875-19P GOL! General Contractor
Issue Date: 12/10/19 • Due Date: 01/17/20
Short List:
- Iron Mike Construction, LLC
- KW Construction & Restoration
- LM Kersting Construction Company
875-19P Addendum 001 (0.1 MiB)
875-19P GOL! General Contractor (0.4 MiB)
Fee & General Conditions Workbook (41 KiB)
Awarded: LM Kersting Construction Company
874-19Q Self-Contained Breathing Apparatus
Issue Date: 12/09/19 • Due Date: 01/02/20
Updated Target Award Date: 01/10/20
874-19Q Addendum 001 (0.1 MiB)
874-19Q Addendum 002 (0.1 MiB)
874-19Q Bid Sheet (31 KiB)
874-19Q Self-Contained Breathing Apparatus (0.3 MiB)
Awarded: Schur-Sales & Marketing/3M Scot Fire & Safety
872-19I Buena Vista Property
Issue Date: 11/12/19 • Due Date: 12/18/19
872-19I Addendum 001 (0.2 MiB)
872-19I Buena Vista Property (0.2 MiB)
872-19I Walkthrough Sign In Sheet (0.2 MiB)
AMS Contract (27.2 MiB)
Plans (14.1 MiB)
Survey (4.4 MiB)
Title Commitment (1.0 MiB)
871-19P Event Management Software
Issue Date: 12/02/19 • Updated Due Date: 01/15/20
871-19P Addendum 001 (0.2 MiB)
871-19P Event Management Software (0.4 MiB)
Awarded: No Award
870-19Q Key Cutter, Cores and Keys
Issue Date: 10/31/19 • Due Date: 11/19/19
870-19Q Bid Sheet Key Cutter, Cores And Keys (32 KiB)
870-19Q Key Cutter, Cores And Keys (0.3 MiB)
Key Cutter, Cores And Keys (0.4 MiB)
Awarded: Rae Security
869-19P Translation Services
Issue Date: 10/29/19 • Updated Due Date: 11/22/19
Addendum To Be Posted: 11/15/19 • Updated Target Award Date: 01/10/2020
869-19P Translation Services (0.5 MiB)
RFP 869-19P Addendum 001 (0.2 MiB)
Short List:
- Idea Language Services
- Infinitive Language
- Susana Menendez
- The Spanish Group
- Translation Source
Awarded: The Spanish Group
868-19P Structured Cabling
Issue Date: 10/25/19 • Due Date: 11/20/19
868-19P Structured Cabling (0.4 MiB)
CMC Infrastructure Standards - Update 2-19-18 (0.2 MiB)
Awarded: Global Cable, Inc.
867-19I Commercial Property Lease or Sale
Issue Date: 10/18/19 • Due Date: 11/08/19
867-19I Commercial Property (0.2 MiB)
866-19P Solar Developer Partner
Issue Date: 09/24/19 • Due Date: 10/18/19
Updated Short List Date: 10/30/19
866-19P Addendum 001 (0.1 MiB)
866-19P Addendum 002 (5.2 MiB)
866-19P Sign In Sheet (76 KiB)
866-19P Solar Developer (0.3 MiB)
Spring Valley PV Area (0.8 MiB)
Short List:
- Ameresco
- Namaste Solar
- Pivot Energy
- RES Distributed, LLC
Awarded: Ameresco
865-19P Outdoor Furniture
Issue Date: 10/01/19 • Due Date: 10/25/19
865-19P Addendum 001 (0.1 MiB)
865-19P Outdoor Furniture (0.3 MiB)
Short List:
- Staples
- Workplace Interiors/Office Depot
Awarded:
864-19P Online Tutoring Services
Issue Date: 08/14/19 • Due Date: 09/06/19
Target Award Date: 10/25/19
Short list:
- NCS Pearson
- Tutor.com, Inc.
864-19P Addendum 001 (0.2 MiB)
864-19P Online Tutoring Services (0.4 MiB)
Awarded: NCS Pearson Inc. operating through Brainfuse Division
863-19Q Stereomicroscopes
Issue Date: 08/09/19 • Due Date: 08/30/19
Updated Target Award Date: 09/13/19
863-19Q Addendum 001 (0.1 MiB)
863-19Q Bid Sheet (31 KiB)
863-19Q Microscopes (0.2 MiB)
Awarded: North Central Instruments
862-19Q Lincoln Torchmate 4800 Plasma Table
Issue Date: 08/12/19 • Due Date: 08/30/19
Updated Target Award Date: 11/01/19
RFQ-862 Lincoln Torchmate 4800 Plasma Table (0.3 MiB)
RFQ-862-19Q Bid Sheet (32 KiB)
Awarded: No Award
861-19Q Med Dispense, Headwall Teaching System, and Hill-Rom Advanta Bed
Issue Date: 07/18/19 • Due Date: 08/16/19
Updated Target Award Date: 09/06/19
RFQ-861 Med Dispense- Medication Dispensing System (0.3 MiB)
RFQ-861-19Q Bid Sheet Med Dispense- Medication Dispensing System (33 KiB)
Awarded: Pocket Nurse
860-19P Fitness Equipment
Issue Date: 07/03/19 • Due Date: 07/24/19
Updated Target Award Date: 8/19/19
2018-11-20 Fitness Equipment Plan With Dimensions (0.6 MiB)
860-19P Fitness Equipment (0.4 MiB)
CMC Fitness Center Second Level Floor Plan (1.0 MiB)
CMC SPRING VALLEY FITNESS AND RECREATION CENTER LEVEL 2 CANTER LAYOUT (0.4 MiB)
RFP 860-19P Addendum 001 (0.2 MiB)
RFQ-860-19P Bid Sheet (41 KiB)
Awarded: ProMaxima
859-19P COP Underwriting Services
Issue Date: 06/18/19 • Due Date: 07/12/19
Short List Date: 8/2/19 • Updated Target Award Date: 09/06/19
859-19P Addendum 001 (0.1 MiB)
859-19P COP Underwriter Services (0.4 MiB)
Short List:
- George K. Baum
- Morgan Stanley
- Stifel
Awarded: Stifel
858-19I MBA Partnership
Issue Date: 06/17/19 • Due Date: 07/15/19
RFI 858-19I MBA Partnership (0.2 MiB)
Awarded:
857-19P Makerspace Roof Replacement
Issue Date: 06/04/19 • Due Date: 06/28/19 • Updated Target Award Date: 7/12/19
1903J-05-21-19-Permit Set (0.8 MiB)
1903J-05-21-19-Specifications (0.3 MiB)
857-19P Addendum 001 (0.1 MiB)
857-19P Makerspace Roof Replacement (0.4 MiB)
857-19P Walkthrough Sheet (51 KiB)
Awarded: Pacific Roofing
856-19Q Cleaning Equipment
Issue Date: 05/14/19 • Due Date: 06/04/19
Bid Sheet 856-19Q Cleaning Equipment (34 KiB)
RFQ-856-19Q Cleaning Equipment (0.3 MiB)
Awarded: Western Paper Distributors
855-19P Spring Valley Audio/Visual
Issue Date: 05/02/19 • Updated Due Date: 05/21/19
• Updated Target Award Date: 5/31/19
855-19 Bid Sheet - Fitness & Rec Center (36 KiB)
855-19 Bid Sheet - Student Commons (37 KiB)
855-19P Addendum 001 (0.1 MiB)
855-19P Addendum 002 (0.1 MiB)
855-19P Bid Sheet (38 KiB)
855-19P Bid Sheet - Ascent Center (32 KiB)
855-19P Spring Valley Audio Visual (0.4 MiB)
Construction Drawings - Ascent Center (3.7 MiB)
Construction Drawings - Fitness Center (3.9 MiB)
Construction Drawings - Student Center (2.6 MiB)
Specs - Ascent Center (0.3 MiB)
Specs - Fitness Center (0.5 MiB)
Specs - Student Center (0.4 MiB)
Awarded: CCS Presentation Systems
854-19Q Licensed Microwave Backhaul Equipment
Issue Date: 04/25/19 • Due Date: 05/15/19 • Updated Target Award Date: 06/07/19
854-19P Bid Sheet (33 KiB)
854-19Q Addendum 001 (0.2 MiB)
854-19Q Addendum 002 (0.1 MiB)
RFQ 854-19Q Licensed Microwave Backhaul Equipment (0.3 MiB)
Short List of Candidates:
- Castle Rock Microwave
- Distributed Antenna Build
Awarded: Castle Rock Microwave
853-19Q Trail Bikes
Issue Date: 04/23/19 • Due Date: 05/15/19
RFQ 853-19Q Addendum 001 (0.1 MiB)
RFQ 853-19Q Trail Bikes Bid Sheet (32 KiB)
RFQ-853-19Q Trail Bikes (0.3 MiB)
Awarded: Orange Peel Bikes
852-19P Facilities Master Plan
Issue Date: 04/09/19 • Due Date: 05/03/19
2009 Master Plan (7.3 MiB)
2017-18 Room Utilization (0.4 MiB)
852-19p Sign In Sheet (15 KiB)
CMC Sustainability Action Plan (28.7 MiB)
Master Academic Plan (3.1 MiB)
McKinstry Scope (3.1 MiB)
RFP 852-19P Addendum 001 (0.2 MiB)
RFP 852-19P Facilities Master Plan (0.2 MiB)
Student And Workforce Housing Market And Demand Analysis (7.1 MiB)
Awarded: AECOM
850-19P Basecamp Migration
Issue Date: 03/20/19 • Due Date: 04/08/19
RFP 850-19P Addendum 001 (0.8 MiB)
RFP 850-19P Basecamp Migration (0.2 MiB)
Awarded: Affirma Consulting
849-19P Asbestos Abatement
Issue Date: 03/15/19 • Due Date: 04/15/19
849-19P Sign In Sheet (0.1 MiB)
Bid Form For Stipulated Sum (33 KiB)
RFP 849-19P Addendum 001 (0.1 MiB)
RFP 849-19P Asbestos Abatement (6.3 MiB)
Student Center Asbestos Abatement Work Plan (5.9 MiB)
Awarded: Environmental Demolition Insight
848-19Q Combi Oven
Issue Date: 03/14/19 • Due Date: 04/01/19*
*Please note the due date is incorrect on the cover page of the RFP document.
RFQ 848-19Q Bid Sheet (32 KiB)
RFQ 848-19Q Gas Combi Oven (0.3 MiB)
Awarded: Pueblo Hotel Supply
847-19P Moving and Storage Services
Issue Date: 03/18/19 • Due Date: 04/10/19
847-19P Walkthrough Sign In Sheet (58 KiB)
RFP 847-19P Bid Sheet (31 KiB)
RFP 847-19P Moving & Storage (0.3 MiB)
Awarded: No Award
846-19P Small Projects General Contractor
Issue Date: 03/13/19 • Due Date: 04/10/19*
*Please note the due date is incorrect on the cover page of the RFP document
RFP 846-19P Sign In Sheet (14 KiB)
RFP 846-19P Small Project General Contractor (0.4 MiB)
Awarded: BlueSky Restoration Contractors, Hess Contracting Inc., and Kuboske Company Inc.
