Solicitations


892-20P College-Wide Sign Fabrication and Installation

Issue Date: 04/01/2020 • Due Date: 04/27/2020

892-20P Bid Sheet (64 KiB)

892-20P College-Wide Sign (0.4 MiB)

Breckenridge Specs (1.5 MiB)

Carbondale Specs (1.4 MiB)

Edwards Specs (2.4 MiB)

Glenwood Springs Specs (1.2 MiB)

Leadville Specs (0.5 MiB)

Rifle Specs (1.4 MiB)

Spring Valley Specs (2.6 MiB)

Steamboat Springs Specs (2.8 MiB)

Awarded:


890-20P Auditorium Seating Re-Upholstery

Issue Date: 02/26/2020 • Due Date: 03/25/2020

890-20P Auditorium Seating Re-Upholstery (1.0 MiB)

890-20P Sign-In Sheet (75 KiB)

Awarded: AG Flooring


889-20P Edwards Roof Replacement

Issue Date: 03/26/2020 • Due Date: 05/04/2020

889-20P Addendum 001 (0.1 MiB)

Building Permit Card (0.8 MiB)

Construction Drawings (3.1 MiB)

RFP 889-20P Roof Replacement (0.4 MiB)

Specifications (2.7 MiB)

Awarded:


888-20P Glenwood Center Roof Replacement

Issue Date: 02/21/2020 • Due Date: 03/20/2020 • Updated Target Award Date: 04/08/2020

888-20P Addendum 001 (0.1 MiB)

888-20P Sign-In Sheet (61 KiB)

Exhibit A (2.8 MiB)

Exhibit B (4.5 MiB)

RFP 888-20P Roof Replacement (0.4 MiB)

Awarded:


887-20Q Trail Bikes

Issue Date: 02/25/2020 • Due Date: 03/16/2020

887-20Q Addendum 001 (0.1 MiB)

887-20Q Bid Sheet (32 KiB)

887-20Q Trail Bikes (0.3 MiB)

Awarded: Cycles of Life


886-20Q UV Printer

Issue Date: 02/25/2020 • Due Date: 03/11/2020

886-20Q UV Printer (0.3 MiB)

Awarded: ColDesi Inc.


885-20Q Veterinary Class IV Laser

Issue Date: 02/12/2020 • Due Date: 02/26/2020

885-20Q Veterinary Class IV Laser (0.3 MiB)

Awarded: Green Dream International LLC


884-20Q Snowmaking Fan Gun

Issue Date: 02/12/2020 • Due Date: 02/28/2020

884-20Q Addendum 001 (0.1 MiB)

884-20Q Snowmaking Fan Gun (0.3 MiB)

Awarded: No Award


883b-20P Bear Park Phase III

Issue Date: 02/10/2020 • Due Date: 03/06/2020

883b- 20P Addendum 001 (0.1 MiB)

883b-20P Bear Park Phase III (0.4 MiB)

883b-20P Bid Sheet (15 KiB)

Exhibit A - Bear Gardens Ph 3 Dome And Civil Plans (39.9 MiB)

Exhibit B - Materials List And Description Of Duties (16 KiB)

Awarded:


883a-20P Bear Park Phase III

Issue Date: 02/10/2020 • Due Date: 03/06/2020

883a- 20P Addendum 001 (0.1 MiB)

883a-20P Bear Park Phase III (0.4 MiB)

883a-20P Bid Sheet (12 KiB)

Exhibit A - Bear Gardens Ph 3 Dome And Civil Plans (39.9 MiB)

Exhibit B - Materials List And Description Of Duties (16 KiB)

Awarded:


882-20P Residence Hall Remodels

Issue Date: 02/05/2020 • Due Date: 03/04/2020

882-20P Addendum 001 (0.1 MiB)

882-20P Addendum 002 (0.1 MiB)

882-20P Bid Sheet (20 KiB)

882-20P Leadville Sign In Sheet (0.3 MiB)

882-20P Residence Hall Remodels (0.4 MiB)

882-20P Spring Valley Sign In Sheet (66 KiB)

882-20P Steamboat Sign In Sheet (0.1 MiB)

Construction Contract (35 KiB)

Hill Hall Construction Drawings 01-31-20 (2.4 MiB)

Hill Hall Specifications (3.4 MiB)

Mountain View Construction Drawings 01-31-20 (1.7 MiB)

Mountain View Specifications (3.3 MiB)

Sopris Hall Construction Drawings 013120 (1.7 MiB)

Sopris Hall Specifications (3.8 MiB)

Awarded:

Leadville -  Hess Contracting

Spring Valley -  Ford Construction

Steamboat - Classic Contractors


880-20P Hill Hall Exterior Painting

Issue Date: 01/24/2020 • Due Date: 03/02/2020

880-20P Addendum 001 (0.2 MiB)

880-20P Addendum 002 (0.1 MiB)

880-20P Hill Hall Exterior Painting (0.4 MiB)

Pciture - Cracks 3 (0.1 MiB)

Picture - Cracks 1 (72 KiB)

Picture - Cracks 2 (81 KiB)

Picture - Cracks 4 (52 KiB)

Picture - Cracks 5 (68 KiB)

Picture - Cracks 6 (68 KiB)

Picture 1 (70 KiB)

Picture 10 (78 KiB)

Picture 11 (70 KiB)

Picture 2 (65 KiB)

Picture 3 (66 KiB)

Picture 4 (66 KiB)

Picture 5 (62 KiB)

Picture 6 (78 KiB)

Picture 7 (52 KiB)

Picture 8 (72 KiB)

Picture 9 (82 KiB)

Awarded: CertaPro Painters


878-20P Vet Tech Fencing

Issue Date: 02/05/2020 • Due Date: 03/04/2020

878-20P Addendum 001 (0.1 MiB)

878-20P Bid Sheet (31 KiB)

878-20P Sign In Sheet (49 KiB)

878-20P Vet Tech Fencing (0.5 MiB)

Awarded: Ace Fencing


877-20P Sopris Residence Hall Exterior Painting

Issue Date: 02/04/2020 • Due Date: 03/04/2020

877-20P Addendum 001 (0.2 MiB)

