Solicitations
920-21I Human Capital and Financial Management Systems
Issue Date: 01/15/2021 • Due Date: 02/03/2021
Awarded:
918-20P Personal Computers
Issue Date: 12/11/2020 • Due Date: 01/15/2021 • Updated Target Award Date: 02/12/2021
Awarded:
917-20Q Air Compressor System (Reissued)
Issue Date: 12/02/2020 • Due Date: 12/14/2020
Awarded: L.N. Curtis
916-20P Replacement Sprinkler Head
Issue Date: 11/10/2020 • Due Date: 12/09/2020
Awarded: Excel Fire Protection
915-20Q Lincoln Vantage 322 • Updated Target Award Date: 11/20/2020
Issue Date: 10/26/2020 • Due Date: 11/12/2020
Awarded: General Air Service and Supply
914-20P Texting Software Solution
Issue Date: 10/23/2020 • Due Date: 11/30/2020
Short List:
- AdmitHub, Inc.
- Globetom, LLC
- Mongoose Research, Inc.
Awarded:
913-20Q XT Camera Field Kit
Issue Date: 10/20/2020 • Due Date: 11/09/2020
Awarded: Mega Pixels Digital Inc.
912-20P Learning Commons Remodel • Updated Target Award Date: 01/05/2020
Issue Date: 11/02/2020 • Due Date: 12/11/2020
Awarded: Raine Construction, LLC
911-20P Needlepoint Bipolar Ionization • Updated Target Award Date: 11/20/2020
Issue Date: 10/16/2020 • Due Date: 11/11/2020
Awarded: Northern Colorado Energy Solutions
910-20Q Waterjet Cutting Machine
Issue Date: 09/29/2020 • Due Date: 10/07/2020
Awarded: No Award
909-20Q Bunker Gear
Issue Date: 09/23/2020 • Due Date: 10/12/2020
Awarded: ROI Fire & Ballistics Equipment
908-20P Insurance Broker
Issue Date: 09/14/2020 • Due Date: 10/12/2020 • Updated Target Award Date: 11/13/2020
Short List:
- Alliant
- Arthur J. Gallagher
- IMA
Awarded: Arthur J. Gallagher
907-20P Nursing Lab General Contractor
Issue Date: 09/16/2020 • Updated Due Date: 10/08/2020
- 907-20P-Addendum-001
- 907-20P-Addendum-002
- 907-20P-Bid-Sheet
- 907-20P-Construction-Contract
- 907-20P-Construction-Drawings
- 907-20P-Nursing-Lab-General-Contractor
- 907-20P-Walkthrough-Sign-Up
- Addendum-002-Acousti-Seal-Encore-Brochure
- Addendum-002-Construction-Drawings-Revision-1
- Addendum-002-Fire-Protection-Plans
Awarded: AP Mountain States
906-20P Medical Simulation Platform
Issue Date: 09/15/2020 • Due Date: 10/09/2020 • Updated Target Award Date: 11/18/2020
Short List:
- B-Line Medical
- CAE Healthcare
- Education Management Solutions
- KbPort
Finalists:
- Education Management Solutions
- KbPort
Awarded: KbPort
905-20P Security Glass Upgrade
Issue Date: 09/14/2020 • Due Date: 09/28/2020
Awarded: No Award
904-20Q Air Compressor System
Issue Date: 10/16/2020 • Due Date: 11/06/2020
Awarded: No Award, to be re-issued
903-20Q Paired Panel Operable Glass Wall Partitions