845-19P Bear Park Phase II
Issue Date: 03/08/19 • Due Date: 04/12/19
845-19P Walkthrough Sign In Sheet (57 KiB)
Bear Park Phase II - Construction Documents (11.3 MiB)
Bear Park Phase II - Dome Specs (36.1 MiB)
Bear Park Phase II - Special Provisions (4.1 MiB)
Bear Park Phase II Bid Sheet (12 KiB)
Bear Park Phase II Project Specifications - Architectural (6.5 MiB)
RFP 845-19P Addendum 001 (0.2 MiB)
RFP 845-19P Addendum 002 (0.3 MiB)
RFP 845-19P Addendum 003 (0.8 MiB)
RFP 845-19P Bear Park Phase II (0.4 MiB)
Awarded: Classic Contractors
844-19P Debt Collection Services
Issue Date: 02/25/19 • Due Date: 03/25/19 • Updated Short List Date: 4/3/19
RFP 844-19P Addendum 001 (0.2 MiB)
RFP 844-19P Bid Sheet (13 KiB)
RFP 844-19P Debt Collection Services (0.5 MiB)
Awarded: BC Services and Williams & Fudge
843-19P Fitness Lockers
Issue Date: 02/14/19 • Due Date: 03/08/19
RFP 843-19P Addendum 001 (0.1 MiB)
RFP 843-19P Fitness Center Lockers (0.4 MiB)
Specifications (0.9 MiB)
Awarded: Norcon of New Mexico
841-19P Capital Campaign Manager
Issue Date: 02/07/19 • Updated Due Date: 03/25/19
RFP 841-19P Capital Campaign Manager (0.4 MiB)
Awarded: No Award
840-19P Residence Hall Remodel
Issue Date: 02/05/19 • Due Date: 03/04/19
840-19P Walkthrough Sign In Sheet (76 KiB)
RFP 840-19P Addendum 001 (0.1 MiB)
RFP 840-19P Spring Valley Res Hall Remodel (0.4 MiB)
Sopris Hall Bid Sheet (12 KiB)
Sopris Hall Renovations (0.7 MiB)
Sorpis Hall Demolition (0.6 MiB)
Spris Hall Specifications (3.5 MiB)
Awarded: Ford Construction Company, Inc.
839-19Q 3D Printed Anatomy Replicas
Issue Date: 01/22/19 • Due Date: 02/11/19
RFQ-839-19Q 3D Printed Anatomy Replicas (0.3 MiB)
RFQ-839-19Q 3D Printed Anatomy Replicas Bid Sheet (14 KiB)
Awarded: Anatomy Warehouse
838-19Q Extractor Fume Mobiflex
Issue Date: 01/18/19 • Due Date: 02/08/19
RFQ 838-19Q Addendum 001 (34 KiB)
RFQ-838-19Q Bid Sheet (14 KiB)
RFQ-838-19Q Extractor Fume Mobiflex (0.3 MiB)
Awarded: General Air
837-19Q Extra Long Mattresses
Issue Date: 01/16/19 • Due Date: 02/08/19
RFQ 837-19Q Addendum 001 (0.1 MiB)
RFQ 837-19Q Bid Sheet (15 KiB)
RFQ 837-19Q Bid Sheet (15 KiB)
RFQ 837-19Q Extra Long Mattresses (0.3 MiB)
Awarded: August Mattresses
836-19P Quigley Library Roof Replacement
Issue Date: 02/05/19 • Amended Due Date: 3/11/19
836-19P Walkthrough Sign In Sheet (83 KiB)
Exhibit A (2.1 MiB)
Exhibit B (2.1 MiB)
RFP 836-19P Addendum 001 (0.4 MiB)
RFP 836-19P Addendum 002 (0.1 MiB)
RFP 836-19P Addendum 003 (0.2 MiB)
RFP 836-19P Addendum 004 (3.2 MiB)
RFP 836-19P Quigley Roof Replacement (0.3 MiB)
Awarded: Mullenax Roofing
835-19P Bear Park Site Work
Issue Date: 1/10/19 • Due Date: 2/15/19
Bear Gardens Civil & Electrical CDs (7.2 MiB)
Bear Park Site Plan (3.6 MiB)
Bear Park Soils Report (1.9 MiB)
RFP 835-19P Addendum 001 (0.1 MiB)
RFP 835-19P Bear Park Site Work (0.4 MiB)
RFP 835-19P Bid Sheet (13 KiB)
RFP 835-19P Bid Sheet REVISED (13 KiB)
Walk-through Sign In Sheet (0.2 MiB)
Awarded: Native Excavating
834-19P GOL! General Contractor - Addition to Existing Building
Issue Date: 1/9/19 • Due Date: 2/8/19
Addendum to be Posted: 1/29/19 • Updated Proposal Due Date: 2/11/19
GOL! Envelope Compliance Cert (2.6 MiB)
GOL! Approved Plans (7.7 MiB)
GOL! Construction Documents (5.2 MiB)
GOL! Geotechnical Report (1.4 MiB)
GOL! Inspection Card (0.5 MiB)
RFP 834-19P Addendum 001 (0.2 MiB)
RFP 834-19P Bid Sheet (13 KiB)
RFP 834-19P GOL! GC (0.4 MiB)
Walk-through Sign In Sheet (64 KiB)
Awarded: No Award
833-18Q Latex Printer
Issue Date: 12/6/18 • Due Date: 12/19/18
RFQ 833-18Q Addendum 001 (0.1 MiB)
RFQ-833-18Q Bid Sheet Latex Printer (14 KiB)
RFQ-833-18Q Latex Printer (0.3 MiB)
Awarded: PSI Digital Imaging Solutions
832-18Q Espresso Cappuccino Machine
Issue Date: 12/6/18 • Due Date: 1/3/19
RFQ-832-18Q Bid Sheet (14 KiB)
RFQ-832-18Q Espresso Cappuccino Machine (0.3 MiB)
Awarded: Tundra Restaurant Supply
830-18Q Veterinary Tech Canine Dental, Bandaging, and Equine Neck
Issue Date: 11/1/18 • Due Date: 11/20/18
RFQ-830-18Q Bid Sheet (14 KiB)
RFQ-830-18Q Canine Dental, Bandaging, Equine Neck (0.3 MiB)
Awarded: No Award
829-18P VMWare NSX Licensing
Issue Date: 11/5/18 • Due Date: 11/30/18
RFP 829-18P Addendum 001 (31 KiB)
RFP 829-18P Bid Sheet (14 KiB)
RFP 829-18P Vmware NSX Licensing (0.4 MiB)
Awarded: Venture Technologies contingent upon confirmation and approval of budget.
828-18P Rooftop Unit Replacement
Issue Date: 10/26/18 • Due Date: 11/28/18
Updated Due Date: 12/05/18
Updated Award Date: 1/7/2019
RFP 828-18P Addendum 001 (15.3 MiB)
RFP 828-18P RTU Replacement (0.4 MiB)
Walk Through RFP-828 RTU Replacement (0.2 MiB)
Awarded: Reliant Heating & Air Conditioning Services, LLC
827-18P Professional Security Services
Issue Date: 10/26/18 • Due Date: 11/30/18
Updated Award Date: 12/21/18
827-18P Walkthrough Sign-in Sheet (74 KiB)
RFP 827-18P Professional Security Services (0.4 MiB)
Awarded: Citadel Security USA
826-18P Capital Campaign Aspen
Issue Date: 10/23/18 • Due Date: 11/12/18 • Revised Short List Date: 11/27/18
Updated Target Award Date: 12/21/18
CMCF Aspen Handout (1.0 MiB)
RFP 826-18 Capital Campaign Aspen Consultant (0.4 MiB)
RFP 826-18P Addendum 001 (41 KiB)
Short List Candidates:
-
- Aspen Marketing Partners
- Darnauer Group
- GBSM
- O Communications
Finalists:
- Darnauer Group
- GBSM
Awarded: GBSM/PR Studio/Brave & Co.
825-18P Professional Custodial Services
Issue Date: 10/23/18 • Due Date: 11/16/18
1st Floor Floor Plans 802 Grand (74 KiB)
825-18P Walkthrough Sign-In (56 KiB)
Cooper Commons Floor Plans (0.5 MiB)
Morgridge Commons-2nd Floor Floor Plan (0.2 MiB)
RFP 825-18P Custodial Services (0.6 MiB)
Awarded: Cardiff Cleaners
824-18P Fiber Plant Construction
Issue Date: 10/19/18 • Due Date: 11/12/18 • Updated Target Award Date: 12/14/18
RFP 824-18P Addendum 001 (35 KiB)
RFP-824-18P Fiber Plant Construction (0.4 MiB)
Steamboat Campus Fiber Map (2.3 MiB)
Walkthrough Sign In Sheet (15 KiB)
Awarded: Lightworks Fiber & Consulting contingent upon confirmation and approval of budget, schedule and phasing options.
823-18P Facilities Condition Assessment
Issue Date: 10/24/18 • Updated Due Date: 11/28/18
Short List Announced: 12/07/18
- Facility Engineering Associates P.C.