877-20P Addendum 002 (0.1 MiB)

877-20P Sign In Sheet (0.6 MiB)

877-20P Sopris Residence Hall Exterior Painting (0.4 MiB)

CMC Sopris 01 (1.0 MiB)

CMC Sopris 02 (4.2 MiB)

CMC Sopris 03 (3.5 MiB)

CMC Sopris 04 (3.5 MiB)

CMC Sopris 05 (5.3 MiB)

CMC Sopris 06 (3.8 MiB)

CMC Sopris 07 (3.6 MiB)

CMC Sopris 08 (5.2 MiB)

CMC Sopris 09 (2.9 MiB)

CMC Sopris 10 (2.6 MiB)

CMC Sopris 11 (3.7 MiB)

CMC Sopris 12 (2.8 MiB)

CMC Sopris 13 (2.8 MiB)

CMC Sopris 14 (2.9 MiB)

CMC Sopris 15 (3.0 MiB)

CMC Sopris 16 (3.1 MiB)

CMC Sopris 17 (2.9 MiB)

CMC Sopris 18 (3.0 MiB)

CMC Sopris 19 (3.5 MiB)

CMC Sopris 20 (3.8 MiB)

CMC Sopris 21 (3.6 MiB)

Drawings (0.4 MiB)

Drawings (0.4 MiB)

Awarded: Steve's Painting and Decorating, Inc.


876-20Q Weather Station Equipment

Issue Date: 01/17/2020 • Due Date: 02/03/2020

876-20Q Addendum 001 (0.1 MiB)

876-20Q Weather Station Equipment Bid Sheet (33 KiB)

Awarded: Intermountain Environmental Inc.


875-19P GOL! General Contractor

Issue Date: 12/10/19 • Due Date: 01/17/20

Short List:

  • Iron Mike Construction, LLC
  • KW Construction & Restoration
  • LM Kersting Construction Company

875-19P Addendum 001 (0.1 MiB)

875-19P GOL! General Contractor (0.4 MiB)

Fee & General Conditions Workbook (41 KiB)

Awarded: LM Kersting Construction Company


874-19Q Self-Contained Breathing Apparatus

Issue Date: 12/09/19 • Due Date: 01/02/20

Updated Target Award Date: 01/10/20

874-19Q Addendum 001 (0.1 MiB)

874-19Q Addendum 002 (0.1 MiB)

874-19Q Bid Sheet (31 KiB)

874-19Q Self-Contained Breathing Apparatus (0.3 MiB)

Awarded: Schur-Sales & Marketing/3M Scot Fire & Safety


872-19I Buena Vista Property

Issue Date: 11/12/19 • Due Date: 12/18/19

872-19I Addendum 001 (0.2 MiB)

872-19I Buena Vista Property (0.2 MiB)

872-19I Walkthrough Sign In Sheet (0.2 MiB)

AMS Contract (27.2 MiB)

Plans (14.1 MiB)

Survey (4.4 MiB)

Title Commitment (1.0 MiB)

Awarded:


871-19P Event Management Software

Issue Date: 12/02/19 • Updated Due Date: 01/15/20

871-19P Addendum 001 (0.2 MiB)

871-19P Event Management Software (0.4 MiB)

Awarded: No Award


870-19Q Key Cutter, Cores and Keys

Issue Date: 10/31/19 • Due Date: 11/19/19

870-19Q Bid Sheet Key Cutter, Cores And Keys (32 KiB)

870-19Q Key Cutter, Cores And Keys (0.3 MiB)

Key Cutter, Cores And Keys (0.4 MiB)

Awarded: Rae Security


869-19P Translation Services

Issue Date: 10/29/19 • Updated Due Date: 11/22/19

Addendum To Be Posted: 11/15/19 • Updated Target Award Date: 01/10/2020

869-19P Translation Services (0.5 MiB)

RFP 869-19P Addendum 001 (0.2 MiB)

Short List:

  • Idea Language Services
  • Infinitive Language
  • Susana Menendez
  • The Spanish Group
  • Translation Source

Awarded: The Spanish Group


868-19P Structured Cabling

Issue Date: 10/25/19 • Due Date: 11/20/19

868-19P Structured Cabling (0.4 MiB)

CMC Infrastructure Standards - Update 2-19-18 (0.2 MiB)

Awarded: Global Cable, Inc.


867-19I Commercial Property Lease or Sale

Issue Date: 10/18/19 • Due Date: 11/08/19

867-19I Commercial Property (0.2 MiB)

Awarded:


866-19P Solar Developer Partner

Issue Date: 09/24/19 • Due Date: 10/18/19

Updated Short List Date: 10/30/19

866-19P Addendum 001 (0.1 MiB)

866-19P Addendum 002 (5.2 MiB)

866-19P Sign In Sheet (76 KiB)

866-19P Solar Developer (0.3 MiB)

Spring Valley PV Area (0.8 MiB)

Short List:

  • Ameresco
  • Namaste Solar
  • Pivot Energy
  • RES Distributed, LLC

Awarded: Ameresco


865-19P Outdoor Furniture

Issue Date: 10/01/19 • Due Date: 10/25/19

865-19P Addendum 001 (0.1 MiB)

865-19P Outdoor Furniture (0.3 MiB)

Short List:

  • Staples
  • Workplace Interiors/Office Depot

Awarded:


864-19P Online Tutoring Services

Issue Date: 08/14/19 • Due Date: 09/06/19

Target Award Date: 10/25/19

Short list:

  • NCS Pearson
  • Tutor.com, Inc.