Issue Date: 09/09/2020 • Due Date: 10/12/2020 • Updated Target Award Date: 10/23/2020
903-20Q Addendum 001 (16.9 MiB)
903-20Q Morgridge Glass Panels (0.3 MiB)
IMG 6678 (0.8 MiB)
IMG 6679 (0.8 MiB)
Morgridge Commons Arch Plans (0.3 MiB)
Morgridge Commons Structural Drawings (4.1 MiB)
Awarded: Associated Building Specialties
902-20P Chiller Replacement
Issue Date: 07/29/2020 • Due Date: 08/24/2020
902-20P Addendum 001 (0.1 MiB)
902-20P Chiller Replacement (0.4 MiB)
902-20P Sign-In Sheet (0.1 MiB)
Awarded: American Mechanical Systems
901-20Q Compost Power Screen
Issue Date: 06/19/2020 • Due Date: 07/13/2020
RFQ-901-20Q Compost Power Screeen Bid Sheet (32 KiB)
RFQ-901-20Q Compost Power Screen (0.3 MiB)
Awarded: Argus Industrial Company
900-20Q Pull Type Top Dreser
Issue Date: 06/19/2020 • Due Date: 07/09/2020
RFQ-900-20Q Bid Sheet (32 KiB)
RFQ-900-20Q Pull Type Grass Topdresser (0.3 MiB)
Awarded: US Tractor and Harvest
899-20P Flooring Replacement - Rifle Campus
Issue Date: 05/13/2020 • Due Date: 06/10/2020
899-20P Flooring Replacement (0.4 MiB)
899-20P Sign-In Sheet (0.2 MiB)
Awarded: AG Flooring LLC
898-20P Sidewalk Replacement
Issue Date: 05/14/2020 • Due Date: 06/10/2020
898-20P Addendum 001 (0.1 MiB)
898-20P Addendum 002 (0.1 MiB)
898-20P Sidewalk Replacement (0.9 MiB)
Awarded: No Award
897-20P Interior Painting
Issue Date: 05/05/2020 • Updated Due Date: 05/22/2020
897-20P Addendum 001 (0.1 MiB)
897-20P Interior Painting (0.4 MiB)
897-20P Sign-In Sheet (0.5 MiB)
Awarded: Peak to Peak Painting Inc.
896-20P Flooring Replacement
Issue Date: 05/05/2020 • Updated Due Date: 05/22/2020
896-20P Addendum 001 (0.1 MiB)
896-20P Addendum 002 (1.7 MiB)
896-20P Flooring Replacement (1.3 MiB)
896-20P Sign-In Sheet (0.3 MiB)
Awarded: Network Interiors
895-20P Collegewide Sign Fabrication and Installation
Issue Date: 04/28/2020 • Due Date: 05/15/2020 • Updated Target Award Date: 06/15/2020
895-20P Addendum 001 (0.2 MiB)
895-20P Bid Sheet (70 KiB)
895-20P College-Wide Sign (0.4 MiB)
Electrical (22.9 MiB)
Specifications (15.1 MiB)
Awarded: Signdealz Corporation.
894-20Q Boiler Replacement
Issue Date: 04/22/2020 • Due Date: 05/20/2020
894-20P Addendum 001 (0.2 MiB)
894-20P Boiler Removal & Replacement (0.4 MiB)
894-20P Sign-In Sheet (0.4 MiB)
Detailed Drawing (68 KiB)
Dillon Existing Photos (0.6 MiB)
Specifications (0.3 MiB)
Awarded: American Mechanical Services
893-20Q Welding Equipment
Issue Date: 04/16/2020 • Due Date: 05/07/2020
RFQ-893-20Q Bid Sheet (33 KiB)
RFQ-893-20Q Welding Equipment (0.3 MiB)
Awarded: Holzburg Communications, Inc.