- McKinstry
- Partner Engineering & Science, Inc
Interviews: 12/17/18
802 Grand Ave Condition Assessment (4.3 MiB)
823-18P Facilities Condition Assessment (0.4 MiB)
823-18P Walkthrough Call-ins (81 KiB)
823-18P Walkthrough Sign-in Sheet (In Person) (0.1 MiB)
CMC Physical Plant Attributes (18 KiB)
RFP 823-18P Addendum 001 (33 KiB)
RFP 823-18P Addendum 002 (42 KiB)
RFP 823-18P Addendum 002 - 802 Grand Report (4.3 MiB)
RFP 823-18P Addendum 002 - Fee Schedule (10 KiB)
RFP 823-18P Addendum 002 - Physical Plant Attributes (18 KiB)
RFP 823-18P Addendum 002 - RFP (0.2 MiB)
RFP-823-18P-Addendum-003-Fee-Schedule (11 KiB)
RFP-823-18P-Addendum-003-Physical-Plant-Attributes (18 KiB)
Awarded: McKinstry Essention, LLC
822-18P Professional Custodial Services
Issue Date: 10/11/18 • Due Date: 11/09/18
822-18P Walkthrough List (39 KiB)
RFP 822-18P Addendum 001 (0.6 MiB)
RFP 822-18P Custodial Services (0.6 MiB)
Awarded: Magic Shine
821-18Q Pottery Wheels
Issue Date: 10/16/18 • Due Date: 11/12/18
RFQ-821-18Q Bid Sheet (14 KiB)
RFQ-821-18Q Pottery Wheels (0.3 MiB)
Awarded: The Ceramic Shop
820-18P Technology Data Storage
Issue Date: 10/10/18 • Due Date: 11/12/18
Short List Candidates:
-
- CDW Government LLC
- Connection Public Sector Solutions
- Flair Data Systems
- Glass House Systems
- Lewan Technology
- Venture Technologies
Second Short List Candidates:
- CDW Government LLC
- Lewan Technology
Amended Short List Announcement: 11/29/18
Amended Interview Date: 12/6 or 12/7
Amended Award Date: 01/25/19
820-18P Technology Data Storage (0.2 MiB)
Appendix A (14 KiB)
RFP 820-18P Addendum (0.2 MiB)
Awarded: Lewan Technologies
819-18P Property Management Services
Issue Date: 09/06/18 • Due Date: 10/03/18
819-18P Property Management Services (0.2 MiB)
819-18P Property Management Walk Through (57 KiB)
Awarded: Corum Real Estate Group
818-18P Ellucian Colleague Consultant
Issue Date: 08/31/18 • Due Date: 09/21/18
RFP 818-18P Addendum 001 (67 KiB)
RFP 818-18P Ellucian Colleague Consultant (0.2 MiB)
Awarded: Campus Works Inc. and Ferrilli
817-18I College Wide Emergency Communications Solution
Issue Date: 08/22/18 • Due Date: 09/21/18
Breck Finish Plans (1.3 MiB)
Building List For ECS RFI (17 KiB)
RFI 817-18I Addendum (84 KiB)
RFI-817-18I College Wide Emergency Communications Solution (0.1 MiB)
No Award Intended
816-18P Advertising Creative
Issue Date: 08/22/18 • Updated Short List Date: 10/17/2018
Due Date: 09/14/18 • Interviews: 10/30/18
RFP 816-18P Addendum (0.1 MiB)
RFP 816-18P Advertising Creative (0.2 MiB)
Short List Candidates:
Cultivator
Ideas Made Measureable
Awarded: Cultivator
815-18P Digital Advertising Management
Issue Date: 08/22/18 • Updated Short List Date: 10/12/2018
Due Date: 09/14/18 • Interviews: 10/18/2018
Addendum-CMC Analytics (0.5 MiB)
RFP 815-18P Addendum (0.1 MiB)
RFP 815-18P Digital Advertising Management (0.2 MiB)
Short List Candidates:
Backbone Media
IMM
SE2
Salvage
Awarded: Backbone Media
813-18Q Riding Lawn Mower
Issue Date: 08/14/18 • Due Date: 09/07/18
Bid Sheet (14 KiB)
RFQ 813-18Q Addendum (76 KiB)
RFQ 813-18Q Riding Lawn Mower (0.2 MiB)
Awarded: Berthod Motors
812-18Q EMS Cut Suit
Issue Date: 08/10/18 • Due Date: 08/22/18
RFQ 812-18Q Addendum (75 KiB)
RFQ-812-18Q EMS Cut Suit (0.2 MiB)
Awarded: CAE Healthcare
811-18P Roof Replacement- Leadville
Issue Date: 08/02/18 • Due Date: 08/29/18
RFP 811-18P Addendum 001 (71 KiB)
RFP 811-18P Roof Replacement (0.2 MiB)
Walk-Through Sign In (0.1 MiB)
Amended Target Award Date: 09/12/18
Awarded: Peak View Roofing Company
810-18Q Digital Backs- High Resolution
Issue Date: 07/30/18 • Due Date: 08/10/18
810-18Q Digital Backs (0.2 MiB)
RFQ-810-18Q Bid Sheet FY2017-18 (14 KiB)
Awarded: MegaPixels
809-18P Digital Radiography System
Issue Date: 07/27/18 • Due Date: 08/14/18
809-18P Bid Sheet (14 KiB)
809-18P Digital Radiography System Vet Tech SVC (0.2 MiB)
Portable Next Equine DR Specification Sheet (0.6 MiB)
RFP 809-18P Addendum (67 KiB)
Awarded: Sound
808-18P Heat Trace- Roof Edge Only
Issue Date: 06/18/18 • Due Date: 07/09/18
RFP-808-18P Heat Trace 1 (0.2 MiB)
Walkthrough Sign-In Sheet RFP-808-18P (0.2 MiB)
Awarded: No Award
807-18P Sopris Hall Fire Alarm System Updates
Issue Date: 06/08/18 • Due Date: 07/06/18
807-18P Walkthrough Sign-in Sheet (0.2 MiB)
RFP 807-18P Fire Panels (0.2 MiB)
Awarded: No Award
805-18Q Self-Propelled Scissor Lift
Issue Date: 06/06/18 • Due Date: 06/27/18
RFQ 805-18Q Scissor Lift (0.2 MiB)
RFQ 805-18Q Scissor Lift Bid Sheet (14 KiB)
Awarded: All Around Access
804-18P Spring Valley Maker's Space Remodel-Electrical
Issue Date: 05/31/18 • Due Date: 06/25/18
804-18P Walkthrough (0.2 MiB)
CMC Maker's Space Specifications For Permit (1.2 MiB)
CMC Maker's Space-Permit Set (4.3 MiB)
RFP 804-18P Maker's Space Electrical (0.1 MiB)
Awarded: Tradesman Electrical Services
803-18P Spring Valley Maker's Space Remodel-HVAC
Issue Date: 05/31/18 • Due Date: 06/25/18
803-18P Walkthrough (0.2 MiB)
804-18P Walkthrough (0.2 MiB)
CMC Maker's Space Specifications For Permit (1.2 MiB)
CMC Maker's Space-Permit Set (4.3 MiB)
RFP 803-18P Maker's Space HVAC (0.2 MiB)
Awarded: Climate Control Company
802-18Q Defibrillator
Issue Date: 05/30/18 • Due Date: 06/15/18
RFQ-802-18Q (0.2 MiB)
RFQ-802-18Q Defibrillator Addendum 001 (74 KiB)
RFQ-802-18Q Defibrillator Addendum 001 (74 KiB)
Awarded: Physio-Control
801-18P Exterior Signage
Issue Date: 05/22/18 • Due Date: 06/18/18
Drawing (0.3 MiB)
RFP 801-18-2 Addendum 002 (71 KiB)
RFP Addendum 001 FY2017-18 (81 KiB)
RFP-801-18P-2 New TimeLine Exterior Signs Inc Installation (0.2 MiB)
Awarded: No Award
800-18Q Ballisitic Panels
Issue Date: 04/23/18 • Due Date: 05/10/18
RFQ 800-18Q Addendum 001 (71 KiB)
RFQ 800-18Q Ballistic Panels (0.2 MiB)
RFQ 800-18Q Ballistic Panels Bid Sheet 1 (15 KiB)
Awarded: Wesco Distribution
799-18P Hill Hall Fire Alarm System Update
Issue Date: 05/03/18 • Due Date: 05/31/18
799-18P Walk-through (1.4 MiB)
RFP 799-18P Fire Panels (0.2 MiB)
Awarded: Tri County Fire Protection
798-18P Digital Marketing Strategist & Community Engagement Manager
Issue Date: 04/19/18 • Due Date: 05/10/18
RFP 798-18P Addendum 001 (82 KiB)
RFP 798-19P Digital Marketing (0.2 MiB)
Awarded: Socially Queued
797-18P GOL! GC
Issue Date: 04/18/18 • Due Date: 05/14/18
GOL 100% Design Development (8.3 MiB)
RFP 797-18P Addendum 002 (89 KiB)
RFP 797-18P GOL! GC (0.2 MiB)
RFP 797-18P GOL! GC Addendum 001 (72 KiB)
RFP797-18P Walk Through Sign-In (97 KiB)
Short List Candidates:
Haselden Construction
MW Golden Constructors
PCL Construction
PNCI Construction, Inc.
Awarded: No Award
796-18P Demolition of Physical Plant Building
Issue Date: 04/11/18 • Due Date: 05/11/18
796-18P Addendum 001 (72 KiB)
796-18P Addendum 001 Exhibit (0.2 MiB)
796-18P Demolition (0.2 MiB)
Drawing 796-18P (0.8 MiB)
Sign-In Sheet 796-18P (0.9 MiB)
Awarded: Aspen Digger, Inc.
RFP 795-18P Soft Serve Ice-Cream Machine
Issue Date: 04/30/18 • Due Date: 05/16/18
RFP-795-18P Bid Sheet FY2017-18 (14 KiB)
RFP-795-18P Soft Serve Ice Cream Machine (0.2 MiB)
Awarded: No Award
RFP 794-18P Spring Valley LED Light Fixture Upgrade
Issue Date: 03/26/18 • Due Date: 04/23/18
Drawing Rm 128 (0.8 MiB)
Drawing Rm 131 (0.8 MiB)
RFP 794-18 LED Lights (0.2 MiB)
Scope Of Work - Calaway And Quigley (6.9 MiB)
Scope Of Work - Sopris Res Hall (32 KiB)
Sign-In Sheet 794-18P (1.6 MiB)
Awarded: No Award
RFP 793-18P Microscopes- Compound & Accessories
Issue Date: 04/27/18 • Due Date: 05/16/18
A60 (2.6 MiB)
DM500-750 New (1.6 MiB)
RFP-793-18P Bid Sheet (15 KiB)
RFP-793-18P Microscopes And Accessories (0.1 MiB)
Awarded: No Award
RFQ 792-18Q Emergency Phones
Issue Date: 03/06/18 • Due Date: 04/06/18
Emergency Phone Towers Specs (0.1 MiB)
RFQ-792-18 Emergency Phones (0.1 MiB)
Awarded: Case Systems
RFQ 791-18Q Portable Radios
Issue Date: 03/06/18 • Due Date: 04/06/18
Target Award Date: 04/30/18
RFQ 791-18Q Addendum 001 (0.1 MiB)
RFQ-791-18Q Bid Sheet (14 KiB)
RFQ-791-18Q Portable Radios (0.1 MiB)
Awarded: QDS
RFP 790-18P Exterior Window Security Film Installation
Issue Date: 03/05/18 • Due Date: 04/02/18
790-18P Addendum (68 KiB)
790-18P Security Window Film (0.2 MiB)
Attachment A (51 KiB)
Walkthrough Security Film 1 (0.2 MiB)
Awarded: Advanced Window Solutions
RFP 789-18P collegewide HVAC Preventative Maintenance
Issue Date: 03/05/18 • Due Date: 04/18/18
Short List Candidates:
American Mechanical Services
Tolin Mechanical
789-18P Addendum 003 (74 KiB)
789-18P collegewide HVAC Addendum 002 (73 KiB)
789-18P collegewide HVAC PM (0.2 MiB)
Attachment A (67 KiB)
Attachment B (15 KiB)
Attachment C (18 KiB)
RFP 789-18P HVAC PM Addendum 001 (74 KiB)
Sign-In Sheet 789-18 (0.8 MiB)
Awarded: American Mechanical Services
RFP 788-18P Fan Coils
Issue Date: 02/23/18 • Due Date: 03/23/18
RFP 788-18P Fan Coil Replacement (0.2 MiB)
Sign-In Sheet (0.8 MiB)
Awarded: Climate Control Company
RFP 787-18P Security Glass Upgrades
Issue Date: 02/19/18 • Due Date: 03/19/18
RFP 787-18P Security Glass Upgrades (0.2 MiB)
Sign-In Sheet (0.2 MiB)
Specifications (93 KiB)
Window Drawings (0.2 MiB)
Awarded: Alpine Glass
RFP 786-18P Alternate Entry Addition
Issue Date: 02/09/18 • Due Date: 03/12/18
786-18P Alternate Entry Addendum 001 (69 KiB)
786-18P-Alternate-Entry-Addition (0.2 MiB)
Construction-Drawings (1.2 MiB)
Cover-Sheet-General-Notes-Approved (1.4 MiB)
DETAILS (0.4 MiB)
Sign-In Sheet (0.2 MiB)
SITE-PLAN (0.7 MiB)
Summary-of-Submittal-Changes (62 KiB)
Vestibule-Door-Hardware-08710 (58 KiB)
Awarded: Hess Contracting, Inc.