864-19P Addendum 001 (0.2 MiB)

864-19P Online Tutoring Services (0.4 MiB)

Awarded: NCS Pearson Inc. operating through Smarthinking Division


863-19Q Stereomicroscopes

Issue Date: 08/09/19 • Due Date: 08/30/19

Updated Target Award Date: 09/13/19

863-19Q Addendum 001 (0.1 MiB)

863-19Q Bid Sheet (31 KiB)

863-19Q Microscopes (0.2 MiB)

Awarded: North Central Instruments


862-19Q Lincoln Torchmate 4800 Plasma Table

Issue Date: 08/12/19 • Due Date: 08/30/19

Updated Target Award Date: 11/01/19

RFQ-862 Lincoln Torchmate 4800 Plasma Table (0.3 MiB)

RFQ-862-19Q Bid Sheet (32 KiB)

Awarded: No Award


861-19Q Med Dispense, Headwall Teaching System, and Hill-Rom Advanta Bed

Issue Date: 07/18/19 • Due Date: 08/16/19

Updated Target Award Date: 09/06/19

RFQ-861 Med Dispense- Medication Dispensing System (0.3 MiB)

RFQ-861-19Q Bid Sheet Med Dispense- Medication Dispensing System (33 KiB)

Awarded: Pocket Nurse


860-19P Fitness Equipment

Issue Date: 07/03/19 • Due Date: 07/24/19

Updated Target Award Date: 8/19/19

2018-11-20 Fitness Equipment Plan With Dimensions (0.6 MiB)

860-19P Fitness Equipment (0.4 MiB)

CMC Fitness Center Second Level Floor Plan (1.0 MiB)

CMC SPRING VALLEY FITNESS AND RECREATION CENTER LEVEL 2 CANTER LAYOUT (0.4 MiB)

RFP 860-19P Addendum 001 (0.2 MiB)

RFQ-860-19P Bid Sheet (41 KiB)

Awarded: ProMaxima


859-19P COP Underwriting Services

Issue Date: 06/18/19 • Due Date: 07/12/19

Short List Date: 8/2/19 • Updated Target Award Date: 09/06/19

859-19P Addendum 001 (0.1 MiB)

859-19P COP Underwriter Services (0.4 MiB)

Short List:

  • George K. Baum
  • Morgan Stanley
  • Stifel

Awarded: Stifel


858-19I MBA Partnership

Issue Date: 06/17/19 • Due Date: 07/15/19

RFI 858-19I MBA Partnership (0.2 MiB)

Awarded:


857-19P Makerspace Roof Replacement

Issue Date: 06/04/19 • Due Date: 06/28/19 • Updated Target Award Date: 7/12/19

1903J-05-21-19-Permit Set (0.8 MiB)

1903J-05-21-19-Specifications (0.3 MiB)

857-19P Addendum 001 (0.1 MiB)

857-19P Makerspace Roof Replacement (0.4 MiB)

857-19P Walkthrough Sheet (51 KiB)

Awarded: Pacific Roofing


856-19Q Cleaning Equipment

Issue Date: 05/14/19 • Due Date: 06/04/19

Bid Sheet 856-19Q Cleaning Equipment (34 KiB)

RFQ-856-19Q Cleaning Equipment (0.3 MiB)

Awarded: Western Paper Distributors


855-19P Spring Valley Audio/Visual

Issue Date: 05/02/19 • Updated Due Date: 05/21/19
• Updated Target Award Date: 5/31/19

855-19 Bid Sheet - Fitness & Rec Center (36 KiB)

855-19 Bid Sheet - Student Commons (37 KiB)

855-19P Addendum 001 (0.1 MiB)

855-19P Addendum 002 (0.1 MiB)

855-19P Bid Sheet (38 KiB)

855-19P Bid Sheet - Ascent Center (32 KiB)

855-19P Spring Valley Audio Visual (0.4 MiB)

Construction Drawings - Ascent Center (3.7 MiB)

Construction Drawings - Fitness Center (3.9 MiB)

Construction Drawings - Student Center (2.6 MiB)

Specs - Ascent Center (0.3 MiB)

Specs - Fitness Center (0.5 MiB)

Specs - Student Center (0.4 MiB)

Awarded: CCS Presentation Systems


854-19Q Licensed Microwave Backhaul Equipment

Issue Date: 04/25/19 • Due Date: 05/15/19 • Updated Target Award Date: 06/07/19

854-19P Bid Sheet (33 KiB)

854-19Q Addendum 001 (0.2 MiB)

854-19Q Addendum 002 (0.1 MiB)

RFQ 854-19Q Licensed Microwave Backhaul Equipment (0.3 MiB)

Short List of Candidates:

  • Castle Rock Microwave
  • Distributed Antenna Build

Awarded: Castle Rock Microwave


853-19Q Trail Bikes

Issue Date: 04/23/19 • Due Date: 05/15/19

RFQ 853-19Q Addendum 001 (0.1 MiB)

RFQ 853-19Q Trail Bikes Bid Sheet (32 KiB)

RFQ-853-19Q Trail Bikes (0.3 MiB)

Awarded: Orange Peel Bikes


852-19P Facilities Master Plan

Issue Date: 04/09/19 • Due Date: 05/03/19

2009 Master Plan (7.3 MiB)

2017-18 Room Utilization (0.4 MiB)

852-19p Sign In Sheet (15 KiB)

CMC Sustainability Action Plan (28.7 MiB)

Master Academic Plan (3.1 MiB)

McKinstry Scope (3.1 MiB)

RFP 852-19P Addendum 001 (0.2 MiB)

RFP 852-19P Facilities Master Plan (0.2 MiB)

Student And Workforce Housing Market And Demand Analysis (7.1 MiB)

Awarded: AECOM


850-19P Basecamp Migration

Issue Date: 03/20/19 • Due Date: 04/08/19

RFP 850-19P Addendum 001 (0.8 MiB)

RFP 850-19P Basecamp Migration (0.2 MiB)

Awarded: Affirma Consulting


849-19P Asbestos Abatement

Issue Date: 03/15/19 • Due Date: 04/15/19

849-19P Sign In Sheet (0.1 MiB)

Bid Form For Stipulated Sum (33 KiB)

RFP 849-19P Addendum 001 (0.1 MiB)

RFP 849-19P Asbestos Abatement (6.3 MiB)

Student Center Asbestos Abatement Work Plan (5.9 MiB)

Awarded: Environmental Demolition Insight


848-19Q Combi Oven

Issue Date: 03/14/19 • Due Date: 04/01/19*

*Please note the due date is incorrect on the cover page of the RFP document.

