – Office Furniture


RFP 516-12 • Independent Auditor
Issue Date: 02-16-12 • Due Date: 03-10-12

516-12 Addendum 001 (290.1 KiB)

516-12 Financial Auditor (157.6 KiB)

516-12 Independent Auditor Bid Sheet (152.0 KiB)

Awarded: BKD


RFP 515-12 • Graphic Identity Redesign
Issue Date: 01-16-12 • Due Date: 02-08-12

515-12 Addendum 001 (297.5 KiB)

515-12 Addendum 002 (192.1 KiB)

515-12 CMC Binder (7.6 MiB)

515-12 Graphic Identity Redesign (64.2 KiB)

Awarded: Cultivator Advertising


RFP 513-12 • Construction Project Financing
Issue Date: 01-06-12 • Due Date: 01-27-12

2011-2012 Budget Book - Final (4.1 MiB)

513-12 Addendum 001 (130.7 KiB)

513-12 Bid Sheet (38.5 KiB)

513-12 Construction Project Financing (46.9 KiB)

Financial Statements 6-30-11 (5.0 MiB)

OMB A-133 FS 6-30-11 (416.9 KiB)

PO Terms And Conditions (106.7 KiB)

State Funded FS 6-30-11 (228.6 KiB)

Awarded: Not Awarded


RFP 512-11 • Traffic and Transportation Study
Issue Date: 12-21-11 • Due Date: 01-24-12

512-11 Traffic And Transportation Study (59.3 KiB)

Awarded: LSC Transportation Consultants


RFP 511-11 • Food Service
Issue Date: 12-08-11 • Due Date: 01-03-12

511-11 Addendum 001 (93.2 KiB)

511-11 Food Service Bid Sheet (103.5 KiB)

511-11 Food Service V2 (48.3 KiB)

FS1.1 REVIEW 072111 (210.3 KiB)

FS2.1 REVIEW 072111 (187.2 KiB)

FS3.2 REVIEW 072111 (920.0 KiB)

Scan001 (13) (303.5 KiB)

Awarded: Sodexo


RFP 508-11 • Debt Collection Service
Issue Date: 10-28-11 • Due Date: 12-02-11

508-11 Addendum 001 (83.2 KiB)

508-11 Debt Collection Services (47.2 KiB)

Addendum 002 (14.6 KiB)

Awarded: Williams and Fudge Virtuoso Sourcing Group


RFP 510-11 • Commissioning Service
Issue Date: 10-13-11 • Due Date: 10-27-11

111012 8&C Commissioning Agent RFQ-P FINAL (234.1 KiB)

111013 8&C CxA Fee Worksheet (15.3 KiB)

Awarded: Please note that this RFP is being managed for the college by ARC. You may contact Scott Brown at sbrown@arcipm.comwith questions.


RFP 509-11 • Learning Management System
Issue Date: 09-15-11 • Due Date: 10-13-11

509-11 Addendum 001 (99.9 KiB)

509-11 Addendum 002 (28.8 KiB)

509-11 LMS (45.3 KiB)

Awarded: Instructure


ITB 508-11 • Soil Laboratory Equipment
Issue Date: 08-16-11 • Due Date: 08-23-11

Soil Laboratory Equipment for Natural Resource Management- go to www.RockyMountainBidSystem.com

Awarded: Humboldt Manufacturing Co.


RFP 507-11 • General Contractor
Issue Date: 07-20-11 • Due Date: 8-30-11

110720 8C-RFQ For GC Final (177.1 KiB)

Awarded: FCI


RFP 506-11 • Gas Chromatograph
Issue Date: 07-18-11 • Due Date: 08-02-11

504-11 Carpet Addendum 002 (76.6 KiB)

504-11 Carpet And Installation (48.1 KiB)

504-11 Carpet And Installation Addendum 001 (28.4 KiB)

504-11 Carpet And Installation Addendum 001 V2 (27.8 KiB)

504-11 Carpet And Installation Walkthrough Sign-in Sheet (86.5 KiB)

504-11 Carpet Bid Sheet (36.5 KiB)

Copy Of 504-11 Carpet Bid Sheet Summary (110.6 KiB)

Awarded: ThermoFisher Scientific


RFP 505-11 • 8th & Cooper Design Team
Issue Date: 06-08-11 • Due Date: 06-23-11

110607 8&C Design Team Fee Worksheet (35.5 KiB)