RFQ 785-18 Oxy-Acetylene Manifold System
Issue Date: 03/09/18 • Due Date: 03/27/18
BI (HP Auto Cab) (0.2 MiB)
RFQ-785-18Q Oxy-Acetylene Manifold System (0.1 MiB)
Awarded: No Award
RFP 784-18 Small Project GC
Issue Date: 02/06/18 • Due Date: 03/05/18
784-18-Small-Project-Addendum-001 (69 KiB)
784-18-Small-Project-GC (0.1 MiB)
Sign-In Pre-Proposal Meeting (1.0 MiB)
Awarded:
Classic Contractors
FCI
Haselden
HLCC
MW Golden
Phoenix Industries
PNCI
Rescom
RFP 783-18P Boiler Replacement- Steamboat Springs Campus
Issue Date: 01/26/18 • Due Date: 02/28/18
783-18P Boiler Replacement Addendum 001 (69 KiB)
783-18P-Boiler-Replacement-Bristol-Hall (0.2 MiB)
783-18P-Walkthrough-Sign-In (54 KiB)
Awarded: American Mechanical Services
RFP 782-18P Gas Transport- Leadville, Dillon and Breckenridge
Issue Date: 01/19/18 • Due Date: 02/19/18
Appendix-B (97 KiB)
Exhibit-A (9 KiB)
RFP-782-18-Addendum-001 (67 KiB)
RFP-782-18-Gas-Transport (0.2 MiB)
Awarded: No Award
RFP 781-18P Parking Lot Overlayment- Edwards Campus
Issue Date: 02/01/18 • Due Date: 03/06/18
RFP 781-18 Parking Lot Overlayment Addendum 001 (72 KiB)
RFP-781-18P-Parking-Lot-Overlayment (0.2 MiB)
Target Award Date: 04/02/18
Awarded: United Companies
RFP 780-18P Residence Hall Remodel- Steamboat Springs Campus
Issue Date: 01/22/18 • Due Date: 02/19/18
780-18-P-Res-Hall-Remodel-Addendum-001 (70 KiB)
780-18P-Res-Hall-Remodel (97 KiB)
Architectural-Drawings (3.0 MiB)
Project-Specifications (6.3 MiB)
RFP-780-18P-Steamboat-Res-Hall-GC-Sign-In-Sheet (1.0 MiB)
Awarded: Classic Contractors, Inc.
RFQ 779-18Q Gas Shuttle/Car Kiln- Aspen Campus
Issue Date: 01/02/18 • Due Date: 01/30/18
RFQ-779-18Q-Gas-Suttle-Car-Kiln (0.1 MiB)
RFQ-779Q-Gas-Shuttle-Car-Kiln-Bid-Sheet (15 KiB)
Awarded: Bailey Pottery Equipment Corp.
RFP 778-18P Dampers - Steamboat Springs Energy Upgrades
Issue Date: 01/10/18 • Due Date: 02/14/18
778-18-Dampers-HVAC-Plan (0.5 MiB)
778-18-Dampers-Project-Specifications (0.3 MiB)
RFP-778-18-Dampers-Energy-Upgrade (0.2 MiB)
Awarded: No Award
RFQ 777-17Q Mill/Router Package- SVC
Issue Date: 11/13/17 • Due Date: 12/06/17
777-17Q-Bid-Sheet (15 KiB)
777-17Q-Mill-Router-Package- (0.1 MiB)
Awarded: Career & Technical Training, LLC
RFP 776-17P Digital Advertising Management
Issue Date: 11/16/17 • Due Date: 11/29/17
776-17-Addendum-001 (0.1 MiB)
776-17-Digital-Advertising-Management (0.2 MiB)
Awarded: E-Squared Communications d/b/a SE2
RFP 775-17Q Miller Dynasty Wireless Foot Control Complete Package- Rifle Campus
Issue Date: 11/06/17 • Due Date: 11/21/17
775-17Q-Bid-Sheet (14 KiB)
775-17Q-Wireless-Foot-Control (0.1 MiB)
Awarded: AirGas
RFP 774-17Q
Lincoln Downflex 400-MS/A Weld Fume Downdraft Tables and
Power Wave C300 Educational Ready-Pak Package - Rifle Campus
Issue Date: 11/06/17 • Due Date: 11/22/17
774-17Q-Bid-Sheet (15 KiB)
Addendum-001-RFQ-774-17Q-Lincoln-Downdraft-Tables (79 KiB)
RFQ-774-17Q-Lincoln-Downflex-Downdraft-Tables-and-Power-Wave-C300 (0.1 MiB)
Awarded: AirGas
RFP 773-17P General Contractor
Issue Date: 11/01/17 • Due Date: 11/29/17
Interviews: January 12th
Short List Candidates:
FCI Constructors, Inc.
Haselden Construction
Shaw Construction
773-17-Walkthrough-Sign-In (0.2 MiB)
773-17P-General-Contractor (0.2 MiB)
Addendum-001-773-17 (92 KiB)
Awarded: Haselden Construction, LLC
RFP 772-17P Professional Security Services
Issue Date: 09/06/17 • Due Date: 10/04/17
772-17-Professional-Security-Services (0.2 MiB)
Walk-Through-772-17P (3.0 MiB)
Awarded: Denver Metro Protective Services
RFP 770-17P Student Recruitment Consultant
Issue Date: 08/04/17 • Due Date: 08/25/17
Target Award Date Extended to 09/25/17
770-17-P-Addendum-v -1 (91 KiB)
770-17P-Student-Recruitment-Consultant (0.2 MiB)
Short List Candidates:
Aviso Retention
Ruffalo Noel Levitz
Awarded: Ruffalo Noel Levitz
RFP 769-17P Mt. Zion Weather Station
Issue Date: 07/27/17 • Due Date: 08/16/17
Addendum-001-v -1 (0.5 MiB)
Addendum-002 (0.1 MiB)
Addendum-003 (33 KiB)
Mt-Zion-weather-station-equipment-specifications-v -1 (75 KiB)
RFP-769-17P-Mt -Zion-Weather-Station (0.2 MiB)
Awarded: Intermountain Environmental, Inc.
RFQ 768-17Q Welding Equipment Leadville Campus
Issue Date: 07/24/17 • Due Date: 08/04/17
Addendum-001-Welding-Equip (67 KiB)
Bid-Sheet (15 KiB)
DD-2X4 Product-sheet W17-03 (0.9 MiB)
RFQ-768-17Q-Welding-Equipment-v -1 2 (0.1 MiB)
Awarded: AirGas
RFP 767-17P Auditorium Acoustics Breckenridge
Issue Date: 07/18/17 • Due Date: 08/10/17 08/11/17
RFP Due Date and Time changed to: 08/11/17 4:00 p.m.
767-17P-Auditorium-Acoustics-Breckenridge (0.2 MiB)
Sound-diffusion-panel-layout (1.6 MiB)
Updated-Soundpost-diffusion-panel-layout (1.3 MiB)
Awarded: No Award
RFP 766-17P Veterinary Technology Fencing
Issue Date: 07/12/17 • Due Date: 08/02/17
RFP-766-17P-Veterinary-Technology-Fencing (0.2 MiB)
Awarded: No Award
RFP 765-17P Architectural & Design Team SV & Summit
Issue Date: 06/30/17 • Due Date: 08/04/17
765-17P-Architectural-Engineering-Design-Team-SVC (0.2 MiB)
Addendum-001-765-17 (97 KiB)
Master-Plan-7-19-17-SVC (6.8 MiB)
Sign-In-Sheets-Mandatory-Walkthrough (3.5 MiB)
Short List Candidates:
Andersen Mason Dale Architects
CSNA Architects
Handprint Architecture/Studio Completiva
Hord Coplan Macht/Barker Rinker Seacat
TreanorHL
Target Award Date: 09/29/17
Awarded: Anderson Mason Dale
RFQ 764-17Q Steamboat Springs LED Light Bulbs
Issue Date: 06/26/17 • Due Date: 07/12/17
Bid-Sheet-764-17-LED-Lightbulbs (16 KiB)
RFQ-764-17-Addendum-001 (64 KiB)
RFQ-764-17-Steamboat-Springs-LED-Light-Bulbs (0.1 MiB)
Awarded: 1000 Bulbs
RFP 763-17P Elevator Modernization
Issue Date: 05/26/17 • Due Date: 06/30/17
Target Award Date: 07/10/17
Leadville-Scope-of-Work (1.1 MiB)
RFP-763-17P-Elevator-Mod- (0.2 MiB)
Sign-In-Sheet-763-17P-Elevator-Mod (0.2 MiB)
SV-Scope-of-Work (1.1 MiB)
Awarded: Schindler
RFQ 762-17Q Residence Hall LED Lighting
Issue Date: 05/22/17 • Due Date: 06/12/17
Addendum-001-RFQ-762-17-v -1 (86 KiB)
Bid-Sheet-RFQ-762-17-Residence-Hall-LED-Lighting (15 KiB)
ResHallLEDLightingRFQ (0.8 MiB)
RFQ-762-17Q-Residence-Hall-LED-Lighting (0.1 MiB)
Awarded: Eco Source Lighting
RFP 761-17P Kitchen Preventative Maintenance
Issue Date: 05/31/17 • Due Date: 07/11/17
RFP-761-17P-Kitchen-PM (0.2 MiB)
Sign-In-Sheet-761-17P-Kitchen-PM-Steamboat (0.2 MiB)
Awarded:
RFQ 760-17Q Bear Proof Trash Cans
Issue Date: 05/08/17 • Due Date: 05/19/17
RFQ-760-17Q-Bear-Proof-Trash-Cans (0.1 MiB)
Awarded: BearSaver
RFQ 759-17Q Plumbing & Bathroom Accessories
Issue Date: 05/03/17 • Due Date: 05/15/17
Addendum-001-RFQ-759-17Q (64 KiB)
Bid-Sheet-RFQ-759-17-Plumbing-Bathroom-Accessories (16 KiB)
RFQ-759-17Q-Plumbing-Bathroom-Accessories (0.1 MiB)
Awarded: Hajoca Corporation
RFP 758-17P Personal Computers (PCs)
Issue Date: 05/01/17 • Due Date: 05/26/17
Target Award Date: 06/20/17
Configurations-v2 (17 KiB)
RFP-758-17-Addendum-001 (85 KiB)
RFP-758-17P-Personal-Computers (0.2 MiB)
Awarded: Milestone Corp & Dell, Inc.