RFQ 848-19Q Bid Sheet (32 KiB)

RFQ 848-19Q Gas Combi Oven (0.3 MiB)

Awarded: Pueblo Hotel Supply


847-19P Moving and Storage Services

Issue Date: 03/18/19 • Due Date: 04/10/19

847-19P Walkthrough Sign In Sheet (58 KiB)

RFP 847-19P Bid Sheet (31 KiB)

RFP 847-19P Moving & Storage (0.3 MiB)

Awarded: No Award


846-19P Small Projects General Contractor

Issue Date: 03/13/19 • Due Date: 04/10/19*

*Please note the due date is incorrect on the cover page of the RFP document

RFP 846-19P Sign In Sheet (14 KiB)

RFP 846-19P Small Project General Contractor (0.4 MiB)

Awarded: BlueSky Restoration Contractors, Hess Contracting Inc., and Kuboske Company Inc.


845-19P Bear Park Phase II

Issue Date: 03/08/19 • Due Date: 04/12/19

845-19P Walkthrough Sign In Sheet (57 KiB)

Bear Park Phase II - Construction Documents (11.3 MiB)

Bear Park Phase II - Dome Specs (36.1 MiB)

Bear Park Phase II - Special Provisions (4.1 MiB)

Bear Park Phase II Bid Sheet (12 KiB)

Bear Park Phase II Project Specifications - Architectural (6.5 MiB)

RFP 845-19P Addendum 001 (0.2 MiB)

RFP 845-19P Addendum 002 (0.3 MiB)

RFP 845-19P Addendum 003 (0.8 MiB)

RFP 845-19P Bear Park Phase II (0.4 MiB)

Awarded: Classic Contractors


844-19P Debt Collection Services

Issue Date: 02/25/19 • Due Date: 03/25/19 • Updated Short List Date: 4/3/19

RFP 844-19P Addendum 001 (0.2 MiB)

RFP 844-19P Bid Sheet (13 KiB)

RFP 844-19P Debt Collection Services (0.5 MiB)

Awarded: BC Services and Williams & Fudge


843-19P Fitness Lockers

Issue Date: 02/14/19 • Due Date: 03/08/19

RFP 843-19P Addendum 001 (0.1 MiB)

RFP 843-19P Fitness Center Lockers (0.4 MiB)

Specifications (0.9 MiB)

Awarded: Norcon of New Mexico


841-19P Capital Campaign Manager

Issue Date: 02/07/19 • Updated Due Date: 03/25/19

RFP 841-19P Capital Campaign Manager (0.4 MiB)

Awarded: No Award


840-19P Residence Hall Remodel

Issue Date: 02/05/19 • Due Date: 03/04/19

840-19P Walkthrough Sign In Sheet (76 KiB)

RFP 840-19P Addendum 001 (0.1 MiB)

RFP 840-19P Spring Valley Res Hall Remodel (0.4 MiB)

Sopris Hall Bid Sheet (12 KiB)

Sopris Hall Renovations (0.7 MiB)

Sorpis Hall Demolition (0.6 MiB)

Spris Hall Specifications (3.5 MiB)

Awarded: Ford Construction Company, Inc.


839-19Q 3D Printed Anatomy Replicas

Issue Date: 01/22/19 • Due Date: 02/11/19

RFQ-839-19Q 3D Printed Anatomy Replicas (0.3 MiB)

RFQ-839-19Q 3D Printed Anatomy Replicas Bid Sheet (14 KiB)

Awarded: Anatomy Warehouse


838-19Q Extractor Fume Mobiflex

Issue Date: 01/18/19 • Due Date: 02/08/19

RFQ 838-19Q Addendum 001 (34 KiB)

RFQ-838-19Q Bid Sheet (14 KiB)

RFQ-838-19Q Extractor Fume Mobiflex (0.3 MiB)

Awarded: General Air


837-19Q Extra Long Mattresses

Issue Date: 01/16/19 • Due Date: 02/08/19

RFQ 837-19Q Addendum 001 (0.1 MiB)

RFQ 837-19Q Bid Sheet (15 KiB)

RFQ 837-19Q Bid Sheet (15 KiB)

RFQ 837-19Q Extra Long Mattresses (0.3 MiB)

Awarded: August Mattresses


836-19P Quigley Library Roof Replacement

Issue Date: 02/05/19 • Amended Due Date: 3/11/19

836-19P Walkthrough Sign In Sheet (83 KiB)

Exhibit A (2.1 MiB)

Exhibit B (2.1 MiB)

RFP 836-19P Addendum 001 (0.4 MiB)

RFP 836-19P Addendum 002 (0.1 MiB)

RFP 836-19P Addendum 003 (0.2 MiB)

RFP 836-19P Addendum 004 (3.2 MiB)

RFP 836-19P Quigley Roof Replacement (0.3 MiB)

Awarded: Mullenax Roofing


835-19P Bear Park Site Work

Issue Date: 1/10/19 • Due Date: 2/15/19

Bear Gardens Civil & Electrical CDs (7.2 MiB)

Bear Park Site Plan (3.6 MiB)

Bear Park Soils Report (1.9 MiB)

RFP 835-19P Addendum 001 (0.1 MiB)

RFP 835-19P Bear Park Site Work (0.4 MiB)

RFP 835-19P Bid Sheet (13 KiB)

RFP 835-19P Bid Sheet REVISED (13 KiB)

Walk-through Sign In Sheet (0.2 MiB)

Awarded: Native Excavating


834-19P GOL! General Contractor - Addition to Existing Building

Issue Date: 1/9/19 • Due Date: 2/8/19

Addendum to be Posted: 1/29/19 • Updated Proposal Due Date: 2/11/19

GOL! Envelope Compliance Cert (2.6 MiB)

GOL! Approved Plans (7.7 MiB)

GOL! Construction Documents (5.2 MiB)

GOL! Geotechnical Report (1.4 MiB)

GOL! Inspection Card (0.5 MiB)

RFP 834-19P Addendum 001 (0.2 MiB)

RFP 834-19P Bid Sheet (13 KiB)

RFP 834-19P GOL! GC (0.4 MiB)