892-20P College-Wide Sign Fabrication and Installation
Issue Date: 04/01/2020 •
892-20P Addendum 001 (0.1 MiB)
892-20P Bid Sheet (64 KiB)
892-20P College-Wide Sign (0.4 MiB)
Breckenridge Specs (1.5 MiB)
Carbondale Specs (1.4 MiB)
Edwards Specs (2.4 MiB)
Glenwood Springs Specs (1.2 MiB)
Leadville Specs (0.5 MiB)
Rifle Specs (1.4 MiB)
Spring Valley Specs (2.6 MiB)
Steamboat Springs Specs (2.8 MiB)
Awarded: No Award - RFP to be reposted at a later date
891-20P Student Training Solution
Issue Date: 05/04/2020 • Due Date: 05/29/2020 • Updated Target Award Date: 06/19/2020
891-20P Addendum 001 (0.1 MiB)
891-20P Student Training Solution (0.4 MiB)
Awarded: Cornerstone
890-20P Auditorium Seating Re-Upholstery
Issue Date: 02/26/2020 • Due Date: 03/25/2020
890-20P Auditorium Seating Re-Upholstery (1.0 MiB)
890-20P Sign-In Sheet (75 KiB)
Awarded: AG Flooring
889-20P Edwards Roof Replacement
Issue Date: 03/26/2020 • Due Date: 05/04/2020 • Updated Target Award Date: 06/10/2020
889-20P Addendum 001 (0.1 MiB)
889-20P Addendum 002 (0.6 MiB)
889-20P Sign-In Sheet (75 KiB)
Building Permit Card (0.8 MiB)
Construction Drawings (3.1 MiB)
Edwards Aerial (0.3 MiB)
Edwards Aerial (002) (0.3 MiB)
Edwards-South Side Parapet Heights (0.1 MiB)
RFP 889-20P Roof Replacement (0.4 MiB)
Specifications (2.7 MiB)
Awarded: Dynamic Roofing Holdings LLC
888-20P Glenwood Center Roof Replacement
Issue Date: 02/21/2020 • Due Date: 03/20/2020 • Updated Target Award Date: 06/05/2020
888-20P Addendum 001 (0.1 MiB)
888-20P Sign-In Sheet (61 KiB)
Exhibit A (2.8 MiB)
Exhibit B (4.5 MiB)
RFP 888-20P Roof Replacement (0.4 MiB)
Awarded: G2 Roofing & Construction
887-20Q Trail Bikes
Issue Date: 02/25/2020 • Due Date: 03/16/2020
887-20Q Addendum 001 (0.1 MiB)
887-20Q Bid Sheet (32 KiB)
887-20Q Trail Bikes (0.3 MiB)
Awarded: Cycles of Life
886-20Q UV Printer
Issue Date: 02/25/2020 • Due Date: 03/11/2020
886-20Q UV Printer (0.3 MiB)
Awarded: ColDesi Inc.
885-20Q Veterinary Class IV Laser
Issue Date: 02/12/2020 • Due Date: 02/26/2020
885-20Q Veterinary Class IV Laser (0.3 MiB)
Awarded: Green Dream International LLC
884-20Q Snowmaking Fan Gun
Issue Date: 02/12/2020 • Due Date: 02/28/2020
884-20Q Addendum 001 (0.1 MiB)
884-20Q Snowmaking Fan Gun (0.3 MiB)
Awarded: No Award
883b-20P Bear Park Phase III
Issue Date: 02/10/2020 • Due Date: 03/06/2020
883b- 20P Addendum 001 (0.1 MiB)
883b-20P Bear Park Phase III (0.4 MiB)
883b-20P Bid Sheet (15 KiB)
Exhibit A - Bear Gardens Ph 3 Dome And Civil Plans (39.9 MiB)
Exhibit B - Materials List And Description Of Duties (16 KiB)
Awarded: No Award
883a-20P Bear Park Phase III
Issue Date: 02/10/2020 • Due Date: 03/06/2020
883a- 20P Addendum 001 (0.1 MiB)
883a-20P Bear Park Phase III (0.4 MiB)
883a-20P Bid Sheet (12 KiB)
Exhibit A - Bear Gardens Ph 3 Dome And Civil Plans (39.9 MiB)
Exhibit B - Materials List And Description Of Duties (16 KiB)
Awarded: Native Excavating
882-20P Residence Hall Remodels
Issue Date: 02/05/2020 • Due Date: 03/04/2020
882-20P Addendum 001 (0.1 MiB)
882-20P Addendum 002 (0.1 MiB)
882-20P Bid Sheet (20 KiB)
882-20P Leadville Sign In Sheet (0.3 MiB)
882-20P Residence Hall Remodels (0.4 MiB)
882-20P Spring Valley Sign In Sheet (66 KiB)