RFP 757-17P 802 Grand Avenue Roof Replacement
Issue Date: 04/27/17 • Due Date: 05/22/17
1702A-03-24-17-RD1-1 (1.6 MiB)
1702A-03-24-17-RD2-1 (1.8 MiB)
CMC-802-Grand-Reroof-Specifications (1.3 MiB)
RFP-757-17P-802-Grand-Ave -Roof (0.2 MiB)
RFP-757-17P-Addendum-001-05-16-17 (73 KiB)
Sign-In-Sheet-RFP-757 (0.2 MiB)
Awarded:
RFP 756-17P Wide Area Network Services
Issue Date: 04/20/17 • Due Date: 05/24/17
Addendum 002- Due date 05/26/17
Target Award Date: 06/16/17 06/27/17
Addendum-001-RFQ-756-17P (79 KiB)
Appendix A – Physical Locations (71 KiB)
Appendix B - Desired Service Options (44 KiB)
RFP-756-17P Wide Area Network Services (0.2 MiB)
RFP-756-17P-Addendum-002 (65 KiB)
Awarded:
ADVODA Communications (Rhize)
Qwest Communications/CenturyLink
Visionary Communications
RFQ 755Q-17Q John Deere Tractor/Mower
Issue Date: 04/19/17 • Due Date: 05/08/17
Addendum-001-RFQ-755-17Q (65 KiB)
Bid Sheet RFQ-755-17Q John Deere Tractor-Mower (15 KiB)
RFQ-755-17Q John Deere Tractor-Mower (0.1 MiB)
Awarded: The Akana Group
RFQ 754-17Q Electrical Parts & Supplies
Issue Date: 04/20/17 • Due Date: 05/03/17
Target Award Date Extended to 05/26/17
Addendum-001-754-17Q-Electrical-Parts-Supplies (67 KiB)
Bid-Sheet-RFQ-754-17-Electrical-Parts-Supplies-v2 (15 KiB)
RFQ-754-17 Electrical Parts & Supplies (0.1 MiB)
Awarded: LED Supply Co.
RFP 753-17P Smart Classroom Upgrade
Issue Date: 04/07/17 • Due Date: 04/27/17
RFP-753-17p Bid Sheet (13 KiB)
RFP-753-17P Smart Classroom Upgrade V.2 (0.2 MiB)
Awarded: CCS Presentation Systems
RFP 752-17P Hill Hall & Neas Dining Kitchen Center Deep Clean
Issue Date: 03/24/17 • Due Date: 04/28/17
RFP-752-17P Hill Hall & Neas Dining Center Kitchen Deep Clean V 2 (0.3 MiB)
Awarded: The Key People
RFP 751-17P Residence Halls Painting
(Leadville, Steamboat and Spring Valley)
Issue Date: 03/22/17 • Due Date: 04/24/17
Addendum 001 751-17P Res Hall Painting (72 KiB)
RFP-751-17P Residence Halls Painting (0.2 MiB)
Sign-In Sheet SB 751-17 (0.1 MiB)
Sign-In Sheet SVC (0.2 MiB)
Awarded: Southwestern Painting
RFP 750-17P Dillon Roof Renovation
Issue Date: 03/20/17 • Due Date: 04/13/17
Walk through: 03/29/17; 1:00 p.m.
1702B-03-13-17 DR1 (1) (2.0 MiB)
1702B-03-13-17 DR2 (1) (1.8 MiB)
750-17P Addendum 002 (0.1 MiB)
CMC Dillon Reroof Specifications (1.4 MiB)
RFP-750-17P Addendum 001 FY2016-17 (64 KiB)
RFP-750-17P Dillon Roof Renovation V2 (0.2 MiB)
Sign-In Sheet Dillon Roof (0.2 MiB)
Awarded: Z Craft
RFP 749-17P Module Heating Control Valves
Issue Date: 03/17/17 • Due Date: 04/17/17
Leadvile Res (22.9 MiB)
RFP-749-17P Heating Control Valves Leadville (0.2 MiB)
Sign-In Sheet 749-17P (0.8 MiB)
Awarded: Tolin Mechanical Systems
RFP 748-17P Module Replacement Leadville Campus
Issue Date: 03/17/17 • Due Date: 04/17/17
Leadvile Res (22.9 MiB)
RFP-748-17P Module Replacement Leadville (0.2 MiB)
Sign-In Sheet 748-17P (0.7 MiB)
Awarded: ATS Rocky Mtn.
RFP 747-17P Residence Halls Remodel
(Leadville, Steamboat and Spring Valley)
Issue Date: 03/14/17 • Due Date: 04/14/17
747-17P Addendum 001 (0.1 MiB)
CMC Res Hall Unit Improvements-2017 DEM1 (1) (1.0 MiB)
CMC Res Hall Unit Improvements-2017 REN1 (1) (2.4 MiB)
Res Hall Remodel Bid Sheet (17 KiB)
RFP-747-17P Resident Hall Remodels 2 (0.2 MiB)
Sign-In Sheet Leadville 747-17P (0.9 MiB)
Sign-In Sheet Leadville 747-17P (0.9 MiB)
Sign-In Sheet Spring Valley Campus (0.7 MiB)
Sign-In Sheet Steamboat Springs (0.2 MiB)
Specifications-CMC Residence Hall Remodels-03-09-17 (7.0 MiB)
Awarded:
Hess Contracting, Inc.
Classic Contractors, Inc.
RFQ 746-17Q Bike Mechanical Course Tools
Issue Date: 03/13/17 • Due Date: 05/09/17
746-17Q Bike Mechanical Course Tools Bid Sheet (19 KiB)
RFQ-746-17Q Bike Mechanic Course Tools (0.1 MiB)
Awarded:
RFI 743-17I Catering Services Cooper Common
Issue Date: 01/27/17 • Due Date: 03/16/17
RFI-743-17I Catering Services Cooper Commons V2 (0.1 MiB)
Awarded:
Smoke Modern Barbeque
Sodexo
RFQ 745-17Q Nursing Simulation Emergency Crash Carts
Issue Date: 01/27/17 • Due Date: 02/15/17
745-17Q Crash Carts Bid Sheet (16 KiB)
RFQ-745-17Q Nursing Simulation Crash Carts (97 KiB)
Target Award Date: 02/27/17
Awarded: DiaMedical
RFQ 744-17Q Etching Press
Issue Date: 01/26/17 • Due Date: 02/14/17
RFQ-744-17 Etching Press (95 KiB)
Awarded: No Award
RFQ 742-16Q Common Reader Program "No Barriers" Book Purchase
Issue Date: 01/10/17 • Due Date: 01/23/17
Campus Addresses Contact Book Order 17-18 RFQ-742-17 (83 KiB)
RFQ-742-17Q Common Reader Program No Barriers Book Purchase (0.1 MiB)
Awarded: Complete Book & Media Supply, LLC
RFQ 741-16Q SVC Cardio & Strength Equipment
Issue Date: 12/14/16 • Due Date: 01/05/17
741-16Q Bid SheetV2 (14 KiB)
741-16Q SVC Cardio & Strength Equipment (0.1 MiB)
Hoist Mi7 Functional Trainer (5.1 MiB)
Matrix C3x (1.2 MiB)
Matrix E3x (1.2 MiB)
Matrix Functional Trainer (0.4 MiB)
Matrix Magnetic Rower (1.2 MiB)
Matrix T3x (1.0 MiB)
Matrix U3x (0.8 MiB)
RFQ-741-16 Addendum 001 (80 KiB)
RFQ-741-16 Comparison Sheet SVC Cardio & Strength EquipV2 (14 KiB)
Student Center Floor Plan (36 KiB)
Target Award Date: 01/20/17
Awarded: Healthy Styles Exercise
RFQ 740-16Q 802 Grand- South Building Ceiling Insulation
Issue Date: 11/14/16 • Due Date: 11/28/16
802 Grand- South Building Ceiling Insulation RFQ (0.1 MiB)
Awarded: InsulVail
RFQ 739-16Q PhaseOne Medium Format Camera Equipment
Issue Date: 11/16/16 • Due Date: 12/06/16
No Addendum
RFQ739-16Q Bid Sheet PhaseOne Medium Format Camera Equipment (12 KiB)
RFQ739-16Q PhaseOne Medium Format Camera Equipment (0.1 MiB)
Awarded: No Award
RFQ 738-16Q NDT Flaw & Thickness Detectors
Issue Date: 11/15/16 • Due Date: 11/30/16
RFQ-738-16Q NDT Detectors (0.1 MiB)
Awarded: No Award
RFP 737-16P Banking Services
Issue Date: 12/09/16 • Due Date: 01/04/17
Addendum 001 RFP-737-16 (0.4 MiB)
Appendix A List Of Accounts Pdf. (0.1 MiB)
Appendix B OP Statements (1.3 MiB)
Appendix C PA Statements (80 KiB)
Appendix D FF Statements (15 KiB)
RFP-737-16P Banking Services V2 (0.1 MiB)
Awarded: Alpine Bank
RFP 736-16P Financial Auditor
Issue Date: 12/22/16 • Due Date: 02/01/17
736-16P Financial Auditor V3 (0.1 MiB)
Addendum 001 (0.1 MiB)
Auditor RFP Insurance Req (44 KiB)
Awarded: Clifton Larson Allen
RFQ 735-16Q Ironworker, Uni-Hydro
Issue Date: 11/04/16 • Due Date: 11/18/16
Awarded: Uni-Hydro Ironworkers
RFQ 734-16Q Campus LED Lights
Issue Date: 10/31/16 • Due Date: 11/28/16 12/05/16
No Addendum 003
Target Award Date: 12/22/16 01/09/17
734-16 LED Lights Bid Summary To Post (20 KiB)
734-16P Addendum 001-01 (67 KiB)
734-16P Addendum 002 (84 KiB)
734-16Q Campus LED Lights (97 KiB)
734-16Q Campus LED Lights Bidsheet - REVISED (18 KiB)
Awarded: No Award
RFP 733-16P Feasibility Study for Fundraising Campaign
Issue Date: 10/20/16 • Due Date: 11/09/16
Short List Candidates:
Community Counseling Services
Eaton Cummings
The Kellogg Organization
733-16P Feasibility Study For Fundraising Campaign 1 (0.2 MiB)
RFP CMCF Questions 10 31 16 (83 KiB)
Awarded: The Kellogg Organization
RFP 732-16P Cathodic Protection Spring Valley Water Tank
Issue Date: 10/20/16 • Due Date: 11/18/16
732-16P Cathodic Protection Spring Valley Water Tank (0.9 MiB)
732-16Q Addendum 001 (64 KiB)
Operation & Maintenance Manual (4.9 MiB)
Short List Candidates:
Corrpro Waterworks
Great Plains Structures
Awarded: Great Plains Structures
RFQ 731-16Q Snow Grooming Vehicle
Issue Date: 09/09/16 • Due Date: 09/19/16
731-16Q Snow Grooming Vehicle (0.1 MiB)
Awarded: Pisten Bully
RFQ 730-16Q Pasco Scientific Interface, Software and Equipment