Walk-through Sign In Sheet (64 KiB)

Awarded: No Award


833-18Q Latex Printer

Issue Date: 12/6/18 • Due Date: 12/19/18

RFQ 833-18Q Addendum 001 (0.1 MiB)

RFQ-833-18Q Bid Sheet Latex Printer (14 KiB)

RFQ-833-18Q Latex Printer (0.3 MiB)

Awarded: PSI Digital Imaging Solutions


832-18Q Espresso Cappuccino Machine

Issue Date: 12/6/18 • Due Date: 1/3/19

RFQ-832-18Q Bid Sheet (14 KiB)

RFQ-832-18Q Espresso Cappuccino Machine (0.3 MiB)

Awarded: Tundra Restaurant Supply


830-18Q Veterinary Tech Canine Dental, Bandaging, and Equine Neck

Issue Date: 11/1/18 • Due Date: 11/20/18

RFQ-830-18Q Bid Sheet (14 KiB)

RFQ-830-18Q Canine Dental, Bandaging, Equine Neck (0.3 MiB)

Awarded: No Award


829-18P VMWare NSX Licensing

Issue Date: 11/5/18 • Due Date: 11/30/18

RFP 829-18P Addendum 001 (31 KiB)

RFP 829-18P Bid Sheet (14 KiB)

RFP 829-18P Vmware NSX Licensing (0.4 MiB)

Awarded: Venture Technologies contingent upon confirmation and approval of budget.


828-18P Rooftop Unit Replacement

Issue Date: 10/26/18 • Due Date: 11/28/18

Updated Due Date: 12/05/18

Updated Award Date: 1/7/2019

RFP 828-18P Addendum 001 (15.3 MiB)

RFP 828-18P RTU Replacement (0.4 MiB)

Walk Through RFP-828 RTU Replacement (0.2 MiB)

Awarded: Reliant Heating & Air Conditioning Services, LLC


827-18P Professional Security Services

Issue Date: 10/26/18 • Due Date: 11/30/18

Updated Award Date: 12/21/18

827-18P Walkthrough Sign-in Sheet (74 KiB)

RFP 827-18P Professional Security Services (0.4 MiB)

Awarded: Citadel Security USA


826-18P Capital Campaign Aspen

Issue Date: 10/23/18 • Due Date: 11/12/18 • Revised Short List Date: 11/27/18

Updated Target Award Date: 12/21/18

CMCF Aspen Handout (1.0 MiB)

RFP 826-18 Capital Campaign Aspen Consultant (0.4 MiB)

RFP 826-18P Addendum 001 (41 KiB)

Short List Candidates:

    • Aspen Marketing Partners
    • Darnauer Group
    • GBSM
    • O Communications

Finalists:

  • Darnauer Group
  • GBSM

Awarded: GBSM/PR Studio/Brave & Co.


825-18P Professional Custodial Services

Issue Date: 10/23/18 • Due Date: 11/16/18

1st Floor Floor Plans 802 Grand (74 KiB)

825-18P Walkthrough Sign-In (56 KiB)

Cooper Commons Floor Plans (0.5 MiB)

Morgridge Commons-2nd Floor Floor Plan (0.2 MiB)

RFP 825-18P Custodial Services (0.6 MiB)

Awarded: Cardiff Cleaners


824-18P Fiber Plant Construction

Issue Date: 10/19/18 • Due Date: 11/12/18 • Updated Target Award Date: 12/14/18

RFP 824-18P Addendum 001 (35 KiB)

RFP-824-18P Fiber Plant Construction (0.4 MiB)

Steamboat Campus Fiber Map (2.3 MiB)

Walkthrough Sign In Sheet (15 KiB)

Awarded: Lightworks Fiber & Consulting contingent upon confirmation and approval of budget, schedule and phasing options.


823-18P Facilities Condition Assessment

Issue Date: 10/24/18 • Updated Due Date: 11/28/18

Short List Announced: 12/07/18

  • Facility Engineering Associates P.C.
  • McKinstry
  • Partner Engineering & Science, Inc

Interviews: 12/17/18

802 Grand Ave Condition Assessment (4.3 MiB)

823-18P Facilities Condition Assessment (0.4 MiB)

823-18P Walkthrough Call-ins (81 KiB)

823-18P Walkthrough Sign-in Sheet (In Person) (0.1 MiB)

CMC Physical Plant Attributes (18 KiB)

RFP 823-18P Addendum 001 (33 KiB)

RFP 823-18P Addendum 002 (42 KiB)

RFP 823-18P Addendum 002 - 802 Grand Report (4.3 MiB)

RFP 823-18P Addendum 002 - Fee Schedule (10 KiB)

RFP 823-18P Addendum 002 - Physical Plant Attributes (18 KiB)

RFP 823-18P Addendum 002 - RFP (0.2 MiB)

RFP-823-18P-Addendum-003-Fee-Schedule (11 KiB)

RFP-823-18P-Addendum-003-Physical-Plant-Attributes (18 KiB)

Awarded: McKinstry Essention, LLC


822-18P Professional Custodial Services

Issue Date: 10/11/18 • Due Date: 11/09/18

822-18P Walkthrough List (39 KiB)

RFP 822-18P Addendum 001 (0.6 MiB)

RFP 822-18P Custodial Services (0.6 MiB)

Awarded: Magic Shine


821-18Q Pottery Wheels

Issue Date: 10/16/18 • Due Date: 11/12/18

RFQ-821-18Q Bid Sheet (14 KiB)

RFQ-821-18Q Pottery Wheels (0.3 MiB)

Awarded: The Ceramic Shop


820-18P Technology Data Storage

Issue Date: 10/10/18 • Due Date: 11/12/18

Short List Candidates:

    • CDW Government LLC
    • Connection Public Sector Solutions
    • Flair Data Systems
    • Glass House Systems
    • Lewan Technology
    • Venture Technologies

Second Short List Candidates:

  • CDW Government LLC
  • Lewan Technology

Amended Short List Announcement: 11/29/18

Amended Interview Date: 12/6 or 12/7

Amended Award Date: 01/25/19

820-18P Technology Data Storage (0.2 MiB)