882-20P Steamboat Sign In Sheet (0.1 MiB)
Construction Contract (35 KiB)
Hill Hall Construction Drawings 01-31-20 (2.4 MiB)
Hill Hall Specifications (3.4 MiB)
Mountain View Construction Drawings 01-31-20 (1.7 MiB)
Mountain View Specifications (3.3 MiB)
Sopris Hall Construction Drawings 013120 (1.7 MiB)
Sopris Hall Specifications (3.8 MiB)
Awarded:
Leadville - Hess Contracting
Spring Valley - Ford Construction
Steamboat - Classic Contractors
880-20P Hill Hall Exterior Painting
Issue Date: 01/24/2020 • Due Date: 03/02/2020
880-20P Addendum 001 (0.2 MiB)
880-20P Addendum 002 (0.1 MiB)
880-20P Hill Hall Exterior Painting (0.4 MiB)
Pciture - Cracks 3 (0.1 MiB)
Picture - Cracks 1 (72 KiB)
Picture - Cracks 2 (81 KiB)
Picture - Cracks 4 (52 KiB)
Picture - Cracks 5 (68 KiB)
Picture - Cracks 6 (68 KiB)
Picture 1 (70 KiB)
Picture 10 (78 KiB)
Picture 11 (70 KiB)
Picture 2 (65 KiB)
Picture 3 (66 KiB)
Picture 4 (66 KiB)
Picture 5 (62 KiB)
Picture 6 (78 KiB)
Picture 7 (52 KiB)
Picture 8 (72 KiB)
Picture 9 (82 KiB)
Awarded: CertaPro Painters
878-20P Vet Tech Fencing
Issue Date: 02/05/2020 • Due Date: 03/04/2020
878-20P Addendum 001 (0.1 MiB)
878-20P Bid Sheet (31 KiB)
878-20P Sign In Sheet (49 KiB)
878-20P Vet Tech Fencing (0.5 MiB)
Awarded: Ace Fencing
877-20P Sopris Residence Hall Exterior Painting
Issue Date: 02/04/2020 • Due Date: 03/04/2020
877-20P Addendum 001 (0.2 MiB)
877-20P Addendum 002 (0.1 MiB)
877-20P Sign In Sheet (0.6 MiB)
877-20P Sopris Residence Hall Exterior Painting (0.4 MiB)
CMC Sopris 01 (1.0 MiB)
CMC Sopris 02 (4.2 MiB)
CMC Sopris 03 (3.5 MiB)
CMC Sopris 04 (3.5 MiB)
CMC Sopris 05 (5.3 MiB)
CMC Sopris 06 (3.8 MiB)
CMC Sopris 07 (3.6 MiB)
CMC Sopris 08 (5.2 MiB)
CMC Sopris 09 (2.9 MiB)
CMC Sopris 10 (2.6 MiB)
CMC Sopris 11 (3.7 MiB)
CMC Sopris 12 (2.8 MiB)
CMC Sopris 13 (2.8 MiB)
CMC Sopris 14 (2.9 MiB)
CMC Sopris 15 (3.0 MiB)
CMC Sopris 16 (3.1 MiB)
CMC Sopris 17 (2.9 MiB)
CMC Sopris 18 (3.0 MiB)
CMC Sopris 19 (3.5 MiB)
CMC Sopris 20 (3.8 MiB)
CMC Sopris 21 (3.6 MiB)
Drawings (0.4 MiB)
Drawings (0.4 MiB)
Awarded: Steve's Painting and Decorating, Inc.
876-20Q Weather Station Equipment
Issue Date: 01/17/2020 • Due Date: 02/03/2020
876-20Q Addendum 001 (0.1 MiB)
876-20Q Weather Station Equipment Bid Sheet (33 KiB)
Awarded: Intermountain Environmental Inc.
Upcoming Projects
- Bristol Hall General Contractor:
Issue February, 2021 with Tentative Start Date of May 10, 2021. Scope to include pumping of foundation piers, 750’ sidewalk repair and replacement and replacement of concrete patio pad and replace with pavers. - Breckenridge Storage Facility
Issue Spring, 2021 for Board of Trustee approval in June, 2021, if necessary.
Approximately 1250 square foot free standing building with climbing tower. One area to be approximately 25’ high and the lower area being approximately 10’ high. - Residence Hall Remodels
Steamboat Springs – one wing: Issue February, 2021. Tentative Start Date of May 10, 2021.
Spring Valley – one floor: Issue February, 2021. Tentative Start Date of May 10, 2021.
Leadville – remodel of 10 rooms to 7 apartments: Issue March, 2021. Ideal Start Date summer, 2021. - Steamboat Storage Facility
Issue late Springs, 2021 for work to be Summer, 2021. No design yet.