Issue Date: 09/07/16 • Due Date: 09/16/16
730-16Q Bid Sheet (14 KiB)
RFQ-730-16Q Pasco Scientific Software (0.1 MiB)
Awarded: Pasco Scientific
RFP 729-16P Custodial Services Breckenridge Campus
Issue Date: 09/01/16 • Due Date: 09/28/16
729-16P Custodial Service Breckenridge (0.2 MiB)
729-16P Scope Of Work (14 KiB)
Breckenridge Floor PLan (0.6 MiB)
Square Footage (0.2 MiB)
Awarded:
RFP 728-16P Rifle Secondary 10 Ton Chiller
Issue Date: 09/06/16 • Due Date: 10/05/16
RFP-728-16P Rifle Secondary 10 Ton Chiller 2 (0.2 MiB)
Sign In Sheet Rifle Sec 10 Chillier (0.1 MiB)
Awarded: AMS
RFI 726-16I Contract Writer for Institutional History
Issue Date: 08/30/16 • Due Date: 09/14/16
726-16I Addendum 001 (80 KiB)
726-16I Contract Writer For Institutional History (0.4 MiB)
CMC History Bibliography Sample (42 KiB)
CMC25yrsBook (0.1 MiB)
Awarded: No Award
RFP 724-16P Custodial Services Edwards Campus
Issue Date: 08/26/16 • Due Date: 09/20/16
724-16P Addendum 001 (71 KiB)
724-16P Custodial Service Edwards (0.2 MiB)
724-16P Edwards Scope Of Work (76 KiB)
Edwards Sign In Sheet (14 KiB)
Awarded:
RFP 723-16P Custodial Services Rifle Campus
Issue Date: 08/18/16 • Due Date: 09/13/16
723-16P Cleaning Scope - Rifle (12 KiB)
723-16P Custodial Service Rifle Campus (0.2 MiB)
723-16P Sign In Sheet (0.2 MiB)
Addendum 001 723-16P Custodial Services (65 KiB)
RL RFP 723-16P Building Maps Flooring-no Clean Rooms (1.3 MiB)
Awarded: Barboza Service Cleaning, LLC
RFP 722-16P Cooper Commons Build-out
Issue Date: 08/18/16 • Due Date: 09/19/16
16-0801 Bidding Set (11.3 MiB)
722-16 Sign In Sheet Cooper Commons (2.0 MiB)
722-16P Cooper Commons Addendum 001 (0.1 MiB)
722-16P Cooper Commons Build-out (0.2 MiB)
722-16P Supplemental Information (92 KiB)
Cooper Common Bid Addendum 002 16-0909 (5.4 MiB)
Cooper Commons TI Bid Sheet (44 KiB)
Awarded:
RFQ 721-16Q Indoor Cycle Bikes SVC
Issue Date: 08/15/16 • Due Date: 08/31/16
721-16Q Spin Bikes (0.1 MiB)
721-16Q Spin Bikes SVC (13 KiB)
Awarded: Altitude Fitness
RFP 720-16P Custodial Services Steamboat Springs Campus
Issue Date: 07/10/16 • Due Date: 08/29/16
720-16P Custodial Service (0.2 MiB)
Custodial Bid Sheet - Final (12 KiB)
Floor Plans-Squ Footage (0.2 MiB)
Sign In Sheet 720-16P (0.1 MiB)
Awarded: ServiceMaster
RFI 719-16I Contractor for Repair and Construction Work as Needed
Issue Date: 07/20/16 • Due Date: 08/05/16
719-16I Contractor For Repair (0.1 MiB)
Awarded: No Award
RFQ 718-16Q Laerdal SimMan 3G Manikin
Issue Date: 07/19/16 • Due Date: 07/25/16
RFQ-718-16Q Laerdal Bid Sheet (14 KiB)
RFQ-718-16Q Laerdal SimMan 3G (96 KiB)
Awarded: Laerdal
RFQ 717-16Q Bobcat Toolcat 5600 Trade in
Issue Date: 07/14/16 • Due Date: 07/27/16
717-16Q Bobcat Toolcat 5600G (0.1 MiB)
Addendum 001 717-16Q Bobcat Toolcat 5600 Trade In (0.8 MiB)
Awarded: Severson Supply
RFQ 716-16Q Indoor Cycle Bikes SVC
Issue Date: 07/11/16 • Due Date: 07/19/16
716-16Q Cycling Bikes SVC (0.1 MiB)
Awarded: No Award
RFI 715-16P Office Trailer SVC
Issue Date: 06/15/16 • Due Date: 06/21/16
715-16 Office Trailer SVC (0.1 MiB)
Awarded: Cancelled
RFP 714-16P Refunding the Series 2007 COPS
Issue Date: 06/09/16 • Due Date: 06/29/16
Appendix A (33 KiB)
RFP-714-16P Refunding Series 2007 COPS (0.7 MiB)
Awarded: North Slope
RFQ 713-16Q Stand-up Paddle Boards
Issue Date: 05/27/16 • Due Date: 06/03/16
713-16Q Stand-up Paddle Boards (97 KiB)
Awarded: Hala Gear
RFQ 712-16Q SMART UPS Units
Issue Date: 05/20/16 • Due Date: 05/27/16
712-16Q SMART UPS Units (0.1 MiB)
Addendum 001 712-16 (74 KiB)
Awarded: CDWG
RFQ 711-16Q Parking Lot LED Fixtures Breckenridge
Issue Date: 05/11/16 • Due Date: 05/25/16
711-16Q Bid Sheet (13 KiB)
711-16Q Parking Lot LED Fixtures (0.1 MiB)
Addendum 001 (87 KiB)
CMC Parking Lot 2 (78 KiB)
Lighting Specification Sheet (2.4 MiB)
Awarded: Batteries Plus
RFP 710-16P Vet. Tech. Water Line Replacement
Issue Date: 05/02/16 • Due Date: 05/27/16 05/31/16
710-16P Vet Tech Water Line (0.2 MiB)
Addendum 001 (75 KiB)
Overall Water System SVC (9.3 MiB)
Sign In Sheet 710-16P (0.6 MiB)
Vet Tech Waterline Repair 4-29 - 2016 (38 KiB)
Awarded:
RFP 709-16P Parking Lot Maintenance Edwards
Issue Date: 04/21/16 • Due Date: 06/06/16
709-16P Parking Lot Maintenance Edwards Campus 1 (0.2 MiB)
Addendum 001 (0.4 MiB)
Sign In Sheet 709-16P (78 KiB)
Awarded:
RFP 708-16P Computer Job Skills Workshop (CJSW)
Issue Date: 04/21/16 • Due Date: 05/12/16
708-16P Computer Job Skills Workshops (0.2 MiB)
Awarded:
RFP 707-16P Rocky Mountain Fen Research Project
Issue Date: 04/13/16 • Due Date: 05/27/16
707-16P Exhibit C (2.5 MiB)
707-16P Rocky Mountain Fen Research (0.1 MiB)
Addendum 001 (32 KiB)
Fen Reaper (10.3 MiB)
Inserts - ACAD Drawings 1-4 (10.0 MiB)
Inserts - ACAD Drawings 5-7 (5.6 MiB)
Revised Stockpile Area (0.9 MiB)
RMFRP Bid Sheet (14 KiB)
RMFRP Timeline (76 KiB)
Awarded: Habitat Construction (conditional)
RFP 706-16P Crown Point Addition/Remodel
Issue Date: 04/01/16 • Due Date: 04/29/16
14240 Elev Spec (18 KiB)
15173 MEP ELEVATOR REMODEL LEADVILLE CMC (1.0 MiB)
A11 (0.7 MiB)
A21 (1.2 MiB)
A22 (1.2 MiB)
A31 (0.6 MiB)
A41 (0.6 MiB)
A51 (2.0 MiB)
Addendum 001 Combined Files (0.2 MiB)
Arch Specs Part 1 (1.0 MiB)
Arch Specs Part 2 (3.0 MiB)
CMC STRUCTURAL LEADVILLE PLANS (1.6 MiB)
Crown Point RFP Budget (40 KiB)
CVR (1.4 MiB)
MEP Specs (3.4 MiB)
RFP-706-16P Crown Point Addition-Remodel (0.2 MiB)
Sign-In Sheet 706-16P (70 KiB)
Short List Candidates:
- Dare-Case Contracting Services, LLC
- KW Construction & Restoration
Awarded: KW Construction & Restoration
RFQ 705-16Q Mountain View Res. Hall Corridor Lighting
Issue Date: 03/30/16 • Due Date: 04/18/16
705-16Q Mountain View Res Hall Corridor Lighting (0.1 MiB)
Target Award Date: 05/06/16
Awarded: Voss Lighting
RFP 704-16P Foundation Audit & Tax Services
Issue Date: 03/29/16 • Due Date: 04/18/16
704-16P Addendum 001 (79 KiB)
704-16P Foundation Audit & Tax Services (0.2 MiB)
990 Form (0.5 MiB)
CMCf AUDIT - 2015 Final (0.9 MiB)
Short List Candidates:
- Kundinger, Corder & Engle, PC
- McMahan And Associates, LLC
Awarded:
RFP 703-16P Aspen Locker Room Remodel
Issue Date: 03/22/16 • Due Date: 04/19/16
703-16P A21 Revised (2.0 MiB)
703-16P Aspen Locker Room Remodel (0.2 MiB)
703-16P Photo Of Finish For Aspen Locker Remodel (1.7 MiB)
Shower Plan 703-16P (0.3 MiB)
Sign-In Sheet 703-16P (93 KiB)
Mandatory Walkthrough: 03/31/16 to 03/30/16
Awarded: MM-Eight (conditional)
RFP 702-16P Operable Window Conversion CS
Issue Date: 03/17/16 • Due Date: 04/26/16
702-16P Operable Window Conversion (0.2 MiB)
Sign-In Sheet 702-16P (62 KiB)
Awarded: Elmer Glass (conditional)
RFQ 701-16Q 12 Passenger Van RFC
Issue Date: 03/15/16 • Due Date: 03/31/16
701-16Q 12 Passenger Van (0.1 MiB)
Awarded:
RFP 700-16P SVC Interior/Exterior Painting
Issue Date: 03/21/16 • Due Date: 04/15/16
700-16P Addendum 001 (71 KiB)
700-16P SVC Interior-Exterior Painting (0.2 MiB)
Bid Sheet 700-16P (15 KiB)
Sign-In Sheet SVC Interior Exterior Painting (30 KiB)
Short List Candidates:
- Southwestern Painting
- Steve Molinari Painting LTD
Awarded:
RFQ 699-16Q Laser Engraver New Media RFC
Issue Date: 03/07/16 • Due Date: 03/16/16
699-16Q Bid Sheet (12 KiB)
699-16Q Laser Engraver RFC New Media (0.1 MiB)
Awarded:
RFP 698-16P Rifle Campus Driveway Access Improvements
Issue Date: 03/03/16 • Due Date: 04/08/16
15206 Rifle CMC Design (0.4 MiB)
698-16P Rifle Campus Driveway Access Improvement (0.2 MiB)
Bid Schedule Document 15206 RL Driveway Access Imp (0.7 MiB)
Contractor Sign In RFP 698-16P (0.8 MiB)
Awarded: Tamerrel Excavation Inc.