Appendix A (14 KiB)

RFP 820-18P Addendum (0.2 MiB)

Awarded: Lewan Technologies


819-18P Property Management Services

Issue Date: 09/06/18 • Due Date: 10/03/18

819-18P Property Management Services (0.2 MiB)

819-18P Property Management Walk Through (57 KiB)

Awarded: Corum Real Estate Group


818-18P Ellucian Colleague Consultant

Issue Date: 08/31/18 • Due Date: 09/21/18

RFP 818-18P Addendum 001 (67 KiB)

RFP 818-18P Ellucian Colleague Consultant (0.2 MiB)

Awarded: Campus Works Inc. and Ferrilli


817-18I College Wide Emergency Communications Solution

Issue Date: 08/22/18 • Due Date: 09/21/18

Breck Finish Plans (1.3 MiB)

Building List For ECS RFI (17 KiB)

RFI 817-18I Addendum (84 KiB)

RFI-817-18I College Wide Emergency Communications Solution (0.1 MiB)

No Award Intended


816-18P Advertising Creative

Issue Date: 08/22/18 • Updated Short List Date: 10/17/2018
Due Date: 09/14/18 • Interviews: 10/30/18

RFP 816-18P Addendum (0.1 MiB)

RFP 816-18P Advertising Creative (0.2 MiB)

Short List Candidates:

Cultivator

Ideas Made Measureable

Awarded: Cultivator


815-18P Digital Advertising Management

Issue Date: 08/22/18 • Updated Short List Date: 10/12/2018
Due Date: 09/14/18 • Interviews: 10/18/2018

Addendum-CMC Analytics (0.5 MiB)

RFP 815-18P Addendum (0.1 MiB)

RFP 815-18P Digital Advertising Management (0.2 MiB)

Short List Candidates:

Backbone Media

IMM

SE2

Salvage

Awarded: Backbone Media


813-18Q Riding Lawn Mower

Issue Date: 08/14/18 • Due Date: 09/07/18

Bid Sheet (14 KiB)

RFQ 813-18Q Addendum (76 KiB)

RFQ 813-18Q Riding Lawn Mower (0.2 MiB)

Awarded: Berthod Motors


812-18Q EMS Cut Suit

Issue Date: 08/10/18 • Due Date: 08/22/18

RFQ 812-18Q Addendum (75 KiB)

RFQ-812-18Q EMS Cut Suit (0.2 MiB)

Awarded: CAE Healthcare


811-18P Roof Replacement- Leadville

Issue Date: 08/02/18 • Due Date: 08/29/18

RFP 811-18P Addendum 001 (71 KiB)

RFP 811-18P Roof Replacement (0.2 MiB)

Walk-Through Sign In (0.1 MiB)

Amended Target Award Date: 09/12/18

Awarded: Peak View Roofing Company


810-18Q Digital Backs- High Resolution

Issue Date: 07/30/18 • Due Date: 08/10/18

810-18Q Digital Backs (0.2 MiB)

RFQ-810-18Q Bid Sheet FY2017-18 (14 KiB)

Awarded: MegaPixels


809-18P Digital Radiography System

Issue Date: 07/27/18 • Due Date: 08/14/18

809-18P Bid Sheet (14 KiB)

809-18P Digital Radiography System Vet Tech SVC (0.2 MiB)

Portable Next Equine DR Specification Sheet (0.6 MiB)

RFP 809-18P Addendum (67 KiB)

Awarded: Sound


808-18P Heat Trace- Roof Edge Only

Issue Date: 06/18/18 • Due Date: 07/09/18

RFP-808-18P Heat Trace 1 (0.2 MiB)

Walkthrough Sign-In Sheet RFP-808-18P (0.2 MiB)

Awarded: No Award


807-18P Sopris Hall Fire Alarm System Updates

Issue Date: 06/08/18 • Due Date: 07/06/18

807-18P Walkthrough Sign-in Sheet (0.2 MiB)

RFP 807-18P Fire Panels (0.2 MiB)

Awarded: No Award


805-18Q Self-Propelled Scissor Lift

Issue Date: 06/06/18 • Due Date: 06/27/18

RFQ 805-18Q Scissor Lift (0.2 MiB)

RFQ 805-18Q Scissor Lift Bid Sheet (14 KiB)

Awarded: All Around Access


804-18P Spring Valley Maker's Space Remodel-Electrical

Issue Date: 05/31/18 • Due Date: 06/25/18

804-18P Walkthrough (0.2 MiB)

CMC Maker's Space Specifications For Permit (1.2 MiB)

CMC Maker's Space-Permit Set (4.3 MiB)

RFP 804-18P Maker's Space Electrical (0.1 MiB)

Awarded: Tradesman Electrical Services


803-18P Spring Valley Maker's Space Remodel-HVAC

Issue Date: 05/31/18 • Due Date: 06/25/18

803-18P Walkthrough (0.2 MiB)

804-18P Walkthrough (0.2 MiB)

CMC Maker's Space Specifications For Permit (1.2 MiB)

CMC Maker's Space-Permit Set (4.3 MiB)

RFP 803-18P Maker's Space HVAC (0.2 MiB)

Awarded: Climate Control Company


802-18Q Defibrillator

Issue Date: 05/30/18 • Due Date: 06/15/18

RFQ-802-18Q (0.2 MiB)

RFQ-802-18Q Defibrillator Addendum 001 (74 KiB)

RFQ-802-18Q Defibrillator Addendum 001 (74 KiB)

Awarded: Physio-Control


801-18P Exterior Signage

Issue Date: 05/22/18 • Due Date: 06/18/18

Drawing (0.3 MiB)

RFP 801-18-2 Addendum 002 (71 KiB)

RFP Addendum 001 FY2017-18 (81 KiB)

RFP-801-18P-2 New TimeLine Exterior Signs Inc Installation (0.2 MiB)

Awarded: No Award


800-18Q Ballisitic Panels

Issue Date: 04/23/18 • Due Date: 05/10/18

RFQ 800-18Q Addendum 001 (71 KiB)

RFQ 800-18Q Ballistic Panels (0.2 MiB)