110607 8&C Design Team RFQ-P (159.0 KiB)

Awarded: Humphries Poli


RFP 504-11 • Carpet
Issue Date: 05-27-11 • Due Date: 06-23-11

504-11 Carpet Addendum 002 (76.6 KiB)

504-11 Carpet And Installation (48.1 KiB)

504-11 Carpet And Installation Addendum 001 (28.4 KiB)

504-11 Carpet And Installation Addendum 001 V2 (27.8 KiB)

504-11 Carpet And Installation Walkthrough Sign-in Sheet (86.5 KiB)

504-11 Carpet Bid Sheet (36.5 KiB)

Copy Of 504-11 Carpet Bid Sheet Summary (110.6 KiB)

Awarded: Carpet One


RFP 503-11 • Electronic Catalog
Issue Date: 05/25/11 • Due Date: 06/24/11

Awarded: Digital Architecture – Acalog


RFP 502-11 • Owners Representative
Issue Date: 05/04/11 • Due Date: 05/17/11

502-11 Owners Rep At 802 Grand Ave RFP Addendum 001 (94.1 KiB)

502-11 Owners Rep At Grand Ave Summary Sheet (37.6 KiB)

ALTA Survey-with Topo (2.5 MiB)

ALTA-ACSM Survey (Revised 2-14-11) (1.2 MiB)

List Of Submitting Firms (66.7 KiB)

RFP 502-11 Owners Rep Walkthru (275.6 KiB)

RFP-Background (1.7 MiB)

Selection Committee Members (78.6 KiB)

Soil Report (2.6 MiB)

Awarded: ARC


RFP 501-11 • Natural Gas
Issue Date: 05/04/11 • Due Date: 05/13/11

Awarded: Various


RFP 496-11 • Commercial Realtor
Issue Date: 04-29-11 • Due Date: 04-19-11

496-11 Sale Of 831 Grand Avenue In Glenwood Spgs (39.1 KiB)

Awarded: Bonnie Daniels of Vicki Lee Green Realtors


RFP 498-11 • BAS System
Issue Date: 03-29-11 • Due Date: 04-27-11

498-11 Addendum 001 (76.7 KiB)

498-11 BAS System At 802 Grand Avenue (40.3 KiB)

498-11 BAS System Walkthrough Sign In Sheet (76.8 KiB)

Awarded: ATS


RFP 497-11 • Fire Alarm
Issue Date: 03-25-11 • Due Date: 04-27-11

497-11 Addendum 001 (80.7 KiB)

497-11 Fire Alarm Update At 802 Grand Avenue (44.3 KiB)

497-11 Fire Alarm Update Waltkthrough Sign In List (82.4 KiB)

Awarded: APEX


RFP 495-11 • Telecom Cabling
Issue Date: 03-21-11 • Due Date: 04-18-11

495-11 Addendum 001 (100.1 KiB)

495-11 Addendum 002 (77.2 KiB)

495-11 Telecom Cabling (44.1 KiB)

495-11 Telecom Cabling At 802 Grand Ave Addendum 003 (87.5 KiB)

Basement (91.4 KiB)

Main Level (89.8 KiB)

Second Level (95.4 KiB)

Third Level (90.3 KiB)

Awarded: Wilson Cabling


RFP 494-11 • Edwards FFE
Issue Date: 03/21/11 • Due Date: 04/08/11

2nd Floor Cubicles (20.0 KiB)

494-11 FFE Edwards (49.8 KiB)

Addendum 1 CMC Edwards FFE Edwards (85.8 KiB)

CMC Edwards FFE03-21-11v4 (78.5 KiB)

Awarded: School Specialty, Staples, Cantor & Associates, Mity-Lite


RFP 491-11 • Spring Valley Addition
Issue Date: 02-16-11 • Due Date: 03-10-11

Awarded: Crystal Springs Builders


RFP 490-11 • Painting
Issue Date: 01-10-11 • Due Date: 01-24-11

Awarded: Jeff Schiros Painting


RFP 486-11 • Telescoping Stands
Issue Date: 01-10-11 • Due Date: 01-24-11

Awarded: Co. Bldg. Specialties


BACK TO TOP