RFP 697-16P Financial Advisor
Issue Date: 03/02/16 • Due Date: 03/24/16
697-16P Financial Advisor (0.1 MiB)
697-16P Financial Advisor Addendum 001 (59 KiB)
FACILITIES MASTER PLANNING PROCESS 2016 (002) (73 KiB)
March 4 2016 Board Update Rev 1 (0.1 MiB)
Short List Candidates
- Blue Rose Capital Advisors
- DA Davidson
- North Slope Capital Advisory
- The PFM Group
Target Award Date: 04/30/16
Awarded:
RFQ 696-16Q Folding Classroom Tables Leadville
Issue Date: 02/18/16 • Due Date: 02/23/16
696-16Q Classroom Tables Leadville Campus (0.1 MiB)
Awarded: Mity-Lite
RFQ 695-16Q Motor Pool Vehicle for College President
Issue Date: 02/16/16 • Due Date: 02/19/16
695-16Q Motor Pool Vehicle For President (0.1 MiB)
Target Award Date: 05/19/16
Awarded:
RFQ 694-16Q Trimble Survey Unit & Accessories
Issue Date: 02/08/16 • Due Date: 02/16/16
694-16Q Trimble Bid Sheet (13 KiB)
RFQ-694-16Q Trimble (0.1 MiB)
Awarded: Frontier Precision
RFP 693-16P Compliance Review of Grants
Issue Date: 02/05/16 • Due Date: 02/26/16
693-16P Addendum 001 (0.1 MiB)
RFP 693-15 Compliance Review Of Grants (0.2 MiB)
Questions due answered: 02/22/16
Short List Candidates
- Baer Financial Group
- Clifton Larson Allen
- Colorado Independent Consultants
- Rubin Brown
RFP Due: 2/26/16, 2/29/16
Awarded: Baer Financial Group
RFP 692-16P WiQ
(Leadville, Spring Valley & Steamboat Springs Campuses)
Issue Date: 01/28/16 • Due Date: 03/17/16
692-16P WiQ (0.2 MiB)
LeadvilleWiQ (50 KiB)
WiQ Access Control Hardware Spec (REV 1) (78 KiB)
No questions submitted by vendors attending Mandatory Walkthrough
Awarded: Colorado Doorways
RFP 691-16P Residence Hall Remodels
(Leadville and Spring Valley Campuses)
Issue Date: 01/25/16 • Due Date: 03/10/16
691-16P LeadvilleResidentHallSignInSheet (0.4 MiB)
691-16P Res Hall Remodel Addendum 001 (89 KiB)
691-16P Residence Hall RemodelsV2 (0.2 MiB)
691-16P SVCSignInSheet (0.6 MiB)
A21 (0.8 MiB)
A22 (2.0 MiB)
Blank Bid Tab For Fire Suppression System-02.04.2016 (37 KiB)
CMC SPECIAL CONDITIONS-02.04.2016 (0.1 MiB)
CMC SV Academic Center FP-sprinklers R Us (0.6 MiB)
Revised Kitchen Layout 1-29-16 (0.1 MiB)
Awarded: Hess Contracting Inc. and ResCom Construction LLC.
RFQ 690-16Q Copier Spring Valley Campus
Issue Date: 01/28/16 • Due Date: 02/09/16
Comparison Sheet RFQ-690-16Q (21 KiB)
RFQ-690-16Q Spring Valley Campus Copier1 (0.1 MiB)
Awarded: Capital Business Solutions
RFQ 689-16Q Digital Media Equipment RFC
Issue Date: 01/27/16 • Due Date: 02/04/16
689-16Q RFC Digital Media Equipment (0.1 MiB)
RFC Digital Media (17 KiB)
Awarded: Adorama
RFQ 688-15Q Cafeteria Furniture Spring Valley Campus
Issue Date: 01/08/16 • Due Date: 01/25/16
688-15Q Spring Valley Cafeteria Furniture (0.1 MiB)
688-16P Bid Sheet Cafeteria Furniture (13 KiB)
Awarded: Canter & Associates
RFP 687-15P Heating Valve & Actuator Replacement Hill Hall
Issue Date: 01/06/16 • Due Date: 2/11/16
687-15P Heating Valve & Actuator Replacement (0.2 MiB)
687-15P Heating Valve & Actuator Sign In Sheet (0.4 MiB)
Addendum 001 687-16P (79 KiB)
M1.1 (1.8 MiB)
M1.2 (1.6 MiB)
M1.3 (1.7 MiB)
M1.4 (1.5 MiB)
M2.1 (1.5 MiB)
Awarded: Tolin Mechanical
RFP 686-15P Module Replacement Hill Hall
Issue Date: 12/22/15 • Due Date: 2/9/16
686-15P Module Replacement Sign In Sheet (0.6 MiB)
RFP-686-15P Module Replacement Hill Hall 1 (0.2 MiB)
Awarded: ATS Rocky Mountain
RFQ 685-15Q LED Lighting Hill Hall
Issue Date: 12/10/15 • Due Date: 12/16/15
685-15Q Bid Sheet (13 KiB)
685-15Q Hill Hall LED Lighting (0.1 MiB)
Awarded: Not Awarded
RFI 684-15I Refinance of Certificates of Participation
Issue Date: 11/20/15 • Due Date: 11/30/15
684-15I Refinance Of Certificates Of Participation (0.1 MiB)
Awarded: CMC appreciates 8 firms submitting responses to this RFI. We expect to issue a formal RFP in mid to late January. All firms that submitted a response to the RFI will be notified of the RFP upon its issuance. Thank you.
RFP 683-15P Procurement Card Services (P-card)
Issue Date: 12/22/15 • Due Date: 1/29/16
683-15P P-card Provider Bidsheet1 (19 KiB)
683-15P Procurement Card Services 1 (0.3 MiB)
Addendum 001 RFP (69 KiB)
Short List of Vendors Announced- 02/16/16, 03/24/16
Target Award Date: 10/01/16
Awarded:
RFP 682-15P Cisco WebEx Enterprise for Education
Issue Date: 11/17/15 • Due Date: 12/16/15
682-15P Cisco WebEx Addendum 002 (81 KiB)
682-15P Cisco WebEx Enterprise For Education (0.1 MiB)
Addendum 001 682-15P (72 KiB)
Short List: 02/05/2016
Candidate Interviews: 02/23/2016
Target Award: 03/15/2016
Awarded: Flair Data Systems, Inc.
RFQ 681-15Q Kiosk Stands
Issue Date: 11/12/15 • Due Date: 11/20/15
681-15Q Kiosk Stands (0.1 MiB)
Awarded: CDW-G
RFP 680-15P Insurance Broker
Issue Date: 11/06/15 • Due Date: 12/02/15
680-15P Insurance Broker Addendum 001 (91 KiB)
680-15P Insurance Broker Addendum 002 (71 KiB)
CMC Insurance Summary (13 KiB)
RFP-680-05P Insurance Broker (0.2 MiB)
Short List Candidates
- Arthur J. Gallagher & Co.
- Alliant Insurance Services, Inc.
- IMA
- Flood & Peterson
Awarded: IMA
RFP 679-15P ASL Interpretation Summit Campus
Issue Date: 11/03/15 • Due Date: 11/19/15
679-15P ASL Interpretation Summit Campus (0.1 MiB)
Awarded: No Award
RFP 678-15P Campus Security Consultant
Issue Date: 10/20/15 • Due Date: 11/18/15
678-15P Campus Security Consultant (0.2 MiB)
Addendum 001 Campus Security Consultant (64 KiB)
Addendum 002 RFP-678-15P Campus Security Consultant (0.1 MiB)
Addendum 003 678-15P Campus Security Consultant - (84 KiB)
ERP Spring Valley 11.2015 (0.6 MiB)
Updated Short List Candidates
- Atlas Group
- Elert & Associates
- Margolis Healy
Target Award Date: 02/19/16
Awarded: Elert & Associates
RFQ 677-15Q 15 Capacity Passenger Buses
Issue Date: 10/16/15 • Due Date: 10/21/15
Target Award date extended: 11/13/15
RFQ-677-15Q 15 Capacity Passenger Buses (0.1 MiB)
Awarded: Creative Bus Sales
RFQ 676-15Q Cisco LAN Wireless Controllers & Switches
Issue Date: 09/30/15 • Due Date: 10/05/15
676-15Q Bid Sheet1 (16 KiB)
RFQ-676-15 Cisco LAN Controllers & Switches (0.1 MiB)
Awarded: Flair Data Systems
RFQ 675-15 Boiler Replacement Carbondale Campus
Issue Date: 09/18/15 • Due Date: 10/12/15
675-15P Addendum 001 (90 KiB)
RFP-675-15P Boiler Replacement Carbondale Campus (0.1 MiB)
SignInSheetRFP-675-15P (0.2 MiB)
Awarded: American Mechanical Services
RFQ 674-15 Laboratory Supplies
Issue Date: 09/02/15 • Due Date: 09/09/15
RFQ-674-15Q Laboratory Supplies (0.1 MiB)
RFQ-674-15Q Laboratory Supplies Bid Sheet (13 KiB)
Awarded: Johnson Scientific & VWR
RFQ 673-15 New Media Equipment
Location Kits, FilmMakers Kit, Sola Location Lighting, Wireless Microphone Kit, Camera,
Paralinx Triton Kit, Location Diffusion Kit, Video Monitoring Kit
Issue Date: 09/01/15 • Due Date: 09/08/15
RFQ-673-15Q New Media (0.1 MiB)
RFQ-673-15Q New Media Bid Sheet 1 (15 KiB)
Awarded: B&H Foto & Electronics Corp.
RFP 672-15 CEPA Texts
Issue Date: 08/28/15 • Due Date: 09/03/15
672-15Q CEPA Texts (0.1 MiB)
Awarded: Follett and Townsend
RFP 671-15 Textbook Provider
Issue Date: 08/28/15 • Due Date: 09/25/15
671-15P Addendum Timeline Extended (34 KiB)
671-15P Textbook Provider (0.7 MiB)
671-15P Textbook Provider Addendum 001- Questions Answered (0.1 MiB)
671-15P Textbook Provider Revised Schedule 9-25-15 (65 KiB)
Short List Candidates:
- Akademos
- eCampus
- MBS Direct
- Rafter
Target Award Date: 02/15/16
Awarded:
RFP 670-15 Campus Security Services
Issue Date: 08/21/15 • Due Date: 10/02/15
670-15P Campus Security Services (0.2 MiB)
670-15P Security Bidsheet (21 KiB)
670-15P Short List Vendors Listed (59 KiB)
Addendum 001 RFP-670-15P Campus Security (91 KiB)
RFP 670-15 List Of Facilities Managers For Campus Tours 1 (10 KiB)
Awarded: Not Awarded
RFQ 669-15 Scientific Equipment/Supplies
Issue Date: 08/20/15 • Due Date: 08/27/15
RFQ-669-15Q Bid Sheet 1 (13 KiB)
RFQ-669-15Q Scientific Equipment-Supplies (39 KiB)
Awarded: Products Unlimited
RFQ 668-15 Laerdal SimMan/Accessories/Warranty/Training
Issue Date: 08/18/15 • Due Date: 08/25/15
RFQ-668-15Q Laerdal (0.1 MiB)
RFQ-668-15Q Laerdal Bid Sheet (14 KiB)
Awarded: Laerdal
RFP 667-15 Spring Valley Veterinary Technology Building Reroof
Issue Date: 08/14/15 • Due Date: 09/09/15
1507F-08-07-15 VR1 (1) (1.6 MiB)
1507F-08-07-15 VR2 (1) (1.5 MiB)
Addendum- Vet Tech 1 (22 KiB)
RFP-667-15 Walkthrough (0.5 MiB)
RFP-667-15P Vet Tech Building Reroof (0.1 MiB)
Vet Tech Specifications (0.8 MiB)
No Candidate Interviews will be scheduled.