RFQ 800-18Q Ballistic Panels Bid Sheet 1 (15 KiB)

Awarded: Wesco Distribution


799-18P Hill Hall Fire Alarm System Update

Issue Date: 05/03/18 • Due Date: 05/31/18

799-18P Walk-through (1.4 MiB)

RFP 799-18P Fire Panels (0.2 MiB)

Awarded: Tri County Fire Protection


798-18P Digital Marketing Strategist & Community Engagement Manager

Issue Date: 04/19/18 • Due Date: 05/10/18

RFP 798-18P Addendum 001 (82 KiB)

RFP 798-19P Digital Marketing (0.2 MiB)

Awarded: Socially Queued


797-18P GOL! GC

Issue Date: 04/18/18 • Due Date: 05/14/18

GOL 100% Design Development (8.3 MiB)

RFP 797-18P Addendum 002 (89 KiB)

RFP 797-18P GOL! GC (0.2 MiB)

RFP 797-18P GOL! GC Addendum 001 (72 KiB)

RFP797-18P Walk Through Sign-In (97 KiB)

Short List Candidates:

Haselden Construction

MW Golden Constructors

PCL Construction

PNCI Construction, Inc.

Awarded: No Award


796-18P Demolition of Physical Plant Building

Issue Date: 04/11/18 • Due Date: 05/11/18

796-18P Addendum 001 (72 KiB)

796-18P Addendum 001 Exhibit (0.2 MiB)

796-18P Demolition (0.2 MiB)

Drawing 796-18P (0.8 MiB)

Sign-In Sheet 796-18P (0.9 MiB)

Awarded: Aspen Digger, Inc.


RFP 795-18P Soft Serve Ice-Cream Machine

Issue Date: 04/30/18 • Due Date: 05/16/18

RFP-795-18P Bid Sheet FY2017-18 (14 KiB)

RFP-795-18P Soft Serve Ice Cream Machine (0.2 MiB)

Awarded: No Award


RFP 794-18P Spring Valley LED Light Fixture Upgrade

Issue Date: 03/26/18 • Due Date: 04/23/18

Drawing Rm 128 (0.8 MiB)

Drawing Rm 131 (0.8 MiB)

RFP 794-18 LED Lights (0.2 MiB)

Scope Of Work - Calaway And Quigley (6.9 MiB)

Scope Of Work - Sopris Res Hall (32 KiB)

Sign-In Sheet 794-18P (1.6 MiB)

Awarded: No Award


RFP 793-18P Microscopes- Compound & Accessories

Issue Date: 04/27/18 • Due Date: 05/16/18

A60 (2.6 MiB)

DM500-750 New (1.6 MiB)

RFP-793-18P Bid Sheet (15 KiB)

RFP-793-18P Microscopes And Accessories (0.1 MiB)

Awarded: No Award


RFQ 792-18Q Emergency Phones

Issue Date: 03/06/18 • Due Date: 04/06/18

Emergency Phone Towers Specs (0.1 MiB)

RFQ-792-18 Emergency Phones (0.1 MiB)

Awarded: Case Systems


RFQ 791-18Q Portable Radios

Issue Date: 03/06/18 • Due Date: 04/06/18

Target Award Date: 04/30/18

RFQ 791-18Q Addendum 001 (0.1 MiB)

RFQ-791-18Q Bid Sheet (14 KiB)

RFQ-791-18Q Portable Radios (0.1 MiB)

Awarded: QDS


RFP 790-18P Exterior Window Security Film Installation

Issue Date: 03/05/18 • Due Date: 04/02/18

790-18P Addendum (68 KiB)

790-18P Security Window Film (0.2 MiB)

Attachment A (51 KiB)

Walkthrough Security Film 1 (0.2 MiB)

Awarded: Advanced Window Solutions


RFP 789-18P Collegewide HVAC Preventative Maintenance

Issue Date: 03/05/18 • Due Date: 04/18/18

Short List Candidates:

American Mechanical Services

Tolin Mechanical

789-18P Addendum 003 (74 KiB)

789-18P Collegewide HVAC Addendum 002 (73 KiB)

789-18P Collegewide HVAC PM (0.2 MiB)

Attachment A (67 KiB)

Attachment B (15 KiB)

Attachment C (18 KiB)

RFP 789-18P HVAC PM Addendum 001 (74 KiB)

Sign-In Sheet 789-18 (0.8 MiB)

Awarded: American Mechanical Services


RFP 788-18P Fan Coils

Issue Date: 02/23/18 • Due Date: 03/23/18

RFP 788-18P Fan Coil Replacement (0.2 MiB)

Sign-In Sheet (0.8 MiB)

Awarded: Climate Control Company


RFP 787-18P Security Glass Upgrades

Issue Date: 02/19/18 • Due Date: 03/19/18

RFP 787-18P Security Glass Upgrades (0.2 MiB)

Sign-In Sheet (0.2 MiB)

Specifications (93 KiB)

Window Drawings (0.2 MiB)

Awarded: Alpine Glass


RFP 786-18P Alternate Entry Addition

Issue Date: 02/09/18 • Due Date: 03/12/18

786-18P Alternate Entry Addendum 001 (69 KiB)

786-18P-Alternate-Entry-Addition (0.2 MiB)

Construction-Drawings (1.2 MiB)

Cover-Sheet-General-Notes-Approved (1.4 MiB)

DETAILS (0.4 MiB)

Sign-In Sheet (0.2 MiB)

SITE-PLAN (0.7 MiB)

Summary-of-Submittal-Changes (62 KiB)

Vestibule-Door-Hardware-08710 (58 KiB)

Awarded: Hess Contracting, Inc.