Awarded: Mullenax Construction & Roofing
RFP 666-15 Dillon Campus Reroof
Issue Date: 08/10/15 • Due Date: 09/01/15
1506C-07-31-15 DR1 (1) (1.7 MiB)
1506C-07-31-15 DR2 (1) (0.8 MiB)
Dillon Reroof Specifications (1.8 MiB)
Dillon Walthrough Sign In Sheet (0.4 MiB)
DillonRoofPlan (0.3 MiB)
RFP 666-15-Addendum 1 (0.9 MiB)
RFP-666-15P (0.1 MiB)
VE Option 1 & Option 2 (49 KiB)
Target Award Date changed to 09/25/15
Awarded: B&M
RFP 665-15 Campus Security Services
Issue Date: 08/14/15 • Due Date: TBD
Awarded: Not awarded. Replaced by RFP 670-15
RFI 664-15 Natural Gas Transport
Issue Date: 07-30-15 • Due Date: 08-13-15
664-15I Gas Transport (94 KiB)
Awarded: No award
RFQ 663-15 LED Parking Lot Fixtures
Issue Date: 07-30-15 • Due Date: 08-11-15
Addendum 001 RFQ-663-15Q (79 KiB)
RFQ-663-15Q Bid Sheet 2 (14 KiB)
RFQ-663-15Q LED Parking Lot Fixtures 1 (0.1 MiB)
Awarded: All-Phase Electric
RFP 662-15 Asphalt
Issue Date: 07-24-15 • Due Date: 08-20-15
Annex Arial ViewONLY (0.1 MiB)
Dillon Walkthrough (0.2 MiB)
Leadville Walkthrough (0.1 MiB)
Map Alpine Parking-Pedestrian Access (49 KiB)
RFP-662-15 Steamboat Walkthrough List (0.1 MiB)
RFP-662-15P Asphalt 1 (0.1 MiB)
Awarded: Connell Resources, Inc.
RFQ 661-15 Cisco Access Points
Issue Date: 07-02-15 • Due Date: 07-15-15
Cisco Access Point Specifications (0.2 MiB)
RFQ-661-15 Cisco Access Points (0.1 MiB)
Awarded: Flair Data Systems
RFP 660-15 Cisco SMARTnet renewal
Issue Date: 06-22-15 • Due Date: 06-26-15
RFP-660-15 Cisco SMARTnet Renewal Yearly (0.2 MiB)
SMARTnet Renewal Details (68 KiB)
Awarded: Flair Data Systems
RFP 659-15 Energy Management & Environmental Impact Plan
Issue Date: 06-12-15 • Due Date: 07-06-15 07-09-15
659-15P Bid Sheet (15 KiB)
659-15P Energy Management & Environmental Impact Study (0.2 MiB)
Addendum 001 - Timeline Dates Changed (74 KiB)
Addendum 002 - Questions Answered (0.1 MiB)
Addendum 003 - Amended Dates (65 KiB)
ClimateActionPlan CMC 2012 (0.6 MiB)
CMC TEA Report (3.6 MiB)
CombinedAttachments (11.0 MiB)
Earth Day Poster2015 FINAL-NoBleed (1.3 MiB)
Energy Mgmt Project Tracking (0.1 MiB)
Facilities Energy Conservation Policy (33 KiB)
Physical Plant Attributes for Addendum 002 (21 KiB)
Awarded: Natural Capitalism
RFQ 658-15 • Deduplicated Disk Backup
Issue Date: 06-04-15 • Due Date: 06-26-15, 2pm
Please note the revised Award Date 09/25/15; 10/30/15
658-15Q Data Deduplication (0.1 MiB)
Addendum 001 RFP-658-15 Answered (0.1 MiB)
Primary WAN Layout (0.6 MiB)
Site Data Inventory (0.1 MiB)
Awarded: Venture Technologies
RFI 657-15 • Energy & Environmental Impact Consultant
Issue Date: 05-29-15 • Due Date: 06-02-15
657-15I Energy And Environmental Impact Consultant (0.2 MiB)
Awarded: No Award
RFP 656-15 • Split AC Systems Bristol Hall
Issue Date: 06-02-15 • Due Date: 06-25-15 07/02/15
RFP-656-15P Split AC Systems Bristol Hall (0.2 MiB)
Sign In Sheet 656-15 (75 KiB)
Target Award Date: 07/08/15
Awarded: No Awarded
RFP 655-15 • Emergency Secondary Access Road
Issue Date: 05-18-15 • Due Date: 06-09-15
Addendum 001 RFP-655-15P (3.0 MiB)
RFP-655-15 Walk Through (0.9 MiB)
RFP-655-15P Emergency Secondary Rd (0.2 MiB)
SECONDARY ROAD BID SCHEDULE 2015-05-07 (72 KiB)
SECONDARY ROAD FINAL BID DWGS 2015-05-07 (2.8 MiB)
Awarded: Habitat Construction
RFQ 654-15 • Cisco 10G Aggregation Switches
Issue Date: 05-13-15 • Due Date: 06-03-15
RFQ-654-15Q Cisco 10G Aggregation Switches Bid Sheet (13 KiB)
RFQ-654-15Q Cisco 10G Aggregation Switches (0.2 MiB)
Awarded: Flair Data Systems, Inc.
RFI 653-15 • LED Replacement Heads for Parking Lot Light Poles
Issue Date: 05-04-15 • Due Date: 05-21-15
Addendum 001 RFQ-653-15 Replacement Heads (76 KiB)
Cost Sheet RFQ-653-15 (19 KiB)
Parking Lot Light (1.2 MiB)
RFQ-653-15Q (0.1 MiB)
Awarded: Conserve-A-Watt Lighting, Inc.
RFI 652-15 • Housing Feasibility Study
Issue Date: 04-30-15 • Due Date: 05-26-15
652-15P Housing Feasibility Study (0.2 MiB)
No Addendum was issued.
Short List Candidates:
- RRC Associates
- Scion
- MGT of America
Awarded: Scion
RFI 651-15 • Media Monitoring Service
Issue Date: 04-23-15 • Due Date: 05-05-15
651-15I Media Monitoring Service (83 KiB)
Addendum 001 RFI-651-15 (66 KiB)
Awarded: Meltwater
RFP 650-15 • Concrete Resurfacing at Bristol Hall
Issue Date: 04-24-15 • Due Date: 05-20-15
Addendum 001 RFP-650-15P Concrete Resurfacing (68 KiB)
RFP-650-15P Concrete Resurfacing Bristol Hall (0.2 MiB)
Awarded: Surface Decor Systems, LLC.
RFQ 649-15 • Digital Cinema Camera & Accessories
Issue Date: 04-20-15 • Due Date: 04-27-15
RFQ-649-15Q Digital Cinema Camera Bid Summary Sheet (13 KiB)
RFQ-649-15Q Digital Cinema Camera (0.1 MiB)
Awarded: B&H Photo
RFQ 648-15 • Canon Projector with Lens Kit & Accessories
Issue Date: 04-20-15 • Due Date: 04-27-15
RFQ-648-15Q Canon Projector With Lens Kit (0.1 MiB)
RFQ-648-Q Canon Projector With Lens Kit Bid Summary Sheet (13 KiB)
Awarded: B&H Photo
RFQ 647-15 • Nikon Filmmaker's Kit & Accessories
Issue Date: 04-20-15 • Due Date: 04-27-15
RFQ-647-15Q Nikon Filmmaker's Kit (0.1 MiB)
RFQ-647-Q Nikon Filmmaker's Kit Bid Summary Sheet (14 KiB)
Awarded: B&H Photo
RFQ 646-15 • Canon Camera Video Production Kit & Accessories
Issue Date: 04-20-15 • Due Date: 04-27-15
RFQ-646-15Q Canon Camera Video Production Kit (0.1 MiB)
RFQ-646-Q Bid Summary Sheet (14 KiB)
Awarded: B&H Photo
RFQ 645-15 • Water Softener Residence Hall SVC
Issue Date: 03-24-15 • Due Date: 04-13-15
645-15Q Water Softener & Install (0.1 MiB)
Addendum 001 RFP-645-15Q (68 KiB)
Sign In Sheet Water Softener RFQ-645-15 (0.4 MiB)
Awarded: Culligan
RFP 644-15 • Painting Exterior Bristol Hall/Interior Hill Hall
Issue Date: 03-24-15 • Due Date: 04-13-15
RFP-644-15P- Painting Exterior Bristol Hall/Interior Hill Hall (0.2 MiB)
Room Drawing (0.3 MiB)
Awarded: Southwestern Painting
RFP 643-15 • Deep Clean Hill Hall/Dining Hall
Issue Date: 03-24-15 • Due Date: 04-17-15
RFP-643-15P Deep Clean Hill Hall and Dining Hall (0.2 MiB)
Awarded: Service Master- Dining Hall; The Key People- Hill Hall Dorms
RFP 642-15 • Carpet and VCT
Issue Date: 03-23-15 • Due Date: 04-14-15
642-15 Carpet & VCT (0.2 MiB)
Awarded: No Bids Received (went out for quotes =Carpet One)
RFQ 641-15 • 24' Ceiling Fan
Issue Date: 03-19-15 • Due Date: 03-30-15
641-15Q 24' Ceiling Fan (0.1 MiB)
Addendum 001 (72 KiB)
Addendum 002 With Drawings (1.3 MiB)
Awarded: Big A** Solutions
RFP 640-15 • Training for Microsoft System Center Configuration Manager 2012
Issue Date: 03-19-15 • Due Date: 04-03-15
640-15P Training Microsoft (0.2 MiB)
Addendum 001 (74 KiB)
Addendum 002 RFP-640-15 (65 KiB)
Awarded: Tech Sherpas
RFP 639-15 • Boiler Cleaning and Maintenance
Issue Date: 03-16-15 • Due Date: 04-06-15
639-15P Boiler Cleaning And Maintenance (0.2 MiB)
Awarded: Iron Horse Water
RFP 638-15 • Spring Valley Storage Shed
Please note: The purchasing department is working with the Spring Valley Campus to determine a best course of action as all proposals came in over budget. This will delay the process for 2-4 weeks. We appreciate your patience.
Issue Date: 02-25-15 • Due Date: 04-13-15
Updated RFP Time Frame: | DATE | TIME |
---|---|---|
issue date | 02/25/15 | 4:00 PM |
Mandatory Pre- Proposal Walkthrough | 03/23/15 | 2:00 PM |
Questions and Clarifications Due | 03/27/15 | 2:00 PM |
Questions Answered | 04/02/15 | 4:00 PM |
Request for Proposals (RFP) Due | 04/13/15 | 2:00 PM |
Short List of Vendors Announced | 04/15/15 | 4:00 PM |
Candidate Interview (if necessary – save the date) | 04/20/15 | TBD |
Target Award Date (Subject to Change) | Until Further Notice |
638-15 Sign In Sheet (0.2 MiB)
638-15 Storage Shed (4.4 MiB)
Addendum 001 638-15P Storage Shed - Spring Valley Campus (0.1 MiB)
Addendum 002 SVC Storage Shed (64 KiB)
Bid Sheet SV Storage Shed 638-15P (0.8 MiB)
RFP-638-15 Subsoil Study Signed (0.8 MiB)
Awarded: No award
RFQ 637-15 • Aspen Exterior Painting
Issue Date: 02-04-15 • Due Date: 04-8-15
637-15Q Aspen Painting (0.4 MiB)
RFP 637-15Q Sign In Sheet Aspen Campus (36 KiB)
Awarded: Randy Ball Painting
RFQ 636-15 • Rifle Parking Pad
Issue Date: 01-23-15 • Due Date: 02-18-15
636-15 Addendum 001 (0.2 MiB)
636-15Q Rifle Parking Pad (0.1 MiB)
636-15Q Sign In Sheet (67 KiB)
Photo 1 (0.2 MiB)
Photo 2 (0.2 MiB)
Photo 3 (87 KiB)
Photo 4 (86 KiB)
Awarded: Phoenix Industrie