RFQ 785-18 Oxy-Acetylene Manifold System

Issue Date: 03/09/18 • Due Date: 03/27/18

BI (HP Auto Cab) (0.2 MiB)

RFQ-785-18Q Oxy-Acetylene Manifold System (0.1 MiB)

Awarded: No Award


RFP 784-18 Small Project GC

Issue Date: 02/06/18 • Due Date: 03/05/18

784-18-Small-Project-Addendum-001 (69 KiB)

784-18-Small-Project-GC (0.1 MiB)

Sign-In Pre-Proposal Meeting (1.0 MiB)

Awarded:

Classic Contractors

FCI

Haselden

HLCC

MW Golden

Phoenix Industries

PNCI

Rescom


RFP 783-18P Boiler Replacement- Steamboat Springs Campus

Issue Date: 01/26/18 • Due Date: 02/28/18

783-18P Boiler Replacement Addendum 001 (69 KiB)

783-18P-Boiler-Replacement-Bristol-Hall (0.2 MiB)

783-18P-Walkthrough-Sign-In (54 KiB)

Awarded: American Mechanical Services


RFP 782-18P Gas Transport- Leadville, Dillon and Breckenridge

Issue Date: 01/19/18 • Due Date: 02/19/18

Appendix-B (97 KiB)

Exhibit-A (9 KiB)

RFP-782-18-Addendum-001 (67 KiB)

RFP-782-18-Gas-Transport (0.2 MiB)

Awarded: No Award


RFP 781-18P Parking Lot Overlayment- Edwards Campus

Issue Date: 02/01/18 • Due Date: 03/06/18

RFP 781-18 Parking Lot Overlayment Addendum 001 (72 KiB)

RFP-781-18P-Parking-Lot-Overlayment (0.2 MiB)

Target Award Date: 04/02/18

Awarded: United Companies


RFP 780-18P Residence Hall Remodel- Steamboat Springs Campus

Issue Date: 01/22/18 • Due Date: 02/19/18

780-18-P-Res-Hall-Remodel-Addendum-001 (70 KiB)

780-18P-Res-Hall-Remodel (97 KiB)

Architectural-Drawings (3.0 MiB)

Project-Specifications (6.3 MiB)

RFP-780-18P-Steamboat-Res-Hall-GC-Sign-In-Sheet (1.0 MiB)

Awarded: Classic Contractors, Inc.


RFQ 779-18Q Gas Shuttle/Car Kiln- Aspen Campus

Issue Date: 01/02/18 • Due Date: 01/30/18

RFQ-779-18Q-Gas-Suttle-Car-Kiln (0.1 MiB)

RFQ-779Q-Gas-Shuttle-Car-Kiln-Bid-Sheet (15 KiB)

Awarded: Bailey Pottery Equipment Corp.


RFP 778-18P Dampers - Steamboat Springs Energy Upgrades

Issue Date: 01/10/18 • Due Date: 02/14/18

778-18-Dampers-HVAC-Plan (0.5 MiB)

778-18-Dampers-Project-Specifications (0.3 MiB)

RFP-778-18-Dampers-Energy-Upgrade (0.2 MiB)

Awarded: No Award


RFQ 777-17Q Mill/Router Package- SVC

Issue Date: 11/13/17 • Due Date: 12/06/17

777-17Q-Bid-Sheet (15 KiB)

777-17Q-Mill-Router-Package- (0.1 MiB)

Awarded: Career & Technical Training, LLC


RFP 776-17P Digital Advertising Management

Issue Date: 11/16/17 • Due Date: 11/29/17

776-17-Addendum-001 (0.1 MiB)

776-17-Digital-Advertising-Management (0.2 MiB)

Awarded: E-Squared Communications d/b/a SE2


RFP 775-17Q Miller Dynasty Wireless Foot Control Complete Package- Rifle Campus

Issue Date: 11/06/17 • Due Date: 11/21/17

775-17Q-Bid-Sheet (14 KiB)

775-17Q-Wireless-Foot-Control (0.1 MiB)

Awarded: AirGas


RFP 774-17Q

Lincoln Downflex 400-MS/A Weld Fume Downdraft Tables and

Power Wave C300 Educational Ready-Pak Package - Rifle Campus

Issue Date: 11/06/17 • Due Date: 11/22/17

774-17Q-Bid-Sheet (15 KiB)

Addendum-001-RFQ-774-17Q-Lincoln-Downdraft-Tables (79 KiB)

RFQ-774-17Q-Lincoln-Downflex-Downdraft-Tables-and-Power-Wave-C300 (0.1 MiB)

Awarded: AirGas


RFP 773-17P General Contractor

Issue Date: 11/01/17 • Due Date: 11/29/17

Interviews: January 12th

Short List Candidates:

FCI Constructors, Inc.

Haselden Construction

Shaw Construction

773-17-Walkthrough-Sign-In (0.2 MiB)

773-17P-General-Contractor (0.2 MiB)

Addendum-001-773-17 (92 KiB)

 

Awarded: Haselden Construction, LLC


RFP 772-17P Professional Security Services

Issue Date: 09/06/17 • Due Date: 10/04/17

772-17-Professional-Security-Services (0.2 MiB)

Walk-Through-772-17P (3.0 MiB)

Awarded: Denver Metro Protective Services


RFP 770-17P Student Recruitment Consultant

Issue Date: 08/04/17 • Due Date: 08/25/17

Target Award Date Extended to 09/25/17

770-17-P-Addendum-v -1 (91 KiB)

770-17P-Student-Recruitment-Consultant (0.2 MiB)

Short List Candidates:

Aviso Retention

Ruffalo Noel Levitz

Awarded: Ruffalo Noel Levitz


RFP 769-17P Mt. Zion Weather Station

Issue Date: 07/27/17 • Due Date: 08/16/17

Addendum-001-v -1 (0.5 MiB)

Addendum-002 (0.1 MiB)

Addendum-003 (33 KiB)

Mt-Zion-weather-station-equipment-specifications-v -1 (75 KiB)

RFP-769-17P-Mt -Zion-Weather-Station (0.2 MiB)

Awarded: Intermountain Environmental, Inc.


RFQ 768-17Q Welding Equipment Leadville Campus

Issue Date: 07/24/17 • Due Date: 08/04/17

Addendum-001-Welding-Equip (67 KiB)

Bid-Sheet (15 KiB)

DD-2X4 Product-sheet W17-03 (0.9 MiB)

RFQ-768-17Q-Welding-Equipment-v -1 2 (0.1 MiB)

Awarded: AirGas